James Ramirez
Leesville, LA ***** • 337-***-**** • ***********@*****.***
Professional Summary
Diligent and hard-working Heavy Equipment Operator ready to contribute solid effort as team member. Thorough and highly organized with excellent communication skills. Ready to bring construction experience and operating skills to a new role. Reliable worker with strong work ethic. Skills
Loading and Unloading
Effective Communication Skills
Punctual and Dependable
Heavy Equipment Operation
Road Construction
blue print reading
Asphalt Paving
Critical Thinking
Bulldozer Operations
Maintain Safety
Backhoe Operation
Team Leadership
loader operation
forklift operation
Work History
Heavy Equipment Operator, 01/2022 to 04/2023
Lemoine Construction – Lafayette, LA
Operated excavators, track hoe, back hoe, front end loader, practicing safety measures. Completed equipment inspections, repairs, and maintenance actions to prolong life of each piece of machinery.
Loaded and moved materials such as dirt and rocks based on specific job needs. Heavy Equipment Operator, 01/2018 to 09/2021
Appeck Aggregate – Lacassine, LA
Operated excavators, bulldozers and front end loader, practicing safety measures. Loaded and moved materials such as dirt and rocks based on specific job needs. Performed preventive maintenance to prolong life of equipment. Heavy Equipment Operator, 01/2013 to 01/2018
Appeck Construction – Leesville, LA
Operated excavators, bulldozers, lay down machine, track hoe, front end loader, back hoe and skid steer.
Performed thorough pre-shift and post-shift inspections lead a 10 man crew
Heavy Equipment Operator, 02/2013 to 05/2014
Maxfoot Construction – Ft Polk La
Operated front end loader and track hoe, practicing safety measures. Set wood and other forming materials to prepare for concrete pours. Leveled, smoothed, and finished surfaces of poured concrete for construction projects. Carpenter, 01/2011 to 01/2013
Larwood Construction – Bunkie, LA
Lead a 9 man crew
Operated a lull machine
Followed established job site safety regulations
Set wood and other forming materials to prepare for concrete pours, tied steel Leveled, smoothed, and finished surfaces of poured concrete for construction projects. Education
GED: 05/1989
Pickering High School - Leesville, LA