Muhammad ZafarIqbal
E&I Engineer
GSM Oman: 009**-********
GSM Oman: 009**-********
GSM PAK: 0092-03016006641
Email: *************@*****.***
Email: ****************@*****.***
Personal Information
Name : Muhammad ZafarIqbal
Date of Birth : 21/01/1981
Nationality : Pakistani
Marital status : Married
Languages Known : English, Urdu,Punjabiand Arabic.
Oman Resident card : 70942044
Oman Driving License : 70942044
Majan Electricity License : 70942044
Gulf Experience : 17 Years
Pakistan id number : 33100-1001839-3
Profile
Highly professional and over 21 years of experience in Electrical Engineering and instrument Inspection works as per International standards and clients specifications.
Ability to learn quickly, follow the procedure exactly, solve problems independently and always willing to accept significant responsibility and involvement.
Educational Background
3Year Diploma in Electrical Engineering. 2001
Majan Electricity Company (SAOC). OMAN
Electrical Licence Holder of Majan Electricity Company.oman
Exposure to Codes
NATIONAL ELECTRICAL CODE (NEC) AND PETROLEUM DEVLPOMENT OMAN STANDARDS
WORK EXPERIENCE
(OVER 21 YEARS)
Experienced for all Engineering functions involving Electrical and Maintenance. Also well familiar with all QA/QC and Commissioning Procedures.
Work History IN OMAN
FROM 05-12-2005 TO 15-12-2006
COMPANY Abu Malak Al LawatiTrad and Cont.Co.L.L.C.
POSITION Electrical Supervisor
PROJECT Sohar Power and Desalination Water plant .
LOCATION Sohar, SULTANATE OF OMAN
FROM 20-12-2006 TO 17-04-2008
COMPANY ALNahdha United L.L.C
POSITION Electrical Supervisor
PROJECT Sohar Methanol Project.
LOCATION Sohar,SULTANATE OF OMAN
FROM 25-04-2008 TO 10-03-2009
COMPANY Daesun Electric And Communication& Co LLC
POSITION Electrical Supervisor
PROJECT Sohar Aromatic Project
LOCATION Sohar,SULTANATE OF OMAN
FROM 20-03-2009 TO 20-10-2010
COMPANY For Sight Drilling Company(FD-7)
POSITION Electrical & Maintenance Supervisor
PROJECT FD-7 RigFor Maintenance
LOCATION Larsen & Toubro Sohar Port
Sohar,SULTANATE OF OMAN
FROM 27-10-2010 TO 05-06-2013
COMPANY Alnahdha Overseas L.L.C
POSITION Electrical Engineer
PROJECT Sohar Fertilizer, Sohar Refinery petrochemical.
LOCATION Sohar Port
Sohar,SULTANATE OF OMAN
FROM 15-06-2013 TO 25-05-2015
COMPANY TMK Gulf international pipe industry LLC.
POSITION Electrical Supervisor
PROJECT Gulf international pipe industry LLC.
LOCATION Sohar industrial sniya.
Sohar,SULTANATE OF OMAN
FROM 07-06-2015 TO 30-01-2016
COMPANY Best Power Construction Company LLC.
POSITION Electrical Engineer
PROJECT Jindal shahdeed Rolling Mill.
LOCATION Sohar Port.
Sohar,SULTANATE OF OMAN
FROM 02-02-2016 TO 31-01-2017
COMPANY Daelim-Petrofac SRIP Joint Venture.(DAEMYUNG)
POSITION Electrical Supervisor
PROJECT Sohar Refinery Improvement Project.
LOCATION Sohar Port.
SULTANATE OF OMAN
FROM 05-02-2017 TO 30-12-2017
COMPANY Central Gulf Engineeringcompany
POSITION Electrical Supervisor
PROJECT Jindal shahdeed Rolling Mill.Steel Melting Shop.
LOCATION Sohar Port.
Sohar,SULTANATE OF OMAN
FROM 02-01-2018 TO 30-06-2018
COMPANY Bilad Oman Steel Factory.
POSITION Electrical Supervisor
PROJECT Bilad Oman Steel Factory
LOCATION Sohar Industrial State.
SULTANATE OF OMAN
FROM 01-07-2018 TO 22-08-2019
COMPANY China national chemical engineering third construction co.
POSITION Electrical QC Engineer
PROJECT Liwa plastic industries complex
LOCATION Sohar,SULTANATE OF OMAN
FROM 02-09-2019 TO 09-04-2020
COMPANY Binzagr Factory for insulation Materials company LLC.
POSITION Electrical Engineer
PROJECT Vale Oman Pelletizing Company LLC.
LOCATION Sohar,SULTANATE OF OMAN
FROM 03-05-2020 TO 30-12-2020
COMPANY Renewable Technical Contracting.
POSITION Electrical Engineer
PROJECT 25 Mega Watt Solar Power Project.
LOCATION Sohar,SULTANATE OF OMAN
FROM 02-01-2021 TO 30-05-2021
COMPANY Golden Sands Corporation L.L.C.
POSITION E&I Engineer
PROJECT Calcined Coke plant Shinvera Carbon.
LOCATION Sohar,SULTANATE OF OMAN
FROM 01-06-2021 TO 30-07-2021
COMPANY Contromet-inco at TRD
POSITION E&I Engineer
PROJECT Duqum Refinery EPC PKG-1
LOCATION Duqum,SULTANATE OF OMAN
FROM 01-08-2021 TO 24-03-2022
COMPANY Al salam International
POSITION E&I Engineer
PROJECT IbriSolorpv Independent power project
LOCATION IBRI,SULTANATE OF OMAN
FROM 30-03-2022 TO 31-12-2022
COMPANY INCO EngineeringManufacturing(Samsung & Petrofac)
POSITION E&I QC Engineer
PROJECT Duqum Refinery Project EPC2
LOCATION DUQUM,SULTANATE OF OMAN
FROM 04-01-2023 TO Till Date Working
COMPANY Gulf Al Malook Trad.& Cont.(REC)
POSITION E&I QC Engineer
PROJECT Bahwan & Veolia Sur Desalination Water Plant
LOCATION SUR,SULTANATE OF OMAN
Training Undergone
CompletedOrpic training courses, Safety induction, PTW training,LOTO
,Precommissioning and confined space safety training.
IT Skills
Application MS office(Word & Excel).
Operating system Windows 98-2000 & XP.
Work EXPERIENCE IN PAKISTAN
1) Worked as Developer and Maker of Electric Control panel in Madina Engineering Work from 09/01/2001 to 12/12/2001.
2) Worked as Trainee Electrician in Hussain Printing Faisalabad from 01/01/2002 to 30/06/2002.
3) Worked as Electrician in jeeaTextil (pvt)ltd from 04/07/2002 to 20/07/2003.
4) Worked as Senior Electrician inBismaillahTextil (pvt)ltd from 22/07/2003 to 25/11/2005.
EXPERIENCE SUMMARY
1)Maintenance and repairing of over head cranes.
2)Capability to make a new panel and according to machine etc, requirement.
3)Problem solving skill. Identify and weigh alternatives in problem solving and implement optional solutions.
4) Technical Supervision & auditing of maintenance contractors.
5)Follow & train people the day to day procedures & Safety talk of the company.
6)Maintenance of hydraulic system.
7) Provide expert advice on electrical systems.
8)Ensure all electricians and electrical contractors are competent and are working safely.
9)Prepare the Daily progress report.
10) Prepare E&I Commissioning Procedures.
11)Mechanical Completion, Pre-commissioning and commissioning activities.
12)Lighting & small power, Earthling and Lightning protection Hazardous area installations.
13)MCC, Control Panels & Distribution boards, Variable speed and DOL / assisted start drives / motor Installation.
14)Cable support systems installation.
15) Cable laying,Dressing,Glanding and termination as per client specification.
16)To carry out factory and site acceptance testing and commissioning.
17)Checking of all documentation produced by the project team, suppliers or sub-contractors.Planning and controlling work content of project.
18) Responsible for the initial startup by detailed study of the erection drawings (electrical and civil), installation of transformer and various parts of transformers like radiators, surge arrestor etc including oil filtering, dielectric strength checking( breakdown value of oil) and oil filling (vacuum and oil processing).
19) Carried out erection tests such as torque tests at connections (cable, bus bars), insulation resistance test, and winding resistance test, earthing resistance and Hi Pot test of HV and MV cables as well.
20) Carried out the testing of transformer which includes visual check for external damage, visual check for the bushings, cooling fans, radiators and mounting of various electrical devices.
21) Responsible for carrying out functional tests including the insulation resistance of control circuit with 500 V DC Megger, functional test of oil cooler pumps and fans, functional test of OLTC (tap changing and alarms), function checks of protective relays of transformer (alarm and trip) like bucholz relay, pressure relief devices, oil level indicator, oil temperature, winding temperature, OLTC oil level, OLTC pressure relief Valve.
22) Perform inspection activities and witness testing as required by applicable Inspection & Test Plans (ITPs). Participate in the surveillance/audit process to monitor construction & quality control.
23) Installation of Cable tray and ladder works according to the drawing and Power & control cable.
24) Coordinating with main contractors and vendors.
25)Coordinating with construction team to maintain the Quality of the work and issuance of RFI.
26) Monitoring the ongoing construction activities to ensure the Quality of the work.
27) Study of cable route drawings, cable pulling and termination.
28) Reconciliation of materials, preparation as built drawing.
29) Control and Protection Panels System House for Electric Panel Fire Fighting System.
30) Execution of electrical work as per daily and weekly schedule.
31) Responsible for manpower handling and arrangement.
32) Inspection of Cable Tray, Cable pit, Cable trench, Cable, MCC, Motor, Transformer, Battery Bank, Safety analysis of High Voltage test.
33) Preparation of test platforms, Test procedures and necessary documents.
team.
34) Review of supplier/sub-contractor information.
Execution of Solar Power project
35) Installation of Inverter transformer 6.25 MVA,RMU, Auxiliary Transformer.
36) Ups & SCVS panel,UPS panel,Auxiliary D.B,UPS DB, PLC panel,SMB receiver.
37) Installation of Battery Bank,lighting poles and weather monitoring system.
38) Installation of 33KV Main Incomer panel.
39) Installation of SMB of each Tracker.
40) Installation of Inverters 822 kw.
41) Installation of earthing pits.
42) Cable Glanding termination and dressing as per client specification.