MD SHAKIR HUSSAIN

Bachelor's in Electrical and Electronics Engineering (B.tech in EEE) 8+Years’

experience in EHV HV & MV Substation Construction & maintenance projects MOB/whatsaap:+966-*********(KSA)

To utilize my technical and supervising skills for achieving the target and developing the best performance in the organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the projects.

I had last worked New Makkah hosing 380/110/13.8KV Electrical Substation Project where I was working as Electrical site Engineer for National Grid Saudi Arabia located in Makkah Region. Currently I am working in zahran operation & maintenance for facility management projects in shumaisi Detention center project Makkah region. EXPERIENCE

ZAHRAN OPERATION & MAINTENANCE COMPANY at AL SHUMAISI JAIL PROJECT DEC 2022 – TILL NOW

ELECTRICAL ENGINEER

Worked as ELECTRICAL ENGINEER for operation of the RMU, installation, maintenance, of Projects located in Kingdomof Saudi Arabia company Al-Gihaz Contracting Company

Jan 2018 – Jan 2022 (4 yrs)

ELECTRICAL SITE ENGINEER

Worked as SITE ENGINEER for different 380KV & 110KV Substation Projects located in Kingdomof Saudi Arabia and PERMIT HOLDER of this same company L&T Limited

Aug 2016-Jan 2018 (2Yrs)

ELECTRICAL SITE ENGINEER

Worked as Electrical Site Engineer laying cable of 66 KV underground cable in Delhi metro Reliance Power

Aug 2009 to Jun 2011 (2Yrs)

ELECTRICAL SUPERVISIOR

Worked as Electrical site supervisor for6000 MW solar power plant Bachelor's in Electrical & Electronics ENGINEERING (B.tech in EEE) PASSED WITH 60% Jun. 2011- May 2016

UNIVERSITY

JAWAHAR LAL NEHRU TECHNICAL UNIVERSITY HYDERABAD (TELANGANA STATE) COLLEGE

ROYAL INSTITUTE OF TECHNOLOGY RANGA REDDY CHEVELLA (TELANGANA STATE) Intermediate (11th and 12th Std),BSEB Board Patna, India. July 2007 – Aug 2009

UNIVERSITY

MAGADH UNIVERSITY BIHAR

COLLEGE

KST COLLEGE BIHARSHARIF

EXPERIENCE, DUTIES, RESPONSIBILITIES & SKILLS

SUBSTATION AND RMU(RING MAIN UNIT)

* coordinate with GIS supervisor(ABB,HYUNDAI,HYOSUNG) for installation of Gas insulated switchgear

* installation of LCC panel

* coordinate with power transformer supervisor (ABB,HYUNDAI,HYOSUNG) for installation of HV & MV transformer

* installation of Auxiliary transformer

* installation battery bank/battery room, battery charger,DCDB and ACDB panel

* coordinate with switchgear supervisor for switchgear installation

* coordinate with testing engineer for rectification and modification control and protection panel

* Installation of cable rack way/Tray/cable support & cable ladder plan

* laying of Earthing, bus bar, earth pit formation

* Leads in cable pulling, termination of control system, GIS LCC panel, switchgear and outdoor control panels

* Installation of control and protection panels

2

* coordinate with the regional manager/project manager/site manager/QC engineer and lead electrical engineer with delivery of project requirements as they relate to scope, cost and schedule

* discussed with the respective person and prepare subject to the approval of the technical documentation required for the execution of the project, including layout drawings design criteria, standard detail drawings, construction and fabrication drawings, equipment lists,

* Manage and coordinate with the lead/senior electrical engineers the progress of the Engineering work in accordance with the project scope, schedule and procedures

* Review soft drawing to ensure conformity with engineering designs.

* Monitor the fabrication and construction works to ensure that it is executed in accordance with the engineering designs.

* preparing work progress report such as daily progress report, weekly progress report and monthly progress report

* I was permit holder

* Coordinate with store department

* Installation of RMU

* RMU maintenance

* Replace RMU

* RMU Operation

* insulation testing by meggar

* Installation of lightning arrester

* Operation of Switchgear panel in substation

* ATS installation

* Generator maintenance

* Motor Maintenance

ACTIVITY

MAJOR PROJECT

1. Construction of NEW MKH 380/110/13.8KV BSP substation – Total cost SR 323Million. Contract no: 440*******

(Working from Dec 2020 to Dec 2022)

2. Construction of Al-Bayah110/13.8KV Substation. Contract no: 440******* (Worked from Jan2019 to Dec2020)

3. Construction of 110/13.8KV KAAU 4 SS & Reinforcement of 110/13.8KV MKH 3 SS in Jeddah. Contract no: 1436/435/106 (Worked from Jan2018 to Jan2019) Operation, installation and maintenance of RMU replace of Energy meter in Jeddah and Makkah 1.Cable laying of 66KV underground high voltage distribution system Electrical Equipment installation in Delhi metro Rail(DMRC) corporation project 2.6000MW solar power plant project in Rajasthan

MS Word

MS Excel

Teamwork

Adaptability

Flexibility

3

Father Name : Md Reyaz Ansari

Date of Birth : 15.01.1990

Passport No : N8614647

Date of Issue : 24.02.2016

Date of Expiry : 23.02.2026

Nationality : INDIAN

Marital Status : Unmarried

Language Known: Hindi & English

4

CamScanner



Contact this candidate