Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Municipio Maturin, Monagas, 62, Venezuela
Salary:
to agree
Posted:
August 21, 2023

Contact this candidate

Resume:

JOSE LOPEZ

Phone: +******-***.**.**

Email: ady3hg@r.postjobfree.com

Linkedin:www.linkedin.com/in/jose-lopez-323b5970

SUMMARY

Bachelor’s degree in Electrical Engineering and a Diploma in Electrical Power Systems with over 23 years of experience in Engineering, Construction, Commissioning, and Start-Up Projects. Demonstrated achievement and working experience with several Engineering and Construction Companies in the electrical Construction sector with excellent results. Highly experienced in design, review, construction supervision & inspection, pre-commissioning, commissioning, and Start-up of electrical oil and gas projects.

PROFESSIONAL EXPERIENCE

●Electrical Project Manager, PDVSA Exploration & Production (Oil & Gas Company). 2018 - 2023. Project: 115/13.8 kV EPC Electrical Substations under IEC 61850 Standard with the GE Multilin HardFiber System, six bays, four power Transformers 65 MVA. Activities: Construction overseeing of the project, Reviewed and approved Detailed Engineering Design. Monitored the project to ensure that the work scope, schedule, costs, and standards are meeting project requirements. Managed staff and assigned engineering and technical personnel tasks, overseeing the efficient running of projects, including providing supervision and guidance to other engineers. Coordinated with other disciplines both internally and externally. Prepared equipment, materials, construction specifications, and scope documents for EPC tenders and contract documents. Held weekly meetings with subcontractors to check advanced and resolve construction problems. Designed, reviewed and approved the engineering of 13,8 kV electrical Overhead distribution lines

●Project Engineer, PDVSA Exploration & Production (Oil & Gas Company). 2017-2018. Project: Gas Lift Injection Plant El Furrial. Venezuela. Activities: Reviewed everything about electrical Detailed Engineering Design, providing technical guidance to others regarding projects. Monitored the project to ensure that the work scope is according to the drawings. Developed a motor acceleration study to validate the start of a 250 HP pump from an electrical generator. Participated in the commissioning test of MCC and the plants’ electrical systems.

●Commissioning Leader, PDVSA Engineering & Construction (Oil & Gas Company). 2016-2017. Project: EPC of Facilities for Extra-Heavy Crude Oil Production increased from 105 MDB to 165 MDB within Sinovensa Petroleum Facilities in Mixture Plant Jose (PMJ), Morichal, and Block MPE-3. Activities: Participated in preparing phase to development schedule and division of systems using a systemization approach for the commissioning of the EPC project. Followed up to document preparation and commissioning and operating procedure.

●Engineering Manager, PDVSA Engineering & Construction (Oil & Gas Company). 2014-2016. Project: EPC of Facilities for Extra-Heavy Crude Oil Production increased from 105 MDB to 165 MDB within Sinovensa Petroleum Facilities in PMJ, Morichal, and Block MPE-3. Activities: Planned, coordinated, reviewed, and approved everything about the Detailed Engineering Design of the project. Monitored the project to ensure that the work scope, schedule, and standards are meeting project requirements. Reviewed and approved documents, drawings, technical bid evaluations, material requisition, scope change control, manufacture approval engineering, field engineering to support construction work, design change notification, kick-off meeting with Contractors, day to day with the Chinese Team to complete EPC on time. Participated in constructability analysis, Hazop Study, and Lessons Learned.

●Electrical Construction Project Leader, PDVSA Engineering & Construction (Oil & Gas Company). 2012-2014. Project: Level Monitoring Lake Los Tacarigua. Activities: Construction overseeing, Generated documents, calculations, and drawings Detailed Engineering Design for improvement of two existing pump stations, including electrical substation and OHL. Construction Inspection. Coordination study and relay parameterization were carried out to allow the start of a fifth pump.

●Construction Manager, PDVSA GAS (Oil & Gas Company). 2010-2012. Project: Electric infrastructure - Soto Project (EPC). Activities: Oversaw the Construction of a 44 km long 69 kV Transmission overhead line and 69/13.8 kV electrical Mobil Substation. Planned, coordinated, reviewed, and approved everything about the Construction of the project. Developed project execution plans, kick-off meetings, contract reviews, and scope reviews of the project. Overseeing the quality control Plan.

●Electrical & Instrument Leader, PDVSA GAS (Oil & Gas Company). 2008-2010. Project: Anaco Gas Project. Operation Center San Joaquin. Activities: Coordinated all electrical and instrumentation pre-commissioning and commissioning activities of the project. Oversaw the construction was carried out by the provisions of the construction plans within the planned and complying with time and the guidelines of quality. Oversaw the installation, wiring, connection and testing of electrical equipment and process instrumentation.

●Engineering and Construction Project Leader, PDVSA GAS. 2007-2008. Project: Distributed Power Generation System Aragua de Barcelona. Activities: Coordinated a multidisciplinary team for Basic- Detail Engineering and subsequent implementation of a module 10 Groups Generators with Spanish technology company Guascor with a nominal power of 775 KW each. Developed cable sizing, duct bank design, load study, medium voltage power line design, grounding design for installation of 10 sets of power generators, 10 transformers 13.8/0.48 kV, a switchgear and control room.

●Construction Inspector, PDVSA GAS. 2006-2007 Projects: "Adaptation Production Facilities at Aguasay Camp: Replacing Gas Engine for Power" and Project: "EPC Relief and Venting System Compressor Plant Santa Rosa II". Activities: Coordinated all construction supervision activities to change five Gas Engine oil pumping to electrical motors and for installation and commissioning of Santa Rosa II compressor plant’s Flare.

●Electrical Project Engineer, PDVSA GAS. 2005-2006. Project: "EPC for Reactivation of Compressors in Traditional Areas – RECAT Project''. Activities: Reviewed and approved Detailed Engineering Design, Document review of technical specification, data sheets, calculations, BOM, grounding drawings, lighting design, duct bank, hazardous area, cable and transformer sizing, schematics, power system studies, and Construct inspection.

●Project Engineer, PDVSA GAS. 2004-2005. Several Projects at Pdvsa Gas. Activities: Generated documents and drawings of the Conceptual Engineering Design, general documents, Cathodic Protection, Designs Bases and Criteria, Evaluation of options, One Line Diagrams, location of equipment, etc.

●Operations Manager, CYMAG, C.A. (Contractor), 2002 – 2003. Project: Basic Services in Ciudad Bolivar and Puerto Ordaz Plants for PDVSA, SA. Activities: Managed and Technical Supervision of the Work. Maintenance of Electrical Installations, duct bank, wiring, grounding, Coordination, and Supervision of Personnel.

●Construction Manager, E.L.P. Ingeniería, C.A. (Contractor). 1997 – 2002. Project: Development of several electrical construction contracts for the State Utility Company. Activities: Oversaw the Construction of several Overhead distribution electrical lines 34,5 and 13.8 kV, Construction of Electrical substations 34,5/13,8 kV, major maintenance of electrical distribution feeder, and change of distribution transformer capacity.

●Electrical Supervisor, Construcciones de Ingeniería, Mecánica y Civil, C.A (IMC). 1996 -1997. Project: Construction of Power Lines, Flow, and diluents Appraisal Wells. Activities: Oversaw 34,5 kV OHL construction supervision, 34.5 - 0.480 kV electric substation construction supervision. Preparation of Technical Report.

●Electrical Engineer, Eleoriente (Public Utility Company). 1995 – 1996. Activities: Developed Electrical inspections to test (FAT) all electrical equipment (Transformer, Circuit Breaker, Switch, insulator, etc.) procured.

INSTRUCTION SUMMARY

Diplomado on Electrical Power Systems, Universidad de Oriente, Venezuela. 2014

Electrical Engineer, Universidad de Oriente, Venezuela .1994

TRAINING COURSES

-Autocad 2D, 24 hrs., 2022

-Management Indicator, 24 Hrs, 2017

-English Basic Grammar, 96 Hrs, 2015

-Cathodic Protection Design,32 Hrs,2013

-Electric Power Systems Protection, 2013

-ETAP Software, 32 Hrs, 2013

SKILLS

●Skill in electrical construction work, construction supervision, electrical distribution design, construction inspection, commissioning approach, physic, and financial control work, FAT, SAT

●Skills in design in electrical power systems, Electrical Analysis like Short circuits, Load Flow, Motor Accelerations, Lighting design, Cathodic Protection Design, canalizations design, schematics, transformer, and cable sizing, and equipment selection.

●Software: Etap, Dialux, Luxicon, MS Office, Autocad 2D, MS Project.

●Languages: English, Spanish (Native)

●Procurement Skill: Elaboration of purchase orders and equipment and material reception and FAT.



Contact this candidate