Summary: 46 years of analytically based, ground-up construction experience including the scheduling and coordination of subcontractors in all phases of commercial and industrial construction.

Integrity is non-negotiable, the hallmark of ethical leadership. ASHE

OSHA 30

August 26, 2016 to Present MW Morrissey.

Superintendent

• Super Star Car Wash, Tucson, AZ, ground up

• Eegees Ajo ground up

• Jack in the Box, Benson ground up

• Marana Court House 1,000 sq. ft. ground up jury room

• Jack in the Box, Tucson, AZ ground up

• TMC One 3200 ft TI high end, Tucson, AZ

• E 2 Shops, Tucson Marketplace, 5,000 sq. ft. ground up shell building

• Brake Max, Marketplace, 3,500 sq. ft. ground up

• Big O Tires Old Vail Plaza ground up 6,000 sq. ft. Vail, AZ

• Arby's Old Vail Plaza ground up 2,300 sq. ft. Vail, AZ

• Old Vail Plaza Phase 1b 9-acre civil site work, dry utilities, light poles, and paving for 10 future pads, Vail, AZ

• Rancho Rustico Mexican Restaurant ground up 3,500 sq. ft., Vail, AZ

• Old Vail Plaza Shell group up 7,200 sq. ft. Shell building including 2 small tenant improvements Old Vail, AZ

• Tucson Medical Center Cancer Imaging 800 sq. ft. tenant improvement Tucson, AZ

Jan 2013 - Aug 2016 BFL Construction.

Superintendent

• CODAC Coming home #2. 1,300 sq. ft. renovation, small demo and room addition. Tucson, AZ

• Ventana Medical Systems building 8-9 Modulars 7 acre site, utility tie- ins, pad prep for two 30,000 sq. ft. modular buildings and site work for paved fire lane and parking. Oro Valley, AZ

• Surf thru carwash, Pantano Rd. 2 acre site, ground up 6,000 sq. ft. building with a 7,000 sq. ft. solar canopy, all site work and utilities. Tucson, AZ

• UMC nuclear medicine lab, remodel for added PET/CT scanner. Separation walls relocate med gas and power feeds. Tucson, AZ

• Surf thru carwash, River Rd. 2-acre site ground up 6,000 sq. ft. building with a 7,000 sq. ft. solar canopy all site work and utilities. Tucson, AZ

• UAHM Elvira offices. Complete high end renovation and expansion 36,000 sq. ft. including a 9,000 sq. ft. mezzanine and elevator. Tucson, AZ Feb 2012 - Nov 2012 Epstein Construction Tucson, AZ Superintendent

• Two 15,000 sq. ft. Tenant Improvements for Chuze Fitness Feb-2011 - Dec-2011 Eagle Rock Excavating Tucson, AZ Foreman

• University of Arizona stadium north extension

• Walmart 36th Park underground utilities

October 2000-June 2011 Canyon Building & Design Tucson, AZ Superintendent

• Mission Heights Preparatory HS Casa Grande 30,000 sq. ft. Ground up including all utilities and site work.

Road widening and City turn lanes at adjacent intersection

• St. Augustine ground up multipurpose building 30,000 sq. ft. metal building and facilities building, upgrade of existing alarm systems, extend all utilities to building, site work.

• Chapman Honda Tenant Improvement upgrade 1,200 sq. ft. customer lounge, restrooms, and front office space.

• Tucson Dodge Dealership Ground up complete 9 acre site demo 60,000 sq. ft. metal building and showroom.

• Shell building at Randolph 12,000 sq. ft. stand alone, site work and utility tie- ins.

• Reid Park Zoo entrance ticket booths, massive 80 x 80’ shade canopy, site work, utilities and gift shop.

• David’s Bridal 20,000 sq. ft. shell building including site work detention basin and future pad prep.

• El Con Mall, Ross Dress for Less 30,000 sq. ft. demo of existing structure and build new shell building.

• El Con Mall: Office Depot 20,000 sq. ft. shell building

• El Con Mall: 18-acre site redevelopment including demo on all existing parking and rebuild to new COT spec, site lighting, drainage and 10’ perimeter wall including all infrastructure and pad prep along Broadway. Sept 1989 – June 2000 Miller and Associates, General Contractors Rillito, AZ Superintendent

• Silverbell Golf Course, new lift station for treated water irrigation system, tie- ins to pond and existing underground piping, Tucson, AZ.

• Fountain Hills Lift station #7. Complete mechanical tie-ins, dual 8" Gorman- Rupp vertical turbine pumps-chlorine systems and control building. Fountain Hills, AZ

• 3M Magnetic Tape plant. Fire pump station and chemical treatment plant with barrel storage facility, loading docks, etc. Tie-ins to domestic water, fire systems and FRP chemical feeds. All piping, Tucson, AZ.

• Mesa-Falcon Field Well #2. 80k gallon, four vertical tank Granular Activated Carbon System including demo and refitting of existing well systems, all piping ductile-CPVC’s and processed piping, chlorine-caustic systems complete. Superfund project, Mesa, AZ.

• Davis Monthan/AMARC wash racks. Tie-in and install a 300’ utility trench with pits for service equipment to mothball military aircraft, Tucson, AZ.

• F3 Booster Station. Complete rebuild of existing well site. Fabrications including processed pipe, storage tank, pumps and hydro chlorine injection systems. Three Points, AZ

• Two CAP pressure regulating valve stations. Earth work installations and tie- ins, domestic, ” - 66” AMRON-processed piping, control buildings for electrical and chlorine injection systems, Tucson, AZ.

• Installed hatches and catwalks at 6 COT reservoirs for chemical and water quality testing at various points, Tucson vicinity

• NCO Academy, Ft. Huachuca: 37,000 sq. ft. single level building, CORE spec. ground up.

• Kolb Road. Foreman of piping crew, 4k sq. ft. metering vault and pipe from ” to 54” layout excavation, placement and tie-ins, Tucson, AZ

• NCO Barracks demo. Demo 8 existing buildings, Ft. Huachuca, AZ

• Amphitheater High School Library, 18,000 sq. ft. single level building including site work and existing building demo, Tucson, AZ

• Paseo Tamayo Reservoir. Dual 4 million gallon cast in place concrete tank structures including all piping 1”-30” C.M.P. Ductile iron PVC etc. excavations and layout, Tucson, AZ

• Plant 9 Booster Station complete upgrade including 2-2000 GPM diesel powered vertical turbine water pumps-all piping, concrete, layout and excavations, Avra Valley, AZ.

• Oracle State Park dirt-work and crews on new Park ADOT spec grading- asphalt 2 miles new road including box culverts C.M.P erosion control curbing and new water, gas and telephone service, Oracle, AZ.

• Picacho Peak Wastewater Treatment Plant. R.V. dump station, 2700 L.F. 6” sewer, 4 manholes and Schreiber modular sewer plant-small cast in place concrete structure, irrigation system, Picacho Peak, AZ

• CORE Spec Diversion Channel, supervised construction, architectural concrete, earthwork and paving crews *

• CORE Spec Rillito River Phase III pedestrian bridges and bike paths. Supervise construction arch concrete and earth work labor crews September 1988 – September 1989 Flintcrete, Inc. Subcontractors Tucson, AZ Superintendent

• Orange Grove Jr. High concrete foundations slab on grade, retainer walls and structural steel reinforcement.

• Pre-cast concrete tilt walls, racquetball courts.

• Amphitheater High School gymnasium. All site and structural concrete including site work. 35,000 sq. ft.

• Hughes Aircraft. Four cast in place lift stations, piping support bollards for 6" FRP above ground chemical feed piping.

September 1986 – August 1988 Colasanti North Carolina, Div. Colasanti Corp, Detroit, MI

Superintendent

• Fair Oaks Commerce Center multi-level concrete parking and office structure. Involved in quality control quantities, coordination and scheduling of finish and general labor crews, Fairfax VA

• Rivas Warehouse 35,000 sq. ft. tilt up precast concrete building. Nogales, AZ

• Carondelet Care Center, Ground up 15,000 sq. ft. St Marys. Tucson, AZ

• Garrett AiResearch Chemical Treatment Plant, Government standard cast in place epoxy lined containment structure, Oro Valley, AZ November 1977 - August 1986 Lawrence Hickey and Sons Superintendent/foreman/carpenter

• Ground up office space, strip malls, apartments, tilt warehouses, resorts La Paloma, Starr Pass, El Conquistador, etc.



Contact this candidate