Post Job Free

Resume

Sign in

Construction Manager Center Data

Location:
Canonsburg, PA
Posted:
June 26, 2023

Contact this candidate

Resume:

Carl Kubiczki

Email: adxxey@r.postjobfree.com Phone: 724-***-****

SUMMARY:

Extensive experience as a Construction Manager and Project Manager overseeing high voltage substations, transmission, distribution, and utility-scale solar power generation projects. Direct all aspects of construction of large-scale projects from cost development through project closeout valued up to $1.8B. Supervise Project Superintendents, Foreman, subcontractors, and office support. Hold full accountability for profit & loss outcomes, large-scale budgeting/forecasting and approvals and all bid packages. Coordinate all aspects of the job including primavera scheduling, design, tooling, material costs, and manpower requirements. Coordinate project staffs, subcontractors, quality assurance specialists, and other relevant personnel.

PROFESSIONAL EXPERIENCE:

Orbital Engineering 2019-2023

Senior Project Manager

Manages subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on 7 distribution reconductoring projects for Penn Power.

Monitored on-site construction and provided oversight of safety, QA and QC. Ensured all necessary permitting and environmental controls were being adhered to at all times.

Delmarva Power 2017 – 2019

Construction Manager

Managed subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on transmission line and substation equipment upgrades.

Performed estimating high voltage, transmission, and substations projects, LV distribution projects, upgrades and reliability projects.

Monitored on-site construction and provided oversight of safety, QA and QC. Ensured all necessary permitting and environmental controls were being adhered to at all times.

ElecnorHawkeye 2015-2017

Senior Project Manager

Managed subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on the construction of two 35 KV distribution systems (1) 6 Mile and (1) 7 Mile and the addition of (1) Bay to Substation 80 for RG&E Utility

Monitored on-site construction and provided oversight of safety, QA and QC. Ensured all necessary permitting and environmental controls were being adhered to at all times.

POWER ENGINEERS 2014-2015

Construction Manager

Managed subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on the construction of the NEEWS Instate Reliability Project. The Project consists of two 345 KV Substations and 60 miles of Transmission line.

Monitored on-site construction and provided oversight of safety, QA and QC. Ensured all necessary permitting and environmental controls were being adhered to at all times.

Randstad Engineering 2012 – 2014

Chief Engineer/Construction Manager

Managed subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on the construction of the Morenci Mine Expansion, Freeport-McMoRan Copper & Gold, Inc., Morenci, AZ ($1.8B) – Project consisted of: 55KMetcalf Mill Optimization Project, 16 K Mill Optimization Project.

Pike Energy Solutions (formerly Pike Elec.) 2009 – 2012

Construction/Substation Construction Manager

Managed subcontractors on site for safety, productivity, and accuracy to Owner’s scope of work on Mount St. Mary’s 17.1 MW Thin Film Solar Plant, Emmitsburg Md. (60MM) project consisted of thin film solar panels on 100 acres of Mount St Mary University.

Additional projects consisted of Substation upgrades, including Carson and Cheswick. Added (1) 50 MVA 138,000/23,000 distribution system transformer to each substation. Constructed a new 345kV substation at Bruno Island and a new 138KV GIS substations at Forbes and Liberty. Manager of Construction responsible for the construction of 11- 345 KV/115KV substations which required daily site visits to my 11 site construction managers for CMP Utility located in Maine

MBR 2008-2009

Senior Project Manager

GSK Data Center Data Center, Collegeville, PA ($175MM) – Project consisted of 22 Miles of 35KV distribution system consisting of (1) 7 mile and (1) 15 Mile feeding the main substation. Main Substation consisting of Two Service Entrance 35KV Switchgear, (2) 15MVA, 33000Y/13,200Y, ABB Transformers. Six 3,000 KVA, UPS systems Liebert, 36 STS, Liebert, 36 PDU, Square D, 36 – 500KVA Transformer Square D, 120 RPP each containing 4 – 42 circuit panel boards, Cyberex completed integrated system testing for eight 2000KW Detroit Diesel Generators with paralleling switchgear. Two 13.2KV build Service Switchgear, Ten 13.2KV/600V or 480V Unit Substation. 30 Automatic Transfer Switches, all power and lighting distribution systems.

CEMEX 2005 – 2008

Senior Project Manager/ Electrical Department Manager

Black Mountain, Victorville, CA, ($12MM) Project consisted of ($12MM Crusher Re-powering Project) 7 Miles of 35KV distribution system feeding (1) 10MVA, 34,500/4160 Transformer (3) 2500/480-volt Transformer.

Rost Enterprises, LLP

Senior Project Manager 2002 – 2005

Orbital Engineering 2000 – 2002

Construction Manager

American Steel Processing 1989 – 2000

Vice President, Construction

Hoogovens Technical Services, Inc. 1982 – 1989

Project Manager

EDUCATION:

B.S., Electrical Engineering – University of Pittsburgh, Pittsburgh, PA

CERTIFICATIONS:

OSHA 10 & 30-Hour Occupational Health & Training



Contact this candidate