TINA DELOREY
Minden, Nevada **423
775-***-**** (cell)
********@*****.***
Professional Summary
Thirty-three years multifamily/federal/state/commercial/residential construction experience as a Project Manager, Superintendent, Quality Controls Manager, Construction Accountant, Pre-Construction, Project Engineer, and Construction Procurement, representing owner, general contractor, and subcontractor. Strengths include managing several projects simultaneously; working under pressure; meeting project goals, schedules, and budgets. Coordinate projects in excess of $450 million.
Accomplishments
Review, negotiate, award, and monitor bids, contracts, change orders, purchase orders, submittals, and pay applications for all work phases, between owner, architect/engineer, subcontractor, and supplier.
Ensure design compliance by monitoring plan specifications, building codes, utilities, exterior, and interior drawing specifications. Implement corrective action when needed.
Provide detailed project schedules and coordinate installation of materials.
Resolve and mediate conflicts on contractual matters, project design, site meetings, closeout items, and pay applications for all phases of construction and design.
Supervise in excess of 65 field personnel on 3 to 4 projects simultaneously.
Completed all projects within the contractual time restraints.
Estimate and prepare public works and commercial bids for new and existing projects. Compile bid documentation, solicit, and analyze outside bids for all design disciplines. Review bids for completeness of work scope.
Observe and monitor construction operations and equipment to ensure conformance to the plans and specifications.
Inspection of work for conformance to project plans and specifications.
Identify issues arising during construction and verifying that deficiencies have been corrected.
Inspection of incoming materials for compliance with both the specifications and purchase orders.
Federal projects with budget ranging from $150,000-$13,500,000
VA Sierra Nevada Health Care System, Reno, NV
Electronic Health Record Modernization Upgrade project – Complete Campus
Four Story Concrete Parking Garage - 348 Spaces. Ground Up New Construction
Office of Information and Technology Remodel – New Build IT Computer Space
Diagnostic, Imaging, Cardiology & Endoscopy Services Remodel – Hospital Remodel 3rd and 2nd floor.
NV Energy Pole Relocation
Specialty Clinic Bridge – Corridor Bridge between two existing buildings, tie in at the second floor.
Generator Stack Relocation – 145 Vertical Feet of Generator Exhaust Piping. New Pad for Generator.
Site Prep Spec CT – Remodel of Procedure Rooms for New CT Scan Machine
Load Share North – Installation of two new CMU Buildings, which housed a new Generators and Switchgear.
Building 7 Renovation – Gut existing building and re-build new Maintenance Shop and Storage.
Med Gas – Install Medical Gas to Specialty Clinic from Building 1.
Public Works projects with budgets ranging from $150,000 - $850,000.
China Spring Youth Camp Gymnasium, Gardnerville, NV
8520 SF., 2 story regulation basketball Court, showers, and weight room.
Whittell High School Library Addition, Zephyr Cove NV
7124 SF., Single story.
Tahoe Service Center, Juvenile Detention Facility, Stateline, NV
4500 SF., Lock down cells, recreation, and observation rooms.
Pyramid Lake Scenic Byways Visitors Center, Nixon, NV
Interior finish placement and exterior repair of stone historical building.
Truckee Airport Terminal Remodel, Truckee, CA
Full terminal remodel, kitchen, bath, meeting, storage, and waiting rooms.
University of California Berkeley Doe/Moffit Library, Berkeley, CA
Conversion of Two Libraries.
University of California Berkeley Computer Science Building, Berkeley, CA
9 Floors - Studies of Computer Science Building.
Residential/Multifamily projects with budget ranging to $20,000,000 - $450,000,000.
Double R Living, Reno, NV.
9 Individual, 24 unit, three story buildings, 2 individual, 112 units, 4 story buildings, total unit 440. 2 Story Clubhouse. 5 individual detached Garages.
Atrium, Sparks, NV.
6 story (4 floors of living space sitting above 2 floors of parking) 209 Unit (605 to 1100 SF) living area, open courtyard, club house, exercise room, and exterior party deck. Panelized shearwall system.
Willow Creek Senior Living Community, Idaho Falls, ID
180,410 SF., 178 unit senior living facility, theater, dinning, exercise rooms, and nursing facilities.
12 separate town homes, 1400 sq. ft. two bedroom, two bath.
Summit Senior Living Community of Billings, Billings, MT
81,900 SF., 180 unit senior living facility, theater, dinning, exercise rooms, and nursing facilities.
16 separate town homes, 1400 sq. ft. two bedroom, two bath.
Thomas Berkley Square Housing, Oakland, CA
115,000 SF., 91-unit multi-family housing with retail shells.
Commercial projects with budget ranging from $200,000- $107,000,000.
Harrahs Hotel Casino, Lake Tahoe, NV
52,720 SF. Main Casino Renovation
17,013 SF. Convention Center Renovation
5,615 SF. Summit Restaurant, a 5 Star Dining Experience
504 SF. Hotel Room Renovation – 76 each first phase
Harvey’s Resort and Casino, Lake Tahoe, NV
51,042 SF. Main Casino Renovation
16,710 SF. Pacifica Buffet, 515 seat seafood buffet
2,495 SF. Cabo Wabo Night Club/Restaurant
144 Hotel Room Renovation/8 Luxury Suites/4 Corridors
187 Hotel Room Renovation/10 Suites/8 Corridors
Harrahs Hotel Casino, Reno, NV
16,000 SF., Sapphire, Night Club
404 Hotel Room Renovation/24 Corridors
Main Casino Renovation
EK/HK Suite
Luxury High End Suites
Hard Rock Casino, Las Vegas, NV
351 room Hotel/Casino/Restaurants/Show Room/Convention Center.
Harvey’s Kanesville Queen, Missouri River, IA
1800 period piece, 1200 gaming positions, third decks with eating facilities.
Harvey’s Hotel/Convention Center, IA
251-room hotel/18,000 SF. convention center/retail and dining space.
Employment History
Neeser Construction – Project Manager 2022 – 2023 Laid Off
Talion Construction – Superintendent 2021 - 2022
Silverwing Development – Project Superintendent 2020- 2021 Laid Off
Winspear Construction – Project Manager/QC Manager 2019 – 2020 Project complete.
Patriot Construction – Project Manager/QC Manager 2013 – 2019 Project complete.
Praxis Associates – Cost Accountant 2011 – 2013 Project complete.
Portrait Homes Inc. – Project Manager 2008- 2009 – Laid Off
Mountain West Community Construction – Project Manager 2006- 2008 – 100% Travel
UPA California - Project Manager 2005- 2006 - Laid Off
Harrah's Entertainment, Inc. – Project Manager 2001- 2005 – 100% Travel
Education/Certifications
USACE/NAVFAC CERTIFIED – #SPK-USACE-02-22-00037- Construction Quality Management for Contractors
Associate of Applied Science: Western Nevada College,
Major: Construction Project Management
Nevada Contractor License: Qualified Employee E-2 Owner Exceeding 3 Stories.
Current OSHA 30
Software
Procore, Bluebeam, Microsoft Outlook, Excel, Word, Adobe, Foxit, Microsoft Projects, Suretrac, Masterbuilder, Timberline, Newforma, P6.