Post Job Free

Resume

Sign in

Construction Manager/Site Incharge for Storage Tanks & Sphere & piping

Location:
Hooghly, West Bengal, India
Salary:
Negotiable
Posted:
August 23, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DETAILS

NAME

SEX

DATE OF BIRTH

PASSPORT DETAILS

MARITAL STATUS

LANGUAGES KNOWN

PRESENT POSITION

TECHNICAL QUALIFICATION

ACADEMIC QUALIFICATION

PRESENT SALARY

EXPECTED SALARY

NOTICE PERIOD

PINTU KUMAR DAS

MALE

10-02-1966

S 5369675 Valid up to 01-08-2028

MARRIED

BENGALI, HINDI, ENGLISH

ASSOCIATE MANAGER

GME from MS University (UGC) / DME from AICOMAS

Intermediate (W B S.E.)/Secondary (W B H.S.E.)

CTC.INR – +Trnasportation+Yearly Increment + Bonus NEGOTIABLE.

One Month

PERMANENT ADDRESS

SKYPE ID

EMAIL ID

SHRADHANJALI APARTMENT;FLAT # 401;N-79/6;

LAL BAHADUR SHASTRI ROAD; KONNAGAR;

P.S.-UTTARPARA;DIST.-HOOGHLY-712235; W.B.

+917*********

ady5a8@r.postjobfree.com / ady5a8@r.postjobfree.com/

ady5a8@r.postjobfree.com

COMMUNICATION ADDRESS

CONTACT NO.

SHRADHANJALI APARTMENT;FLAT # 401;N-79/6;

LAL BAHADUR SHASTRI ROAD; KONNAGAR;

P.S.-UTTARPARA;DIST.-HOOGHLY-712235; W.B.

+917*********

ady5a8@r.postjobfree.com / ady5a8@r.postjobfree.com/

ady5a8@r.postjobfree.com

PROFESSIONAL QUALIFICATION

DIPLOMA IN COMPUTER APPLICATION

ASNT LEVEL–II in RT

ASNT LEVEL-II in MPT

ASNT LEVEL - II in DPT

SPECIAL TRANNING

1. JHA – Job Hazards Assessment (PDO/OMAN)

2. HSE 14 – Health, Safety and Environmental Training (RIL/India) 3. PTW (Permit to Work Holder) - RIL/India & LNG /Qalhat at Sur ) 4. Fire Fighting Training (RIL/India)

5. H2 S (From PDO/OMAN)

6.HSE Leadership Training Course by M/s. RIL

7. WEB Base Training - U/G Piping; Tanks Fabrication etc. 8. Awarded “Certificate of Achievement” for 15 million safe man hours.

9. Awarded best Safety performer in March’2019. (RJIL) 10. First Aid Training from RIL(Jan.’20).

10.H2S, HSE, Confined Space, TW Certified from OQ (Oman) WORK EXPERIENCE 28 YEARS & ABOVE

SUMMERY OF WORK

EXPERIENCE

● More than 25 years worked in INDIA as a supervisor, mechanical engineer, and Construction Manager in various levels in the field of Petrochemicals, Oil Refineries & Terminals and Power Sectors in accordance with various aspects of mechanical fabrication and erection works including plant piping spools, Storage Tanks (Floating & Cone Roof, floating cum Cone Roof), Cryogenic Tank, Horton Sphere, Heater, Boilers, Columns and heavy/light structures, Maintenance and SHUT DOWN job etc.

● More than 38 Months worked in Middle East (GULF) as a Construction Manager, Site In charge, mechanical Engineer in Oil, Gas (Onshore) projects in accordance with various aspects of mechanical fabrication, erection, maintenance works of Storage Tanks (Double Wall), Dome Roof and Cone Roof Tanks etc. Pipe Racks, modification of Plant Piping, spools, Storage Tanks ● At present working as a Construction Manager for Fabrication, Erection &Commissioning of Dome & Cone Roof Storage Tanks. MAJOR ACTIVITIES ARE

● Fabrication, Erection, Hydrotesting & Commissioning of all type Of Vertical storage Tanks (Cone/Dome/Single & Double Deck Floating Roof Tanks.

• Fabrication, Erection, PWHT, Hydrotesting & pre commissioning Of Horton Sphere Tank.

Fabrication, Erection, Hydro testing, Commissioning and Reconciliation of U/G,A/G Piping.

• Blasting, Painting of Cs Plates, Structural Steels and Cs Piping Spools for Process, Unit and Fire Fighting Piping.

• Shutdown for Hook up of Process Pipeline with the new constructed process Pipeline & replacement of MOV.

• Maintenance of Process Piping and Replacement of Heavy Structure for Compressor Platform.

• Installation of vertical Turbine Pump, equipment, Tower etc.

• Execute the Civil, Electrical and Instrumentation work.

• Follow-up with the sub-vendors like design, fabrication, raw materials, NDT works etc.

• Manpower loading and planning in day to day activates.

• Sending technical quarries/clarifications to site/clients and attending weekly meetings with site staff and client.

• Shop job planning as per site/client requirements.

• Preparation of job wise material indents for purchase department.

• Day to day monitoring the stock of store materials and sending the stock statement to the Head Office.

• Estimation of fabrication jobs & execution as per budget and submitting the cost control sheet for each job completion.

• Preparation and submission of Work Method Statement, Inspection Test Plans, Production / Project planning schedule, Manpower, Equipment & Machinery deployment schedule etc

• Preparing the monthly actual bill of quantity ’s v/s order/drawing quantities the same should be certified with the client and billed.

• Organizing and mobilization / demobilization of work force, materials, equipment’s as per job requirements.

• Estimation of extra works apart from the main order

• Cost controlling with the tender estimation, weekly reviewing the man-hours any difference finds informing to management.

• Attendance Sub-Contractors Pre Bidding & TQ1, TQ2 meeting with HO Technical Management.

• Day to Day monitoring the HSE norms & TBT.

SR.

NO.

ORGANISATION WORK DETAIL AND RESPONSIBILITY

1.

M/s.Adani Enterprise Ltd.

(Ahmedabad)

( 31st Oct.’22 to Till Date)

● Consultant/ Associate Manager- Storage Tank/Horton Sphere for the project of 2 MMTPA Green PVC for the plant of Mundra petrochemical at Mundra. Involve with

Preparation the Methodology, construction schedule, review the contractors Tender Documents. Attended of the review meeting for constructability of the project & Contractor’s pre- biding documents under the OEPMC M/s. Thyssenkrupp Industrial Solutions (India) Pvt. Ltd.

2.

M/s. Anwesha Engineering

Co.L.L.C.

Sultanet of Oman

( 15th Sept’21 to 22nd june’22 )

● Overseeing and directing construction projects from conception to completion. Reviewing the project in-depth to schedule deliverables and estimate costs. Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations.

Execute of 03 nos. Dome Roof ( 45 mtrs. Dia x 16.630 Mts.height) & 02 nos. Cone Roof Storage Tanks (24.368 Mtrs.Dia x 16.368 Mtrs. Height) under the inspection of M/s.Exterran / GPS at Bisat-C Projects / OMAN

3.

M/s. Quality Fabrication &

Engineers Infrastructure pvt. Ltd.

( Mumbai, Maharasra)

(01st Jan’21 to 20th July’21)

● Construction Manager-Overall responsible for Fabrication

& Erection of UNIT & Process Piping, creating work schedule for site team & allocating responsibilities, Site visits & Meeting regularly with Clients, third parties & other Managers to report on progress. Execute of 4.7 Km. process pipeline on rack & 3.2 Km. process pipe line on underground trench area with the pipe supports & hookup with the Equipment/Machinery for BKT (Balkrishna

Industries Ltd.) Greenfield Projects under the Consultant of M/Jacobs Engineering India Pvt. Ltd. at

Aurangabad/maharastra.

04.

M/s. Reliance JIO Infocomm Ltd.

Jamnagar, Gujarat

(01st April’17 to 30th April’20)

M/s.Reliance Industries Ltd.

Jamnagar/Gujarat

(22nd Oct.’13 to 31st March’17)

● Manager-Construction-Role as a Mast Engineer for Execute of all type of Mobile Towers in various places of West Bengal. Looking after all the Civil work, Mechanical work including Electricals work and commissioning of entire project, follow up safety & Documentation, solve of Engineering & technically related problem. Certify of Contractors R.A. Bill.

● Engineer-Construction (Mech.)-Execute of 35 nos. Storage Tanks with two nos Cryogenic (Lin & Lox) storage Tanks & 09 nos. Horton Sphere, MVWS System, follow up Safety & Documentation, P&M, project materials, weekly meeting with contractor’s, Solve of Engineering &

Technically related problem, certify of contractor’s RA Bill for J3 Project at C2 Complex –C2 Utility; MEG; ASU Unit & Tank Farm at RIL at Jamnagar/Gujarat

05.

The Oman Construction Co. L.L.C.

- Oman

(18th April’13 to 03rd Aug’13)

● Mechanical Engineer- SHUT DOWN & Maintenance

activity of Process Pipe Line, Fabrication of Flare Stack structures & Modification of Spools as per site requirement in workshop, modification and replacement of Heavy structure of Platform for Qalhat Oman LNG project

(Process Train-I,II & III Area) at Sur/ Oman .

06.

M/s. Onshore Construction

Co.Pvt.Ltd.-

Mumbai

(11th July.’12 to 21st Nov.’12)

● Site In charge –Worked for 07 nos. Phosphoric Acid Storage Tanks including Fire Fighting system for the Project of Aqaba Phosphoric Storage Tank Farm ;

Jordan under the inspection of M/s.PDIL.

07.

M/s. IOT Anwesha Engineering &

Construction Co. – Baroda

(10th Feb.’10 to 17th May’12)

● Residential Construction Manager-Project for 05

nos.Double Deck Floating Roof (79.5 mtr.dia and

18.1mtr.height) & 03 nos.Fire Water Tank (32 mtr.dia & 16mtr.height),fabrication, erection, Testing and

commissioning of Process, Fire Water pipe line, including civil, electrical and Instrumentation work, attended in SHUT DOWN work for 7 nos.hoock up of process pipe line for M/s IOCL pipe line division Terminal Project at Vadinar

/Jamnagar/Gujarat

08.

AL-Hassan Engineering Co.

S.A.O.G. –Oman

(03rd July’08 to 25th Dec.’09)

● Site in charge – Fabrication, Erection, Blasting and Painting of CS and Fabrication of SS piping under M/s.GS Engineering for Salalah Methanol Project and Fabrication Erection Blasting and Painting for Double Wall Tank(Outer Tank dia 39 mtr.and Inner tank dia 36 mtr.) at NIMR-C; Full field Water Injection Project under the inspection of M/s.VELOSI for Petroleum Development of Oman

(PDO).

09.

M/s. Toyo engineering India Ltd.

-Mumbai

(03rd May’07 to 28th June’08)

● Sr. Mechanical Engineer - Execute the Fabrication & erection of Heater, Erection and alignment of Heavy & Light Equipment, fully involved with erection and welding of Horton Sphere of 15 m./ 13 m / 11 m Dia (product- Ethane, Butane and Propane), supervised of cryogenic pipe support installation for IOGR project/Dahej/Gujarat. Under Foster wheeler (PMC)

10.

Development Inspection Services

- Kolkata

(Deputed to M/s. Reliance

Engineers Associated Ltd.)

(25thAug.04 to 30th April’07 )

● Construction Engineer- For Piping Fabrication, Erection, Mechanical Clearance, Hydro-test, Material Reconciliation for Project-RRTF and MTF (HSD Pipeline) -RIL,

JAMNAGAR.

● Construction Engineer - Erection, Mechanical Clearance, Hydro-testing, and Reconciliation of Process & Unit Piping, Static, Rotary Equipment for Shut down & Maintenance for the Project-VMP Aromatics Train –III, for RIL, JAMNAGAR.

/INDIA

● Inspection Engineer- Prefabricated of Structural steel for Boiler, Pipe fittings, Gratings for STEWARDS & LLOYDS- KOLKATA.

● Sr. Construction Engineer -For Dismantling and Re- Erection of unit & process piping, Steam Tracing,

Mechanical Clearance,

Reinstatement, for Shut Down for VGO, CRUDE-361;

Plant for RIL/JAMNAGAR

11

Furnace Fabrica India Ltd.

-Mumbai

( 2nd July.2003 to 29thSept.2003)

● Site Engineer - Fabrication, Erection of Cone Roof Tank

(Dia 18, 20, 32 mtr.and height 12, 16 mtr.) For Project CARGIL (Vegetarian Refinery Oil Project), at PARADEEP / ORRISA. under the inspection of M/s. UHDE India Ltd. 11

.

Efficient Engineering Ltd.

- Mumbai

(2nd April 2003 to 28th June 2003)

● Mechanical Engineer –Worked for Dismantling

And Re erection of Unit Piping, Replacement of Internal Tray and Nozzles of Column for SHUT DOWN of

AROMATICS, UNIT /BPCL, MUMBAI.

12

.

SPS Engineering Ltd.-Mumbai

(2ndSept.2002 to 29thMar. 2003)

● Mechanical Engineer-For Maintenance and Replacement of Shell, Bottom, Roof plate and Nozzles of Floating Roof Tank (56 mtr.Dia), Floating cum Cone Roof Tank (36 mtr.dia) and Hydro test, Mechanical clearance,

commissioning and Reconciliation of materials for BPCL Project / MUMBAI /India

13

.

I.S.C.O. WLL., Abu-Dhabi

(UAE)

(1st May 2002 to 25thJuly 2002

● Mechanical Supervisor –Involved for Maintenance and Replacement of Shell, Roof, Bottom Plate and Nozzle for large dia Storage Tanks for UMMALNAR REFINERY- ABU DHABI; UAE

14

.

SPS Engineering Ltd-(Mumbai)

(2ndMar. 1994 –25thApril 2002)

● Mechanical Supervisor - Fabrication, Erection, Mechanical clearance, Hydro testing and Reconciliation of small and large Dia storage Tank (Cone Roof, Floating Roof, Floating cum Cone Roof of 18,22,30,40 mtr. dia and 12,16,18 mtr. height) including Cooling System, Heating Coil in Terminal Project.

● Installation of Vertical Turbine Pump with Piping; Fabrication, Erection, Mechanical Clearance and Hydro testing of Pipe line for Fire Fighting System at different sites under the inspection of M/s. Fitchner and M/s. EIL for the Project of GIPCL /BARODA; GCPTCL / DAHEJ –

GUJARAT; HPCL/ RAJAHMUNDRY- A.P.