a
EXPERIENCE :
Omnicell :
Mitpitas.
October 2019 to 03/15/2023.
Mechanical: build cabinet for pharmacies, take BOM and MPI
build mechanical step by step complete and install PCB in to
cabinet, hook up cable to connect PCB, use Multimeter check
everything complete and test before passing another station .
Beahm Design:
Milpitas.
Mechanical Sub- assembly: before do Sub-assembly, take BOM
do audit next use Drawing or MPI do housing then install
electrical compressor air, vacuum, die heat box, vale,
temperatures control, fuser next use Blue sprint . schematic to
routing wires to complete after that test system, finally passing
Qc.
Vander Bend :
Sunnyvale.
May 2008 to December 2016.
Mechanical sub-assembly { do system of Intuitive Surgical }
Use Drawing and BOM build sub- assembly from A to Z [ base,
footrest, footdrive, monitor . after complete to testing and do
SAP, some time we go field service .
General Electronic [ GE Security
Newark.
May 2007 to 04/2008 and 11/2008 to 5/2011 .
Responsible; Hook up in module system with CT scanner pass
to integration .
Test support for testing,find out something wrong after that
replace :
Electrical [ PLC, Transformer, Hight voltage power supply,
heat exchange, detector, motion control from CT scanner, Air
condition, fire wall ], routing cables if find out something wrong
or damaged.
Mechanical install conveyor, X-ray tube .
Tear down system after QC done and pass down shipping.
ATS SYSTEM
Livermore.
March 2005 to March 2007
E/M assembler Technician;
Responsible: Build panel control box from A to Z complete,
use pin pusher, CPC crimper, lugs, ferrule crimper, using
Diagram, Blue sprint and schematic to routing cables, using
DVM trouble shooting find out something wrong.
Standard E/M Sub-assembly build system sola and conveyor.