Post Job Free

Resume

Sign in

Electrical Engineer Supervisor

Location:
Muscat, Muscat Governorate, Oman
Posted:
August 24, 2023

Contact this candidate

Resume:

Muhammad ZafarIqbal

E&I Engineer

GSM Oman: 009**-********

GSM Oman: 009**-********

GSM PAK: 0092-03016006641

Email: ady7bh@r.postjobfree.com

Email: ady7bh@r.postjobfree.com

Personal Information

Name : Muhammad ZafarIqbal

Date of Birth : 21/01/1981

Nationality : Pakistani

Marital status : Married

Languages Known : English, Urdu,Punjabiand Arabic.

Oman Resident card : 70942044

Oman Driving License : 70942044

Majan Electricity License : 70942044

Gulf Experience : 17 Years

Pakistan id number : 33100-1001839-3

Profile

Highly professional and over 21 years of experience in Electrical Engineering and instrument Inspection works as per International standards and clients specifications.

Ability to learn quickly, follow the procedure exactly, solve problems independently and always willing to accept significant responsibility and involvement.

Educational Background

3Year Diploma in Electrical Engineering. 2001

Majan Electricity Company (SAOC). OMAN

Electrical Licence Holder of Majan Electricity Company.oman

Exposure to Codes

NATIONAL ELECTRICAL CODE (NEC) AND PETROLEUM DEVLPOMENT OMAN STANDARDS

WORK EXPERIENCE

(OVER 21 YEARS)

Experienced for all Engineering functions involving Electrical and Maintenance. Also well familiar with all QA/QC and Commissioning Procedures.

Work History IN OMAN

FROM 05-12-2005 TO 15-12-2006

COMPANY Abu Malak Al LawatiTrad and Cont.Co.L.L.C.

POSITION Electrical Supervisor

PROJECT Sohar Power and Desalination Water plant .

LOCATION Sohar, SULTANATE OF OMAN

FROM 20-12-2006 TO 17-04-2008

COMPANY ALNahdha United L.L.C

POSITION Electrical Supervisor

PROJECT Sohar Methanol Project.

LOCATION Sohar,SULTANATE OF OMAN

FROM 25-04-2008 TO 10-03-2009

COMPANY Daesun Electric And Communication& Co LLC

POSITION Electrical Supervisor

PROJECT Sohar Aromatic Project

LOCATION Sohar,SULTANATE OF OMAN

FROM 20-03-2009 TO 20-10-2010

COMPANY For Sight Drilling Company(FD-7)

POSITION Electrical & Maintenance Supervisor

PROJECT FD-7 RigFor Maintenance

LOCATION Larsen & Toubro Sohar Port

Sohar,SULTANATE OF OMAN

FROM 27-10-2010 TO 05-06-2013

COMPANY Alnahdha Overseas L.L.C

POSITION Electrical Engineer

PROJECT Sohar Fertilizer, Sohar Refinery petrochemical.

LOCATION Sohar Port

Sohar,SULTANATE OF OMAN

FROM 15-06-2013 TO 25-05-2015

COMPANY TMK Gulf international pipe industry LLC.

POSITION Electrical Supervisor

PROJECT Gulf international pipe industry LLC.

LOCATION Sohar industrial sniya.

Sohar,SULTANATE OF OMAN

FROM 07-06-2015 TO 30-01-2016

COMPANY Best Power Construction Company LLC.

POSITION Electrical Engineer

PROJECT Jindal shahdeed Rolling Mill.

LOCATION Sohar Port.

Sohar,SULTANATE OF OMAN

FROM 02-02-2016 TO 31-01-2017

COMPANY Daelim-Petrofac SRIP Joint Venture.(DAEMYUNG)

POSITION Electrical Supervisor

PROJECT Sohar Refinery Improvement Project.

LOCATION Sohar Port.

SULTANATE OF OMAN

FROM 05-02-2017 TO 30-12-2017

COMPANY Central Gulf Engineeringcompany

POSITION Electrical Supervisor

PROJECT Jindal shahdeed Rolling Mill.Steel Melting Shop.

LOCATION Sohar Port.

Sohar,SULTANATE OF OMAN

FROM 02-01-2018 TO 30-06-2018

COMPANY Bilad Oman Steel Factory.

POSITION Electrical Supervisor

PROJECT Bilad Oman Steel Factory

LOCATION Sohar Industrial State.

SULTANATE OF OMAN

FROM 01-07-2018 TO 22-08-2019

COMPANY China national chemical engineering third construction co.

POSITION Electrical QC Engineer

PROJECT Liwa plastic industries complex

LOCATION Sohar,SULTANATE OF OMAN

FROM 02-09-2019 TO 09-04-2020

COMPANY Binzagr Factory for insulation Materials company LLC.

POSITION Electrical Engineer

PROJECT Vale Oman Pelletizing Company LLC.

LOCATION Sohar,SULTANATE OF OMAN

FROM 03-05-2020 TO 30-12-2020

COMPANY Renewable Technical Contracting.

POSITION Electrical Engineer

PROJECT 25 Mega Watt Solar Power Project.

LOCATION Sohar,SULTANATE OF OMAN

FROM 02-01-2021 TO 30-05-2021

COMPANY Golden Sands Corporation L.L.C.

POSITION E&I Engineer

PROJECT Calcined Coke plant Shinvera Carbon.

LOCATION Sohar,SULTANATE OF OMAN

FROM 01-06-2021 TO 30-07-2021

COMPANY Contromet-inco at TRD

POSITION E&I Engineer

PROJECT Duqum Refinery EPC PKG-1

LOCATION Duqum,SULTANATE OF OMAN

FROM 01-08-2021 TO 24-03-2022

COMPANY Al salam International

POSITION E&I Engineer

PROJECT IbriSolorpv Independent power project

LOCATION IBRI,SULTANATE OF OMAN

FROM 30-03-2022 TO 31-12-2022

COMPANY INCO EngineeringManufacturing(Samsung & Petrofac)

POSITION E&I QC Engineer

PROJECT Duqum Refinery Project EPC2

LOCATION DUQUM,SULTANATE OF OMAN

FROM 04-01-2023 TO Till Date Working

COMPANY Gulf Al Malook Trad.& Cont.(REC)

POSITION E&I QC Engineer

PROJECT Bahwan & Veolia Sur Desalination Water Plant

LOCATION SUR,SULTANATE OF OMAN

Training Undergone

CompletedOrpic training courses, Safety induction, PTW training,LOTO

,Precommissioning and confined space safety training.

IT Skills

Application MS office(Word & Excel).

Operating system Windows 98-2000 & XP.

Work EXPERIENCE IN PAKISTAN

1) Worked as Developer and Maker of Electric Control panel in Madina Engineering Work from 09/01/2001 to 12/12/2001.

2) Worked as Trainee Electrician in Hussain Printing Faisalabad from 01/01/2002 to 30/06/2002.

3) Worked as Electrician in jeeaTextil (pvt)ltd from 04/07/2002 to 20/07/2003.

4) Worked as Senior Electrician inBismaillahTextil (pvt)ltd from 22/07/2003 to 25/11/2005.

EXPERIENCE SUMMARY

1)Maintenance and repairing of over head cranes.

2)Capability to make a new panel and according to machine etc, requirement.

3)Problem solving skill. Identify and weigh alternatives in problem solving and implement optional solutions.

4) Technical Supervision & auditing of maintenance contractors.

5)Follow & train people the day to day procedures & Safety talk of the company.

6)Maintenance of hydraulic system.

7) Provide expert advice on electrical systems.

8)Ensure all electricians and electrical contractors are competent and are working safely.

9)Prepare the Daily progress report.

10) Prepare E&I Commissioning Procedures.

11)Mechanical Completion, Pre-commissioning and commissioning activities.

12)Lighting & small power, Earthling and Lightning protection Hazardous area installations.

13)MCC, Control Panels & Distribution boards, Variable speed and DOL / assisted start drives / motor Installation.

14)Cable support systems installation.

15) Cable laying,Dressing,Glanding and termination as per client specification.

16)To carry out factory and site acceptance testing and commissioning.

17)Checking of all documentation produced by the project team, suppliers or sub-contractors.Planning and controlling work content of project.

18) Responsible for the initial startup by detailed study of the erection drawings (electrical and civil), installation of transformer and various parts of transformers like radiators, surge arrestor etc including oil filtering, dielectric strength checking( breakdown value of oil) and oil filling (vacuum and oil processing).

19) Carried out erection tests such as torque tests at connections (cable, bus bars), insulation resistance test, and winding resistance test, earthing resistance and Hi Pot test of HV and MV cables as well.

20) Carried out the testing of transformer which includes visual check for external damage, visual check for the bushings, cooling fans, radiators and mounting of various electrical devices.

21) Responsible for carrying out functional tests including the insulation resistance of control circuit with 500 V DC Megger, functional test of oil cooler pumps and fans, functional test of OLTC (tap changing and alarms), function checks of protective relays of transformer (alarm and trip) like bucholz relay, pressure relief devices, oil level indicator, oil temperature, winding temperature, OLTC oil level, OLTC pressure relief Valve.

22) Perform inspection activities and witness testing as required by applicable Inspection & Test Plans (ITPs). Participate in the surveillance/audit process to monitor construction & quality control.

23) Installation of Cable tray and ladder works according to the drawing and Power & control cable.

24) Coordinating with main contractors and vendors.

25)Coordinating with construction team to maintain the Quality of the work and issuance of RFI.

26) Monitoring the ongoing construction activities to ensure the Quality of the work.

27) Study of cable route drawings, cable pulling and termination.

28) Reconciliation of materials, preparation as built drawing.

29) Control and Protection Panels System House for Electric Panel Fire Fighting System.

30) Execution of electrical work as per daily and weekly schedule.

31) Responsible for manpower handling and arrangement.

32) Inspection of Cable Tray, Cable pit, Cable trench, Cable, MCC, Motor, Transformer, Battery Bank, Safety analysis of High Voltage test.

33) Preparation of test platforms, Test procedures and necessary documents.

team.

34) Review of supplier/sub-contractor information.

Execution of Solar Power project

35) Installation of Inverter transformer 6.25 MVA,RMU, Auxiliary Transformer.

36) Ups & SCVS panel,UPS panel,Auxiliary D.B,UPS DB, PLC panel,SMB receiver.

37) Installation of Battery Bank,lighting poles and weather monitoring system.

38) Installation of 33KV Main Incomer panel.

39) Installation of SMB of each Tracker.

40) Installation of Inverters 822 kw.

41) Installation of earthing pits.

42) Cable Glanding termination and dressing as per client specification.



Contact this candidate