Mohammad Shahid
CURRICULUM VITAE
C.A.T. Group: Curriculum Vitae 1
PERSONAL INFORMATION
Position: Project HSE Manager Mobile +966-**-***-**** Nationality Indian Email ady6rf@r.postjobfree.com
Languages English, Arabic Date of Birth 25-Feb-1982 EDUCATION
Degree University / Institute Grad Year
ISO 45001: 2018 Lead Auditor Ashbroke Quality Assurance 2019 NEBOSH IGC NIST 2012
OSHA 3 Fold Education Center 2010
Post Graduate Diploma in Industrial Safety MSPI 2006 BA (Hons) Geography Jamia Millia Islamia 2005
EXPERIENCE
Company BR. C.A.T International Limited, Saudi Arabia Position Project HSE Manager Year 2016-Now
Projects Saudi Aramco- Marjan Development Program Downstream Pipelines- Package 18 Jubail Area Pipeline
Saudi Aramco- Haradh Field Satellite Construction
Saudi Aramco- OMPP-SA 2 & 4 SAOUPD
Saudi Aramco- OMPP SA 1,2 & 4 GUPD
Air Products- Jubail Industrial Gas Network Pipeline
Organization of H.S.E. functions at a Project level.
Understand the H.S.E. requirements of the Project and Local laws and ensure they are complied with.
Institute proper investigation and reporting methods.
The planning of Inspection and monitoring activities.
Assignment of personnel and the initial review of reports and documentation.
Monitoring Project Health and Safety performance and reporting to Area Health and Safety Manager and coordinating with Project Manager.
Ensuring correct Document Control in accordance with OHS/P202.
Assisting in the formulation of project specific H.S.E. Plans.
Assist the Area H.S.E. Manager in the formulation and review of documents and procedures inclusive of Hazard Identification Plans, Emergency Response Plans, Work Instructions, and other documents that may be required to ensure a Safe and Healthy Work Environment.
Evaluate compliance levels and initiate Corrective and Preventive Actions to improve performance.
Report concerns and performance data to Area Health and Safety Manager and Project Manager
Recruitment campaign to interview HSE Personnel. Sr.
No.
Project Scope of Work
1. MARJAN
DEVELOPMEN
TPROGRAM
DOWNSTREA
MPIPELINES
The 300 MBCD Marjan Increment Program is an integrated development for oil, associated gas, gas cap and non-associated gas production. Marjan development program includes new offshore oil and gas facilities, onshore crude oil stabilization facilities (GOSP), a gas processing plant at Tanajib (TGP), Cogeneration facility, and Water desalination facility (all under other BI’s). BI-10-09004-018 will provide the downstream pipelines in support of the Mohammad Shahid
CURRICULUM VITAE
C.A.T. Group: Curriculum Vitae 2
PACKAGE #18
JUBAIL AREA
PIPELINE
Marjan Field Increment Program to maintain the Maximum Sustained Capability.
BI-10-09004 will provide a total of 11 new pipelines to transport AM, sour gas, sales gas, condensate, NGL and product from new facilities planned in Tanajib area or existing facility to various existing facility locations as well as end users. All new pipelines will be installed in the existing SJ-1/SK/KRT corridors or other exiting corridors except some short pipelines that will be connected to the new Tanajib Gas Plant, where there is no existing pipeline corridor. The project is utilizing the Saudi Aramco Capital Program Efficiencies Department, Capital Management System (CMS) methodology for project execution. 2. HARADH FIELD
SATELLITE
CONSTRUCTIO N
Construction of 15 gas well tie-ins, expansion of existing WAQR Gas Gathering Manifold, transmission line from WAQR GGM to HdGP Inlet Area, 5 new remote headers, upgrading of existing WAQR Remote Header, 5 new Operations Support Building (OSB), Overhead Distribution Power Lines, Cathodic Protection, 5 Communication Shelters, TETRA Radio Systems, Communication Cabling and Equipment, FOC line and OPGW, Surveillance
Camera and new SCADA System.
3. OMPP-SA 2 &
4SAOUPD
Installation of all phases of Oil well site, flow lines, trunk lines, laterals, headers, manifolds, transfer lines and any other pipelines with all associated facilities, such as instrumentation, communication, SCADA, fencing, site preparation, civil work, and buildings. Location is Southern Area Zone SA-2 and SA-4 which covers Harmaliyah, Haradh, Uthmaniyah & Hawiyah.
4. OMPP SA 1, 2, & 4
GUPD
Installation of all phases of Gas well site, flow lines, trunk lines, laterals, headers, manifolds, transfer lines and any other pipelines with all associated facilities, such as instrumentation, communication, SCADA, fencing, site preparation, civil work, and buildings. Location is Southern Area Zone SA-1, SA-2 and SA-4 which covers Aindar, Shedgum, Harmaliyah, Haradh, Uthmaniyah & Hawiyah. 5. JIGN (AIR
PRODUCT)
The pipeline scope will consist of three pipelines network that will be installed for H2, O2 and N2 to distribute the gases to customers via network that will be primarily laid on existing pipe racks owned by Royal Commission in Jubail area. • H2 pipeline will be 20” diameter running east/west with and 16” north/south branches • N2 pipeline will be 18” diameter running east/west with 16” north/ south lateral • O2 pipeline will be 12” diameter running east/west pipeline with 10” north/south lateral The new plant for Air Products (AP) is to be established in the Eastern Province of Saudi Arabia approximately 16 Km from Jubail City & 126 Km from Dhahran. The project will connect the proposed pipelines from AP plant to the different customers in Jubail industrial city-2 via existing RC corridor. The proposed H2, N2
& O2 pipelines will be laid in the RC corridor of Jubail industrial city-2 area and will follow existing pipe sleeper of RC corridor. The metering skids/stations will be located inside the customers connections (metering skids, not part of this work package scope) will be in Jubail.
Company Hammad Bin Khalid Contracting Company (Doha Qatar) Position HSE Manager Year 2014-2015
Projects Supreme Committee- Al Wakrah Stadium Enabling Work for 2022 FIFA World Cup (Qatar)
Assisting in the formulation of project specific H.S.E. Plans. Mohammad Shahid
CURRICULUM VITAE
C.A.T. Group: Curriculum Vitae 3
Assist the Area H.S.E. Manager in the formulation and review of documents and procedures inclusive of Hazard Identification Plans, Emergency Response Plans, Work Instructions and other documents that may be required to ensure a Safe and Healthy Work Environment.
Evaluate compliance levels and initiate Corrective and Preventive Actions to improve performance.
Report concerns and performance data to Area Health and Safety Manager and Project Manager
Preparation of KPI on weekly basis.
Company Kad Construction LLC (Fujairah), UAE
Position HSE Manager Year 2012-2014
Projects Transco- EPC Work for Water Supply System
Understand the H.S.E. requirements of the Project and Local laws and ensure they are complied with.
Institute proper investigation and reporting methods.
The planning of Inspection and monitoring activities.
Assignment of personnel and the initial review of reports and documentation.
Monitoring Project Health and Safety performance and reporting to Operation Manager.
Preparation of HSE Plan.
Conduct audits.
Joint site inspection from client.
Reporting of site incidents to client.
Company Sicon Oil and Gas SPA UAE (Member Company of CCC) UAE. Position HSE Engineer Year 2011-2012
Projects ADCO- Bu Hasa Shuaiba Water Enhancement Project
Identify and correct potential hazards by inspecting facilities, machinery, and safety equipment
Evaluate the effectiveness of various industrial control mechanisms
Ensure that Job site comply with health and safety regulations, especially after an inspection that required changes
Attend meeting with clients and company management.
Review employee safety programs and recommend improvements
Preparation of Risk assessment.
Preparation of JSA.
Company Consolidated Contractor International Company (CCC), Qatar Position HSE Engineer Year 2009-2011
Projects Qatar Petroleum- Ras Laffan Expansion of Port Project (Offshore)
Maintain and apply knowledge of current health and safety policies, regulations, and offshore processes
Review plans and specifications for new machinery and equipment to make sure that they meet safety requirements
Identify and correct potential hazards by inspecting facilities, machinery, and work site.
Evaluate the effectiveness of various operations control mechanisms Mohammad Shahid
CURRICULUM VITAE
C.A.T. Group: Curriculum Vitae 4
Ensure that buildings or products comply with health and safety regulations, especially after an inspection that required changes
Inspect the mooring dolphins and other safety devices.
Review employee safety programs and recommend improvements
Attend management meetings.
Company Consolidated Contractor International Company (CCC) UAE. Position HSE Engineer Year 2007-2009
Projects Eastern Gas Distribution System (EGDS) up grade (EPC) Project
Site Safety Inspections
Accident Investigations
Record Keeping
Conducting Emergency Response Drills
Ensure that the client’s protocols are followed
Ensure the job site should meet the clients as well as company requirements. Company Shade Corporation LTD.
Position Safety Officer Year 2006-2007
Projects Expansion of crude onshore production facilities.
Inspections of job site
Monitoring of job site
Hazardous gas testing at confine space.
Conduct JSA meetings
Conduct TBT
Report the issues and concerns to seniors.
Ensure that site is safe for work.
TRAININGS AND CERTIFICATES
Year Training Descriptions
BLS by Hammad Hospital, DOHA Qatar
Authorized Gas Tester Training, DOHA Qatar
Permit to Work, UAE
Firefighting training, UAE
Working at Height, Qatar Petroleum
Life Saving Emergency Response Training, RLIC Qatar Incident Reporting, DOHA Qatar
COMPUTER SKILLS
MS Office
MS Project
Outlook Express