Post Job Free

Resume

Sign in

Project Engineer Controls

Location:
Detroit, MI
Salary:
85-110K
Posted:
August 17, 2023

Contact this candidate

Resume:

RESUME

Name of person

Joseph F. Bobowski

Profession

Electrical/Controls Facility Engineering

Position in firm

Specializations

Contact Information

Electrical/Controls Project Manager/Engineer

Facility, Conveyors, IT Systems and Electrical

Equipment Installation Bid Packs, Designs, Demolitions, Reworks, and Commissioning Support Activities

Email: ady0fl@r.postjobfree.com Phone: 734-***-****

KEY QUALIFICATIONS – Employment Record

02/2023 to

04/2023

Sterling Engineering - ATS Automation – Controls Engineer Inspected, Reviewed, Punch listed and Validated tooling and the associated conveyors and Over/Under Pallet systems for the Battery Module Assembly Systems. Start Up assistance included Coordination and Debug of multiple automated robotic Assembly Systems within the GM FZ Assembly Plant. Assistance included Control Logic Validation, Interfacing, and Coordination with Robot, Plant, and Contractor teams. 06/2022 to

02/2023

Corporate Cleaning – Cleaner

Provided Evening shift related General Cleaning services including trash collection, mopping, wiping desks and chalk boards, for multiple Classrooms, Offices, Hallways, bathrooms and Activity Centers as required within Plymouth Christian Academy school for Elementary thru High School Buildings and Outdoor Modules. 05/2022 Martinrea – Controls Engineer

Reviewed Auto Brake Lines 2, 3, 4 and other PLC related equipment and controls for existing operational conditions and faults. Monitored and Edited existing PLC programs Online during Production hours to identify and debug miscellaneous undefined faults. Created PLC program printouts of existing programs and edited as required to maintain commonality/consistency of PLC Programs content between systems. 02/2022 to

03/2022

KUKA – Controls Engineer

Completed KUKA Safety Orientation and Training Onsite within the Livonia Manufacturing Plant. Reviewed wiring, Controls, Control Panel and PLC configuration for the CASE Line Station 10. 09/2021 to

10/2021

International Door – Controls Engineer

Quoted, Reviewed, Designed and Built Controls and related Control Panels for Industrial Door Systems. Updated Hardware and Software (drawing and PLC) documentation to company and client standards. 05/2021 to General Motors (PROINDCON) – Controls Engineer 07/2021 Reviewed existing and New Electrical/Mechanical issues for Conveyors, Equipment, IT, ASRS, Tooling and Facilities issues as part of the 2nd Shift Maintenance Team to support General Assembly Plant Production. Responsibilities included monitoring/modifying MicroLogix based AGC system Units within the North/South Door, Gas Tanks, Headliners, Conv. 17-3, Conv. 17-10, and Conv. 17-15 Materials Kit Delivery Systems. 02/2021 to ESYS/J&R Automation-Hirotec (Comtech) - Controls Engineer 03/2021 Acquired and reviewed Online Whiz Safety training modules material, E-Plan training, and other materials so as to pursue additional GM Certifications. Acquired MCCC GM Training to Achieve GCCH-1 Certification and trained for GCCS-1 and GCCS-2 Software Certifications as required for use with GM Oshawa Project. 01/2019 to CKGP^PW (Venteon Holdings) – Sr. Electrical Controls Project Engineer 03/2020 & Identified and Documented FCA JNAP General Assembly Plant Electrical Conveyor Controls and Equipment 06-07/2020 Bid Package for 2022 WL Project. Provided Jobsite Field Validation and Corresponding As-Built Documentation of GM/Navistar (Springfield, OH) Sub Station Breakers, Bus Ducts, Lighting Panels, Bus Plugs and related power drop loads and connections. Identified Power Connection Details for Assembly, CAS and Paint Shop Opportunity Charger Systems. Provided Jobsite Bid Package Follow-Up for Launch Program related activities at FCA WTAP Paint Shop Conveyors, Process, and IT related activities. Maintained IT Meeting Minutes for WS-DS (WTAP) and WL (Mack) projects IT Controls Coordination Meetings. Joseph Bobowski – Electrical Engineer – Resume (Continued) 05/2018 to The Productivity Team (Comtech) – Sr. Electrical Controls Engineer 10/2018 Managed, Coordinated and Documented the Electrical, Controls, Facilities, Networks and related Connections for the Oberon Refrigeration/Freezer Production Line at the Middle Amana IA Production Plant. Prepared SOW, SOP and Bid Packages for AGV, Fixed Conveyors, Facilities and IT Networks. Reviewed and Prepared documentation for Tooling Equipment Selections. Reviewed, resolved and/or commented on contractor bids. 9/2017 to LESCO (CSI) – Controls Integration Engineer – Sr. Project Engineer and Field Installation Supervisor 03/2018 Designed, Managed, Quoted and/or Coordinated, Punch-listed, and Documented Body, Paint, and GA related conveyor installation issues to achieve per GM (Oshawa) Red Tag system acceptance. Worked with GM team, Suppliers and/or Installation Subcontractors for resolution of Process and Conveyor systems for Safety, Construction, Hardware, Software (Rockwell) and Installation related Onsite Issues at GM Lansing Assy.Plt. 04/2016 to Ford Motor Co. (Epitec) NGAVS IPI Lead Controls Engineer 08/2017 Managed, Coordinated, and Documented NGAVS Launches within the Onsite Implementation Team for multiple Ford Motor Assembly Plants within the N/S American Regions. Activities included creating, reviewing and maintaining Rockwell Programs and Project related drawings, schedules, documentation, Webex and Group related Meeting Minutes. Jobsite activities, additionally, included field validation of operator related control panels, PLC logic, HMIs, and the related network cabling installations so as to verify the complete NGAVS, EP, and QLS systems where required.

02/2015 to

04/2016

Design Systems Inc. - Electrical/Controls Project Manager, Senior Electrical Project Engineer

(Provided engineering services at multiple GM, Ford, and Chrysler company related offices and/or plant facilities with launch management teams for over 25 various new/rework plant projects. Work included plant and Vendor on-site support activities, Launch Management Team development and design of project specifications, oversite of contractor Design, Installation, Rework and/or Demolition projects, and the follow- up of design details (including Power, Water, and Air connections) for complete Conveyor, Facility, Material Handling, select IT Systems and Stamping/Equipment bid packages.) 02/2014 to

02/2015

Dearborn Mid-West Conveyor – Electrical/Controls Projects Engineering Manager

(Managed Electrical and Controls Engineering manpower to support Sales, enable group and individual performance advancements. Engineered multiple (Rockwell HW/SW) projects, supported internal R&D projects with new products/materials, and provided Engineering Staff with team reports/coordination.) 03/2012 to

02/2014

Gerdau Special Steel Division – Electrical/Controls Project Engineer

(Managed, designed and/or coordinated multiple steel plant Capex projects including the associated Electrical, Mechanical, Civil, Piping and IT related Layouts, Designs, Interferences, HW/SW, debug, startup and installation related Issues. Assisted Project Teams for Contractor Bid Packages and related documentation. Projects included Caster Pumphouse/Hydro-cyclone System, Flynn Burner Heat Treatment System, Truck Scales, Tarping Building, Water Treatment Plant and Acid Etch Lab.) 09/2011 to

02/2012

06/2011 to

09/2011

01/2011 to

04/2011

Indicon Conti Corp. / (Quanta Engineering) – Electrical/Controls Project Engineer Managed, debugged and coordinated HW and SW design, installation, debug and startup of Punch-list related QLSCM and FIS issues. Projects included Ford Motor Van Dyke Assy. HF35 & 6F-35 Transmission Systems, GM Flint 800 Program Conveyor modifications, and GM Lake Orion vehicle launch support. Martinrea FABCO Hot Stampings, Inc. – Controls Engineer Reworked and maintained Hot Stamping Press and Assembly Weld systems including Robots, Ovens, Weld Cells and related PLC controls to support “C” shift operations. Cinetic Automation (Fives) – Electrical/Controls Project Manager

(Managed, coordinated and developed 2012 GEMA Plant documentation packages for multiple Chrysler/Fiat projects including (related Rockwell HW/SW) for Engine tools, Robotic automation, Washers, and Leak Test systems per WCM standards. Identified FMEA, QM, QX, JSRA, SWI, SOP, PM Tasks, AM Calendar, Machine Ledger, TPM, RWP, etc. issues.)

09/2010 to

12/2010

ITT Technical Institute – Adjunct Instructor

(Prepared lecture material, reviewed, graded and mentored numerous students within 4 Electronics Classes. Material included “DC Electronic Theory” and “Electronics Devices” Courses and all related Labs, homework assignments, quizzes, and tests.) Classes were held within Southfield and Dearborn sites. Joseph Bobowski – Electrical Engineer – Resume (Continued) 08/1990 to

01/2009

02/1989 to

08/1990

Design Systems Inc.– Note: 18 years + Senior Electrical/Controls Project Engineer See DSI details above for complete engineering/employment details/activities. Rapistan Corporation (Dematic) – Electrical/Controls Project Engineer

(Developed and provided hardware schematics and PLC logic (Rockwell) for belt and roller type conveyor systems including on-site installation, programming, commissioning, and training. Managed schedules and progress reports for engineered systems.)

06/1984 to

02/1989

Acco Babcock, Systems Division (Durr) – Sr. Controls Engineer

(Provided hardware and software (Rockwell, Modicon) designs including installation startup and commissioning for multiple automated conveyor systems including Overhead P&F and Monoveyor conveyors utilizing AB PLCs and related controls.

EDUCATION

• BSEE - Lawrence Technological University, Southfield, MI (1982-1985)

• University of Michigan – Dearborn, Dearborn, MI (1980-1982)

• ASEET – Henry Ford Community College, Dearborn, MI (1978-1980) EXPERIENCE/EXPOSURE

• Conveyors: Designed and/or Followed-up Installation for Inverted/Overhead P&F, COE, Monorail, Monoveyor, Lift & Carry, Roller, Gravity, Belt, ASRS, AGV, Over-Under, Tube, Skillet, Skid, and High-Speed Sortation Systems

• Documentation: MS Office Word, Excel, Power Point, Outlook, Project, Lotus Notes, Access, Adobe

• Hardware: JIC, IEC, Motors, VFDs, Servo, Ultraware, Magnetic circuits, Control Panels

• PLC Hardware: AB PLC2, PLC3, PLC5, Control Logix, Guard Logix, Mitsubishi, Modicon, Rockwell Software

• Control Networks/Power: Ethernet, RS232C, D-Net, C-Net, DH+, R-I/O, A/C, D/C

• Booths/Tanks: Phosphate, E-Coat, Washers, Weld Water Systems, Furnaces, Scrubber Systems

• Safety Systems: Interlocks, PILZ, Light Curtains, Pluto, Lockout Placards, Guard Logix

• Software: Allen Bradley Rockwell - AB PLC5, PLC2, PLC3, RSLogix 500, 5000, SLC 505, Studio, Wonderware

• IT/Miscellaneous: FIS, QAS/QLS-CM, VMS, PFS, AVI, Vision, ALS

• Certifications/Electrical Engineer PE License - Phase 1 (EIT), GM GCCH Certification, GCCS Training



Contact this candidate