I am a graduate engineer in mechanical engineering. I have 15 years experience
India and 12 years experience in Gulf in the area of Design,
construction, maintenance departments.
I wish to apply for the above said post. I have enclosed my curriculum vitae
for your kind consideration.
Thanking You,
Yours faithfully
S.RAVICHANDRAN
Cell: 00-91-733-***-****, 00-91-984-***-****
S. Ravichandran Mail ID: ******************@*****.***; ***************@*****.***
Position Applied For : Piping Engineer
Date of Birth : October 20, 1965
Marital Status : Married
Nationality : Indian
Passport Details : V9073256, Issued at Muscat
Communication Address : 104,first floor, No:5,North car street, Thiruvanai koil,
Trichy-620005.
E-mail : ***************@*****.***
Skpe I.D : ravichandran19611
Saudi Driving license No: : 235*******
Academic Profile
Degree : Degree in Mechanical Engineering passed out in 1996 at Regional Engineering College, Trichy, India.
Diploma : Diploma in Mechanical Engineering (DME)
Passed out in 1983 at Seshasayee Institute Technology, Trichy, India.
Additional Qualifications : Certificate course on Programming and Operation of CNC passed out in july, 2001 at Regional Engineering College, Trichy, India.
Certificate course in AUTOCADD R14, PDS, Micro station, PDMS
Caesor- 2,
Computer Skills
Software : AutoCAD, Microstation
MSWord, MSExcel,
Skills Profile
Conversant with the Preparation of basic engineering design & drawings including Piping Isometrics Piping layout, Equipment layout,Bill of Material, Steel structural drawings, Tank drawings, Pressure vessel drawings, Cement plant equipment drawings, etc.,
Familiar with various codes and standards viz., ANSI, ASME, API, ASTM, etc.
Having experience in Piping thickness calculation, Piping Reinforcement pad calculations, Piping Material Specification, Valve Data sheet.
Having experience in fabrication & execution activities of pipings & steel structurals.
Having exposure in RT, UT,DP .Having maintenance experience in rotating equipments.
Experience Profile
Working in TECHNSOFT ENGG.CONSULTANCY Tamil nadu, India.
Checking of Boiler Piping Layout Drawings, Piping Isometrics, Steel Structural drawings.
HAPBCO L.L.C., OMAN from February 2020 to May 2022.
Project: Quick Lime Stone Plant Construction Project Salalah, Free Zone Area.
Position: Project Manager.
Responsible for Civil, Mechanical, Electrical Work.
Responsible for Fabrication and Erection of Fuel Gas Piping, Compressor Air Piping, Waste Gas Duct, Combustion Air Duct, Cooling Air Duct, Kiln, Steel Structural Buildings, Storage Bins, Belt Conveyor Supports,
Erection of Compressor, Belt Conveyors, Bag Filters wih Fan, Rotary Air Lock, Screw Conveyors, Vibrating Screen, Roller Conveyors, Hydraulic Pipes, Hydraulic Operated Flaps.
Involved in flushing work, pressure test of hydraulic oil pipes.
Co-ordination with Client For Weekly Meeting, For Measurement Sheet, Invoice.
Review of drawings.
Estimation of manpower for steel structural work.
Worked in TECHNSOFT ENGG.CONSULTANCY, Trichy, Tamil Nadu, from 2017 to 2019
Checking of Boiler Piping Layout Drawings, Piping Isometrics, Steel Structural drawings.
Samsung Engineering company ltd. Saudi Arabia from June 2013 to June 2015
Projects: Saudi Arabian oil company: ARAMCO Riyadh Clean Transportation Fuel
Position: Piping engineer
Review of Equipment vendor drawings.
Involved in Site verification .
Co-ordination with civil, electrical, instrumentation, Mechanical departments.
Involved in Proposals, Hydrotest diagrams, Hydrotest procedure / packages
Preparation of valve MTO,
Design of Piping layout.
Quality checking of Plot plan, Nozzle orientation, Line designation table, Tie-in index,
Quality checking of piping isometrics using SMART PLANT REVIEW
Quality checking for clashes of piping with equipments, steel structures using SMART PLANT REVIEW
Involved in preparation of Safety Instruction sheet, Line List,
Involved in editing work in MICROSTATION drawings after extraction from PDS.
Preparation of Preliminary MTO using SMATO software .
Tebodin engineers & consultant, Bahrain, from July 2011 to Nov 2012.
Projects: EWA water projects, BASF Plastic additive chemical project,Eagle eye-Renckitt & Beckinser,
Position: Mechanical engineer,
Co-ordination with architectural, structural, civil, electrical, instrumentation departments for clashes.
Design of piping layout, Preparation of Bulk MTO, Tank drawings,
Preparation of valve data sheets
Quality checking of isometrics.
Preparation of Thickness Calculation of Water Piping, Reinforcement Calculation for Water Piping.
Co-ordination of Sub Contractors. Site Inspection of Piping, HVAC, Equipments for BASF.
Site Inspection of Hydrotesting of Piping for BASF.
Participated in meetings with client. Stress Analysis of Pipings by using CAESOR-2
Company: Hyundai Heavy Industries Co. Ltd. Kuwait, from May 2010 to May 2011
Projects: Sabiyah power plant 2100 MW.
Position: Piping construction engineer (Permit holder)
Follow – up of piping spools for fabrication, painting,
Co-ordination for Execution of gas oil pipings,fire fighting lines in pipe rack, gas oil tank area.
Co-ordination for hydrotest, pneumatic test for gas oil pipings, fire fighting lines.
Co-ordination of execution of pipe rack.
Co-ordination of sub contractors.
Co-ordinates with Mechanical, architectural, structural, civil, electrical, instrument departments.
Company:Gulf Spic trading & contracting company, Kuwait, from September 2008 to September 2009.
Projects: Kuwait oil company- As built of existing facilities
Position: Piping engineer (Permit holder)
To update existing General Arrangement Drawings (Piping plan) regarding Piping routing changes, Addition & Deletion of piping, Addition & Deletion of Equipments.
Verifying / taking measurements for pipe lines, pipings, equipment location showing in the above drawings.
Internal Inspection of above drawings after data collection at site.
Co-ordination with Client inspection for above drawings and getting approval.
Co-ordination with civil, electrical, instrumentation, Mechanical departments.
Company: Galfar Al-Misnad company, Qatar, From October 2007 to March 2008.
Projects: Dukhan flow line project.
Position: Piping engineer
Work (Design) package of oilwell flow line from well to de-gassing station manifold.
Work (Design) package of powered water injection spur line.
Co-ordination activities with Design consultant for conducting stress analysis.
Site survey to confirm the flow line routing, expansion loop location, anchor location.
Company: Integral services company, Kuwait, from October 2006 to September 2007.
Project : Sea water pumping station
Position: Piping engineer- site
Execution of pipe lines and pumps in sea water pumping station.
Involved in for maintenance of rotating equipments in power plant.
Participated in meetings with Doosan -main contractor, client,
Company: Kharafi National company, Kuwait, from 2005 to 2006.
Projects: Kuwait oil company up gradation of gathering centre, booster station.
Equate petrochemical complex shut down.
Quality checking of piping isometric drawings generated from Spool gen.3D model software.
Involved in piping execution in Equate shut down.
Company: Arabi Ener Tech. K.S.C. Kuwait from 2003 to 2004
Projects: Ministry of public works – Sewage water pumping station
Responsibilties:
Participated in meetings with client.
Involved in maintenance activities of pumping station rotating equipments, like various types of pumps,lifting station screw pumps, blowers.
Company:ALMarai Company Ltd., K.S.A., from June 2000 to Decemeber 2000
Projects: Al Marai company
Position: CAD Engineer
Preparation of drawings including equipment drawings, conveyor drawings, by using AUTO CAD software.
Field survey to prepare the drawings to modify/ improves the existing plant.
Co-ordinate with other departments for execution of works.
Company: SABIC ( R & D ) * Riyadh K.S.A, from May 1999 to May 2000
Projects: SABIC (R&D)
Position: Piping designer
To carry out the design & drafting activities for various multi discipline Design Change Requests
To prepare the drawings including P & ID, Piping Layouts, equipments layouts, piping Isometrics, Pressure vessel drawings by using AUTO CAD.
To do field survey to prepare the drawings to modify/improve the existing plant & piping.
Co-ordinate with other departments for execution of works.
Company; Dalmia cement (B) Ltd. India, from Oct 1983 to May 1999 (15 years )
Project: Cement plant- Engineering/ project department activities.
Position: Junior Plant Engineer.
Participated in Technical club meetings.
Involved in field survey to prepare the drawings to modify / improve the existing cement plant.
Involved in preparation of piping layouts for de oiled rice bran.
Involved in supervision of Retrofitting of Preheater fan with drive.
CoOrdinate with site engineering group during execution of the job.
Involved in design of Belt conveyors, screw conveyors, elevators, air slides in cement plant.
Involved in preparation of detail drawings for Bulk handling system like Belt conveyors, Pneumatic pump, Air slide supporting structures, steel hopper etc.,in cement plant .
Involved in preparation of detailed drawings for belt conveyor short supports, stringers,supporting structures in cement plant.
Involved in preparation of detail drawings for Blower pipeline, Process ducting, Air conditioning ducting in cement plant.
Having experience in Rotating equipments like, Ball mill, Kiln, Vertical roller mill, Pumps, Belt conveyor, Process fan, Compressors.
Taking measrements for Gears,Pinions and reverse engineering for Gears, Pinions.
Taking measrements for V-pulleys, Cement Mill Lining Plates.
Having experince in operation and maintenance.