BRAD WHITE

P.O. BOX ***, SAN GREGORIO, CALIFORNIA 94074 CELL: 650-***-**** E-MAIL:

ady0i2@r.postjobfree.com

PROJECT SUPERINTENDENT

PROFILE

• Broad-based experience within the Construction Industry from initial site survey to project completion.

• Projects include apartments, offices, parking structures, motels, residential estates

• Proficiency in planning / scheduling, subcontractor supervision, negotiations, and problem resolution. • Bottom-line oriented - manages and directs multi-million dollar projects on time and within budget. • Solid communication and interpersonal skills to effectively negotiate and interact with individuals on all levels. AREAS OF STRENGTH

• Direct all project functions: field operations from initial conception to final close out.

• Coordinate daily operations; supervise field operations; review construction documents, change orders, build and maintain schedule.

• Interact with owners, design professionals, building officials, and clients to implement building modifications and ensure that the project s schedule and financial goals are achieved.

• Ensure all warranty work and punch list items are completed.

• Maintain project safety program.

Clarum Byldan Corp

PROFESSIONAL EXPERIENCE /

ACCOMPLISHMENTS

Superintendent 2-10 -20 – 11-16-21

Jefferson Street Condos

Davis Reed Inc.

Superintendent 9/2/19 – 2-20-2020

$50 Million Hotel

Palisade Builders Inc.

Superintendent 11/1/18 - 6/17/19

$150 Million 355 unit apartment w/ mixed use

Barry Swenson San Jose, Ca

Superintendent (5/1/17-8/2/18 )

$21 Million 114 Uuit Butterfield Senior Housing

$65 Million Ohlone Block C 268 Unit Apartment

$125 Million 19 Story Student Housing

Nexgen Builders Inc. E. Palo Alto, Ca Superintendent (5/11/05 – 5/1/17)

$8 Million 24 Unit Condo/ Mixed Use,

Provide site supervision residential condominiums over retail Provide site supervision 30 unit condominiums Crossman Place 30 unit condominium Trinity Park 42 Single Family Home Sterling Park 96 unit SFD / Condo Station 361 26 unit SFD / Townhouse Monore 30 unit SFD Edgewood Plaza 10 unit SFD Villas at Flolrio 22 unit Townhouse WE O’Neil Construction Walnut Creek, Ca

Superintendent (3/22/04 – 5/15/05)

Project: $22 Million Mission Gateway

Provide site supervision of 121 Apartments - Union City, Ca 2005 Turner Built Inc. _ Half Moon Bay, Ca

Superintendent (3/1/03 – 3/10/04) 2004 Project: $1.5 Million Cunha’s Grocery- HMB, Ca Provide site supervision of 12,000 sq. ft. fast track, design build core and shell grocery store Tim Barrett Construction – Loma Mar, Ca.

Superintendent / Carpenter (9/1/02- 5/1/03) 2003 Residential Remodels Bovis Lend Lease – San Francisco, Ca. 2002 Superintendent (12-3-01 – 8-27-02) Project: $700 Million Santana Row – San Jose, Ca

Provide site supervision of Building #4, 250,000 sq. ft. fast track retail / residential with underground parking Gary Staff Construction – Woodside, Ca. 2001 Superintendent (5/01-9/01) 2001 Project: $1 Million Proulx and Holloway estates

Provide site supervision of tennis court, cabanas, trellis, road barricade, and bridge construction. Cannon Constructors- San Francisco, Ca. 2000-2001 Superintendent Project: $21 Million The Baker Hamilton Building

Provided site supervision of a fast track 275,000 sq. ft. core and shell, seismic, historical renovation, including shotCrete walls, brace frames, roof top mechanical, elevator / stair, bathroom lobbies. Obtained occupancy in 11 months from start date, on schedule.

Bovis Construction Corporation - San Francisco, Ca. 1998-1999 Superintendent (1/99-6/99) Project Superintendent (5/98-1/99)

Project: $83 Million The Metreon - San Francisco, Ca. Provided site supervision for a 485,000 sq. ft., state-of-the-art complex featuring retail, theater, and entertainment facilities built above the fully operational Marriott ballroom. The project was built within a highly aggressive schedule, downtown logistics and unprecedented engineering requirements, on schedule. Project: $5 Million Old Town Center - Los Gatos, Ca 1998 Superintendent Provided site supervision of a 40,000 sq. ft. underground parking garage and 30,000 sq. ft. core and shell retail buildings above. Supervised soldier beam / lagging shoring, excavation, shot Crete, MEP trades, concrete deck, framing, plaster, roofing, underground utilities, glazing, painting, elevator, with design team, city building department, special inspection, and owners representative. The garage and retail buildings were ready for occupancy and T.I. contactors in 7 months, on schedule

Mark G. Foti, General Contractor - Redwood City, California Superintendent 1996-1997 Project: $1.8 Million - Three Custom Homes, San Mateo County, California Scope: Supervised framing and subcontract coordination. John & Connie Romeo - Redwood City, California

General Contractor 1996

Project: $650,000, 4,000 Sq. Ft. Custom Home

Scope: Framing and sub coordination.

Douglas Ross Construction - Redwood City, California Foreman 1993-1996 Projects: Four Multi-Unit Rehab Seismic Retrofit Projects Scope: Provided leadership, direction, and support to construction crews. Gavlan Development - California

Superintendent / Framing Contractor 1993-1996 Projects: 39-Unit Condominium – Stanley Boulevard, Pleasanton 12-Unit Office Warehouse – Rodeo Gulch Road, Soquel Office Industrial Unit – 627 Walker Street, Watsonville Office Building – 3333 Soquel Avenue, Soquel

35-Unit Motel – 110 Riverside Avenue, Santa Cruz

90-Unit Riverside Motel – 60- Riverside Avenue, Santa Cruz Scope: Framing Contractor and sub coordination

From 1981 to 1993 performed as General Contractor, Framing Contractor, and Superintendent on various residential and commercial construction projects.

EDUCATION / EXPERIENCE

Construction Management Certificate Program 1998 - San Jose State University, San Jose, California Construction Project Management, Pre-Construction Estimating, Construction Practices, Construction Supervision, Uniform Building Codes, California Construction Law

• California Contractors license 1981

• Carpenter’s Apprenticeship 1972 - Kings Beach, California

• Computer: MS-Windows 3.1, Windows 95, MS-Excel 97, Meridian’s Prolog Manager, Microsoft Project 98

• CPR Certification

REFERENCES

Clarum Byldan Corp Terry Brown 650-***-****

Palisade Builders

Jim Hanson 707-***-****

Barry Swenson Builders

Larry Barrett 408-***-****

Nexgen Builders Inc. 650-***-****

Noel Chamberlain 650-***-****

WE 0’NEIL CONSTRUCTION CO.

310-***-**** Len Smith

TURNER BUILT INC.

650-***-**** Bruce Turner

TIM BARRETT CONSTRUCTION 650-***-****

GARY STAFF CONSTRUCTION Gary Staff 650-***-**** CANNON CONSTUCTORS INC. Jerry Griffin 650-***-**** BOVIS CONSTRUCTION CORPORATION John Moyer 650-***-**** MARK G. FOTI, GENERAL CONTRACTOR 650-***-**** DOUGLAS ROSS CONSTRUCTION 650-***-****

STEVE CASE CONSTRUCTION 650-***-****



Contact this candidate