Marco Gutiérrez
adxpp3@r.postjobfree.com • www.linkedin.com/in/marco-antonio-gutierrez • 651-***-**** EXPERIENCE
SIEMENS ENERGY - Participating in the rotational Engineering Management Acceleration Program (EMAP) Client Service Manager - Philadelphia, PA Oct 2022 - present
● Coordinated successful completion of projects worth $2.5 million, managing repair shop timelines, budgets, and leveraging vendor capabilities, resulting in a 95% on-time delivery rate.
● Built strong relationships with diverse customers (O&G, nuclear, power generation, chemical, industrial) by maintaining regular communication and efficiently addressing logistics and personnel concerns in the field.
● Led numerous process and safety improvement projects in the service center, including a redesign of the shop’s over-speed trip test set-up, improving safety, reliability, precision - with a 90% refinement in accuracy. Development Engineer - Seattle, WA Oct 2021 - Oct 2022
● Oversaw the design, fabrication, and implementation of a compressor test loop, requiring thermal and structural analyses in ANSYS, modeling in NX software, and leading technical, cross-specialty design reviews.
● Authored a Technoeconomic Analysis for the Department of Energy, exploring the benefits and applicability of a novel hydrogen compressor prototype over traditional compressor solutions.
● Supported the cross-country transition of the Siemens Energy development lab to Redmond, WA, requiring correspondence with 3rd party contractors, raw material and parts suppliers, and the conducting of a Hazard and Operability Analysis (HAZOP) for future planned tests. After-Market Application Engineer - Olean, NY Jun 2020 - Oct 2021
● Generated over 60 commercial and technical proposals for upgraded parts and revamped compressors, working with engineering and supply chain teams to address clients’ needs and compressor performance concerns.
● Sold after-market opportunities worth $5.9 million for hardware and engineering scopes including upgraded labyrinth seals, compressor internals, accompanying rotor assembly hardware, and drawing changes.
● Facilitated communication between client-facing team and internal project management, product engineering, and packaging teams to ensure smooth transition from bid to project execution phases. BOSTON SCIENTIFIC Electrophysiology Research & Development Intern - Minneapolis, MN May - Aug 2019
● Created a noise-measuring test method for assessing bipolar electrical noise between ablation catheter electrodes.
● Wrote a MATLAB script designed to load electrical signal from the intra-cardiac signal amplifier, filter for extrinsic noise, and evaluate signal against qualitative and quantitative specification limits.
● Designed a test fixture and wrote, finalized, and carried out a test method used to validate a procedure for an esophageal temperature probe.
CONOCOPHILLIPS Facilities Engineering Intern - Midland, TX May - Aug 2018
● Established a pressure vessel inspection model to reduce costs for low-risk facilities, identifying and characterizing main failure criteria, and saving the company $15,000 yearly.
● Completed an audit for ConocoPhillips’ Plant Monitoring Software, improving the success of future projects.
● Investigated failures in high-density polyethylene piping, recognizing opportunities to prevent future failure. EDUCATION & HONORS
RICE UNIVERSITY - Bachelor of Science in Mechanical Engineering, Cum Laude
● Certificate in Engineering Leadership from the Rice Center for Engineering Leadership
● Buckley-Sartwelle Scholarship Recipient (2019); Rice Engineering Alumni Hard Hat Award Recipient (2019); Great Minds in STEM HEENAC Scholar (2018); Hispanic Heritage Award Recipient (2016) LEADERSHIP
External Vice President for the Society of Hispanic Professional Engineers’ (SHPE) Rice Chapter (2018 - 2019)
● Raised $14,000+ in sponsor funds, allowing 25 members (record number) to attend SHPE National Conference.
● Coordinated campus events for 15 sponsoring companies, improving member exposure to diverse industries. Chief Engineer of the Rice Electric Vehicle Team (2018 - 2019)
● Led an integrated mechanical and electrical team in researching, designing, and manufacturing an energy efficient, battery-electric vehicle for competition in the Shell Eco Marathon.
● Managed a 24-member team and $10,000 budget utilizing CAD software, lathes, and CNC mills for prototyping and assembling of the electric vehicle.