Post Job Free

Resume

Sign in

Field Engineer

Location:
Orange, CA, 92866
Salary:
90,000k per year
Posted:
June 14, 2023

Contact this candidate

Resume:

Nelson Gawat Ladores

Mobile: 214-***-**** Email: adxpjy@r.postjobfree.com/adxpjy@r.postjobfree.com

SUMMARY OF TECHNICAL SKILLS:

Testing, Commissioning and Integration Skill Highlights:

Installation, commissioning and site integration of Base Band 6337, 6651,6648, 6630, 5216, RBS 6601(DUW), 6102, 6201, 3308, 3206, and 3106 base station equipment.

Performs acceptance testing, commissioning and integration of new sites, performs feeder testing cable, insulation testing, grounding testing, testing of external alarms, call and PSAP testing and BER Testing for E1.

Ericsson LTE Certified

Ericsson Minilink TN Certified

Ericsson Integration Training and IXRE Certified

Equipment Handled:

RBS 3206, 3106, 3308, 6201, 6102, 6601, BBU5216, BBU6630’ BBU6648’ BBU6651, BBU 6337 and 6675 equipment.

Minilink E and Minilink TN (2p, 6p, and 20p)

Nera Transmission Equipment

NEC Transmission Equipment

Software, Test and Measuring Tools Worked With:

EMAS P6 and P7,OMT, TEMS, TEMS Light, Map info, Pathloss 4.0, Anritsu Sitemaster, Insulation Tester, Grounding Tester, BER Tester, Visio and Autocad 2008.

PROFESSIONAL EXPERIENCE:

October 2010 – To present

AMATEL, Inc.

Field Engineer, AT&T, Verizon and TMobile-LA-5G/LTE/UMTS Project, California, USA

Perform testing, commissioning, integration and troubleshooting of RBS 3206, 3106,3308,6102,6201,OBIF Solution, DUW, DUL, DUS, BBU5216 LTE, BBU6630, BBU6648, BBU6337 and P614 for ATT site.

Perform 911 PSAP simulation, live test call and Data test for all Carrier site.

Perform cross connection from FH panel to Equipment panel fiber patch for ATT small cell, cran and 5G.

Perform DUS migration to BBU6630 swap for Verizon project, includes termination of new power cable and GPS cable for BBU6630.

Perform pre check of the site, script and RFDS before proceeding on integration of the site which is 5G SA to 5G MM, BBU reconfiguration and 6675 integration.

Perform integration on small cell (cran and R&R Samsung to Ericsson) project and coordinate with TC from the pole to conform fiber test if TC is on the right pole.

Perform troubleshooting for fiber loss, from Hub site using power meter if the light level reading is good which include the SFP and the cross connection from FH panel going to BBU side. Coordinate with TC and send a visual light if they can see the light.

Perform Integration, troubleshooting, power upgrade, L1900, L700, L600, SCU commissioning, provisioning SAR-M and SAR-F router to extension router, IXRE commissioning and anchor L2500/N2500 for T-mobile

Perform QA of the site base on standard client specification.

March 2010 – September 30, 2010

CST Services

Field Engineer, AT&T and Verizon-BA-UMTS Project, California, USA

Perform indoor cabling and installation of RBS 3206 and LTE RBS 6201.

Perform PSAP simulation, live test call and Data test for 3rd Carrier site.

Perform testing, commission, integration and troubleshooting of UMTS RBS 3206 for 3rd Carrier site.

Perform RU Swap, T1 add, Tx Swap and Sector Add.

November 2009 – January 2010

Living@Sense Inc.

RND Engineer/TND Engineer, Digitel Philippines Phase 8B Project, Philippines

Perform full scale survey (Site Hunting) of new cell site for Digitel Phase 8B project base on a search ring given by the customer.

Plot, verify, and check the survey site thru the use of map info software.

Conducts LOS survey for the new site going to link up site and verify the LOS survey thru the use of pathloss 4.0 software.

Prepared Technical Site Survey Report (TSSR) and planning report for RND and TND.

Get all possible landmarks for the new site survey to present to the customer if it is possible to build a new cellsite with in the vicinity.

Prepared the LOS Path Profile, Transmission Link Planning and Budget.

Updated Mux plan for new E1 patching

January 2009 – October 2009

SK Telesys, Phil. SK Whain E & C Corp.

IE Engineer/CAD Engineer, Globe WIMAX Phase 1 and Phase 2 Project, Philippines

Conducts site survey for Globe WIMAX Phase 1 and Phase 2 Project.

Conducts site survey for the proposed location of RRU, GPS, WIMAX Antenna, porthole and Tapping point location for WIMAX Huawei Equipment.

Prepared Technical site survey report and carry out WIMAX site installation document and engineering survey.

Responsible for the CAD drawings such as Equipment room layout, Antenna Placement, Site Elevation, and cabling layout.

Perform testing and commissioning of RRU and BBU 3900 Huawei equipment using Huawei Wimax DBS 3900 software and perform functional testing when the site is on air.

Prepare as-built documentation for final acceptance.

May 2007 – December 2008

John Clements Consulting Agency Incorporated

RBS/TRM IE Engineer, (Ericsson DMPI Philippines Phase 6 and Phase 7, Philippines)

Prepares implementation engineering documentation for Ericsson Digitel Phase 6 and Phase 7.

Perform field site survey and update data for site installation documentation.

Responsible for the supervision of major drawing files and layout plans such as equipment room layouts, cableway, floorplans and cabling systems.

Conducts site survey and (LOS) line of sight for microwave radio transmission system for new and existing sites.

Prepared Technical Site Survey Report and carry out of Radio Site Installation Document and Engineering survey of RBS 2216, RBS 2116, BBS 2116, Eltek Rectifier and Transmission Equipment (Minilink TN AMM 2p, 6p, and 20p).

Update Site installation document as per implemented for as-built documentation.

Conducts indoor and outdoor survey for existing sites. Prepares As-built documentation for final customer acceptance.

April 2006 – March 2007

Alandick Philippines Corporation

RND, TND, and RBS Team Leader, Digitel Philippines Phase 6, Philippines

Performed full scale survey (site hunting) of new cell site for Digitel GSM phase 6 project based on the search ring given by the customer.

Verify and check survey sites whether the target coverage of the customer was followed using map info software.

Also conduct LOS for the new sites and verify the survey site if it is visible using topomap and pathloss 4 software.

Coordinate with site acquisition personnel for site approval and prepared the survey report to be submitted to the customer for approval.

Supervise during the implementation of telecom works such as RBS, Rectifier, transmission antenna, Panel antenna, and feeder cable installation.

Perform testing and commission of RBS 2216, 2207, 2106 and 2206 including emersion rectifier and transmission Minilink E.

Performed feeder cable test using site master and testing of external alarms and simulates to BSC. Cross connection and BER testing of A-bis link and assign during acceptance of sites.

July 2005 – December 2005

Electel AB

IE Consultant / Installation Engineering Department, Celtel Telecommunication, Brazzaville, Congo, Tchad, & Burkinaso, Africa

Perfomed radio surveys of existing sites to be change-out to Ericsson equipment.

Responsible for the preparation and detailed design of installation engineering documents for Ericsson RBS 2206 family of GSM base station.

Coordinate with RND/TND in verifying existing and additional TRU antenna configuration.

May 2005 – July 2005

ARS Telecom

Area Supervisor/Tester, Globe Telecommunication Phase 11, Philippines

Supervise during the implementation of telecom works such as RBS, Rectifier, Transmission Antenna, Panel Antenna, and feeder cable installation.

Perform testing and commissioning of RBS 2207, 2106, and 2206 including Emerson rectifier and Transmission (Nera and NEC equipment).

Sweep test feeder cable using site master and testing external alarms and simulates to BSC. Cross connection and BER testing of A-bis link and assign during acceptance of sites.

October 2004 – February 2005

Ctel Philippines

RF Engineer, Globe Telecommunication Phase 11, Philippines

Performed full scale survey (site hunting) of new cell site for Globe GSM phase 11 project based on the search ring given by the customer.

Verify and check survey sites whether the target coverage of the customer was followed using map info software.

Coordinate with site acquisition personnel for site approval and prepared the survey report to be submitted to the customer for approval.

September 2002 – January 2004

Consistel Philippines (Formerly Metapath Software International)

Project Engineer / IE Engineer, Globe Telecommunication Phase 9 & 10, Philippines

Performed site survey for Globe GSM phase 8b and phase 9 project of new and existing sites which includes power requirements, grounding system, equipment location, upper structure provision and others.

Design equipment room layout, civil and mechanical layout based on the survey.

Prepared the design proposal to be submitted to the customer and building owner for approval. Coordinate with site acquisition for permits and site access during implementation.

Supervised during implementation of D.A.S. and BTS equipment room to conform the standard requirement of the customer.

Assigned during Ready for Integration (RFI) acceptance of the site and performed necessary testing like sweeping of cable using Sitemaster Anritsu S331B version 6.31, Grounding System testing, Insulation Testing, Testing and Commissioning of RBS, Cross connection and BER testing of A-bis Link, External Alarm Testing and simulates to BSC.

Responsible for the preparation of as-built documentation.

March 2002 – July 2002

Alcatel Philippines

In-Building Solution Engineer, Digitel Telecommunication Phase 1, Philippines

Prepared survey reports based on actual In-Building survey.

Perform radio site engineering according to given processes, methods and rules in Radio Site Implementation process.

Ensure that the quality of the documentation is done in accordance with the requirements and specifications of the customer.

Conducts pre-installation survey with the installation group prior to installation proper and supervised during implementation to conform the standard requirement of the customer.

February 2001- December 2001

Teledesign Engineering Co., Philippines Inc.

Installation Design Engineer, Globe Telecommunication Phase 8b, Philippines

Prepared radio site investigation and engineering survey of RBS 2202 and RBS 2302.

Perform radio site engineering according to given processes, methods and rules in radio site implementation process.

Ensure that the quality of the documentation is done in accordance with the requirements and specifications of the customer.

Perform installation and integration of RBS 2202 for new RBS and change out site which includes testing and commissioning.

March 2000- February 2001

Teledesign Engineering Co., Philippines Inc.

RF Engineer, Globe Telecommunication Phase 7 & 8, Philippines

Conducts actual engineering and RF design for In-Building coverage of GSM 900 system.

Prepares installation engineering documents based on actual in-Building survey to be submitted to customer for approval.

Conducts pre-installation survey with the installation group prior to installation proper and supervised during implementation to conform the standard requirements of the customer.

Assign during RF acceptance of the site and perform data collection, RF signal optimization, spillage test, and handover test using TEMS lights.

September 1996- October 1999

Nesic Telecom Construction Phil’s. Corp.

CAD Operator, Digitel Telecommunication NX1 & NX2, Philippines

Feature editing and revision of wrong attributes according to project specifications.

Encoding of detailed drawings on bridge attachment, floor layout, primary, secondary design cables, aerial and underground using cablecad and autocad.

Digitizing of landbase map and conducts quality control to ensure that the output matches the data provided by the engineers.

November 1994- September 1996

Sidcophil

Engineer 1, Traffic Engineering Center Phase 3 & 4, Philippines

Install and maintain central office equipment for Traffic Engineering Center (TEC).

Assign and assist group in the field (communication, signal, detector, CCTV, and restoration).

Check on-line status of communication system through enchancement of modems and modify computer file of traffic system.

Perform corrective and maintenance of TEC equipment and install traffic lights and its local controller.

ADDITIONAL TRAINING:

Ericsson Integration Training – (IXRE Included) for TMO (March 10, 2022)

Ericsson Baseband 5216 Migration Course Training (March 19, 2017)

AT&T Hilti Firestop Training (March 12, 2017)

AT&T VAST Training (April 11, 2015)

SRS User Training (April 7, 2015)

CAM Tool Training for supplier (April 6, 2015)

TMO L700 Training – Fontana, CA (January 15-16, 2015)

TMO L1900 ODE Training – Fontana, CA (September 8-9, 2014)

WCDMA training – Fontana, CA (August 20-22, 2014)

AT&T CBU-DUW Modernization Training – Dallas. Texas (July 24-25, 2013)

RF Radiation Safety training – Chino, CA (April 3, 2012)

Minilink TN Training – Dallas, Texas (March 29, 2012)

PPC Training – Irvine, CA – (March 29, 2011)

LTE Delta Training – Dallas, Texas – (February 20-21, 2011)

First Aid Training/CPR – Chino, CA – (February 14, 2011)

OSHIA Training – Chino, CA – (February 17, 2011)

EXI Parsons Telecom Texas, USA – Quality Workmanship-RT2 (March 17, 2010)

Hilti Philippines Inc. – Post-Installed Anchors and Suitability of Hilti Anchors for Telecom Application (October 2008)

Ericsson E- Learning Course Security Sally (June 2007)

Anti Corruption (July 2007)

Is Tools – Site Handler (February 2005)

Andrew Institute – Training in VXL5-50, V5PDM-RPC, LDF4-50A, L4PDF-RC, Accessories (October 2002)

Ericsson Manila – GSM Essential (October 2000)

Ericsson Manila – UMTS Transmission Overview (September 2000)

Ericsson Manila – GPRS System Survey (September 2000)

Ericsson Manila – RBS 2000 Basics (September 2000)

Ericsson Manila – Competence Shift Certification Modules Included (IP world, Data Communication, Internet, Market Logics) June 2000

Ericsson Manila – Ericsson IT- Certification (Basic IT Knowledge, Windows, Word, Excel, Powerpoint, Outlook, Web Browser) June 2000

Nesic Telecom Construction Phils. Corp - Basic Drafting and Symbology (October 1996)

Crescent Technologies Institute – Autocad for the Professional (May 1996)

LICENSE:

California Driver License F1717805

EDUCATION:

Bachelor of Science in Electronics and Communication Engineering

Polytechnic University of the Philippines – Manila, Philippines

November 1993



Contact this candidate