Post Job Free

Resume

Sign in

Mechanical Engineer Project Manager

Location:
Warren, NJ
Posted:
June 26, 2023

Contact this candidate

Resume:

EHSAN

YOUSEFI

Authorized to work for Any

Employer in US

Piscataway, NJ. U.S., 08854

+1-732-***-****

adxxam@r.postjobfree.com

OBJECTIVE

I am Ehsan Yousefi. I have more than 17 years of experience working in the industry and on-site. I have the ability in different areas such as preparation of work explanation for implementation and Maintenance in industrial projects, project management, supervision and control of implementation and Maintenance in industrial projects, preparing a bill of material, goods, and equipment for industrial projects. I have experience in the field of performing all kinds of Maintenance, such as Overhaul Maintenance, Corrective Maintenance, Breakdown Maintenance, preventive Maintenance, Predictive Maintenance (PDM), TPM (Total Productive Maintenance), Lean Maintenance, Emergency Maintenance (EM) in industrial sites. and I also have experience working with CMMS (Computerized Maintenance Management System), Management of physical assets and equipment, PMP (Project management Professional), PMBOK (Project Management Body of Knowledge).MY software skills are: ANSYS, ABAQUS, SOLID WORKS, COSMOS, AUTO CAD, CAESAR II, PDMS AVEVA (AVERAGE)

EDUCATION

Master of science: Mechanical Engineering Applied Design AHVAZ BRUNCH AZAD UNIVERSITY, IRAN

2008 – 2011

Thesis: Modal Analysis of compressor Turbine Blade with Composite Material In My Thesis, I Simulated the Blade of Compressor Turbine in ANSYS Software and Endorsement the Result of It with Theoretical Solution.

Bachelor of science: Mechanical Engineering-Solid Mechanic UNIVERSITY OF TABRIZ, IRAN

1999 – 2004

Thesis: Stress Analysis of Gear Box of Cement Factory with ANSYS Software In This Project the Gearbox with Large Dimensions Was Simulated in Ansys Software By Applying The Boundary Conditions And Its Results Such As Stresses And Displacements Were Extracted. 2

EXPERIENCE

Mechanical Engineer FARS KESHT AFZAR Company

2012 – 2023

I was Project Manager and Supervisor in the Manufacture and Technical office. Activities (Some of Them):

• Design Centrifugal Pumps with cad software, solid works, stress analysis and FEM with Ansys, manufacturing and testing of it.

• Design pipe rack and stress analysis and FEM with Ansys, it was meshed by beam element in Ansys, manufacturing and test of it.

• Maintain and Maintenance pipeline and stress analysis, FEM with Caesar II and commissioning.

Mechanical Engineer SINERE YASUJ COMPANY

2006 – 2012

I was Project Manager and Supervisor in the Maintenance and Technical Office. Activities (Some of Them):

• Design piping system in PDMS, stress analysis and FEM with Caesar II, Commissioning, and testing of it.

• Maintenance Of Ball Valve with Maintenance of Its Body by Build Up, eradicate All Crack and Renew It. For Performing This Project, At First It was tested by X Ray so after finding cracks all of them cut and eradicate of body valve. SKILLS

• Software:

ANSYS, ABAQUS, SOLID WORKS, COSMOS,

AUTO CAD, CAESAR II, PDMS AVEVA

(AVERAGE)

• Computer skills:

Windows, Microsoft Office

• standards:

ASME B31.3, B31.8 and B16

API 510, API 650, API 653, API 598,

API 1104 (Off Site), API 570 (On Site),

API RP 1107 (Off Site), API RP 1110,

API RP 2201 (Hot Tapping), API

Spec.6D

ASTM A216, ASTM A217, ASTM

A182, ASTM A352, ASTM A105,

ASTM A320, ASTM A193,

ISO

ABILITIES

PMP (Project management Professional)

PMBOK (Project Management Body of Knowledge)

Ability to prioritize and plan effectively.

Teamwork skills - to cooperate with other engineers, technicians and senior managers.

Ability to work with a computer and master related software.

Management of people, projects and resources

3

Preparation of work explanation for implementation and Maintenance in industrial projects

Project management, supervision and control of implementation and Maintenance in industrial projects

Preparing EPC (Engineering procurement construction) work explanation for industrial projects

Preparing a list of material, goods, and equipment for industrial projects

RCA (Root Cause Analysis of equipment failure)

MTBF (Mean Time Between Failures (

MTTR (Mean Time to Maintenance (

preparing the work breakdown structure (W.B.S) and supervision on the major Maintenance implementation of:

Centrifugal Pumps

Reciprocating Pumps

Centrifugal Compressor

Reciprocating Compressor

Ball Valves, Gate Valves, Plug Valves, Check Valves, Control Valves, and Safety Valves

preparing the work breakdown structure (W.B.S) and supervision on the implementation of:

Piping Construction

Piping Stress Analysis with Caesar II

Read & Analysis Piping and Instrument Diagram (P & ID)

Piping Isometric

Maintenance of Piping and pipeline: Above Ground and under Ground include excavation, pipe cutting with cutter (cold cutter & hot cutter), select material and pipe, Lifting the Pipe with Crane, welding, sandblast, coating, embankment, etc.

Preparing a list of spare parts for pumps, compressors, industrial valves in line with their supply

Alignment of rotating equipment (Pump and compressor, etc.)

RBI (Risk Base Inspection ( of equipment and industrial sites

RBA (Risk Base Assessment) of equipment and industrial sites

Knowing And Performance HSE (Health Safety Environment) In Workshop and Industrial Sites PUBLICATION

Paper: Using the difference quadrant equation (DQ) to post buckling analysis of the composite Symmetric Shell, reinforced by graphene layers. This Paper Published In the journal of new research in mathematics.

HOBBIES

Sports: Bodybuilding (I AM Athlete in Bodybuilding), Swimming, Volleyball, Going to the gym.

Hobbies and entertainments: Reading Book, camping trips, watching movies, go to sightseeing.



Contact this candidate