GEORGE LAGORIO P. E.

adxp3x@r.postjobfree.com, 928-***-****

EXPERIENCE

**/** ** ******* **** ENGINEERING, Civil & Water Resources Engineering Services

Civil Engineer / President: 55 Cathedral Rock Dr Unit 9 Sedona, AZ 86351

Floodway Report Andante Creek Floodplain, Andante Dr, Sedona AZ

Single family residence encroaching into floodplain. Hydraulic analysis

including plans and report establishing floodplain delineation, flowrate, mean velocity conveyance, flow regime, erosion control and scour depth of over floodplain retaining

wall system.

Sulliivan Lane Water Line Ext. Town of Camp Verde, Camp Verde, AZ

Design of 1,600LF of 8” diameter D.I.P water line, 6” diameter sprinkler line stub-out

and two fire hydrants. Including water line analysis, unit price estimate,

alignment/grade staking, and coordination with Copper Canyon Fire Department.

Road Design Oak Creek Canyon, Sedona AZ

Design of 1,100LF of concrete roads with grades approaching 22% and 3 gravel

building pads along canyon walls. Including SWPPP/ (unique waterway), grading plans, drainage plans/report and unit price cost estimate.

Site Engineering Chamber of Commerce / Starbucks Project, Cottonwood AZ

Site plan, grading plans, drainage plans/report, SWPPP, ADOT transition structure/

storm water collection facility modification and subterranean detention basin design.

Foundation Design CVWS Office, Shop and Storage Facility, Camp Verde AZ Geotechnical Report /expansive soil PI >15. Structural Report / monolithic

reinforced turned down slab on grade.

Site Engineering FedEx Terminal, Cherry Rd, Camp Verde, AZ

Site plan, grading plans, drainage plans/report, SWPPP and design of 2,463 LF of 12” diameter class 350 D.I.P waterline and fire hydrant placement, including easement

descriptions, alignment/grade staking.

Floodway Report Jacks Canyon Floodplain, Juniper Street Project, VOC, AZ

Single family residences residing 100% within the aforementioned floodplain.

HEC-RAS analysis, foundation design / reinforced concrete pier system,

on-site engineering, and FEMA elevation certificate generation.

3/87 to 4/02 METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER

CHICAGO, 111 East Erie, Chicago, Illinois 60601

Thornton Transitional Reservoir Project, Deep Tunnel System 10/00 to 4/02

Resident Engineer: In charge of quality control, payments, scheduling analysis,

correspondence, public relations and safety. This $52 million project consisted of

7,280 LF of 28' diameter hard rock tunnels, diversion structure and surface structures.

Coordinated tunneling phases with adjacent Material Service aggregate quarry

Relocation of Vincennes Avenue Project, Thornton IL 5/00 to 4/02

Resident Engineer: Removal and construction of 5.5 lane miles of Illinois Department

of Transportation specified reinforced concrete super-elevated highway.

Site Prep Thornton Composite Reservoir 8/98 to 4/02

Project Manager: Multi phase project included land requisition/condemnation,

overburden stripping - 250,000 cubic yards, berm construction, and landscaping.

Responsible for design, production of contract documents, evaluation of Contractor’s

unit price proposal, quality control, correspondence, payments, scheduling and safety.

Additional Steam Line Facilities 2/97 to 12/98

Resident Engineer: 3,800 LF of 24" diameter HPS line, 7,800 LF of 6" diameter

condensate return lines, condensate receivers and corresponding telemetry.

OSSF Steam Line @ SWRP 11/96 to 1/97

Project Manager: 2,500 LF of 24" diameter HPS line, 4,500 LF of 6" diameter

condensate return lines. Fast track construction was brought in on time and on

budget in order to avoid winter weather claims from an adjacent concurrent contract.

O’Hare Sludge Line Relocation 1/96 to 10/96

Project Manager: 2,000 LF of 24" diameter cathodically protected sludge line and

associated surface structures.

Tunnel Rehab & Miscellaneous Improvements 12/93 to 1/96

Resident Engineer: 12,000 LF of 12" diameter water line, 2,000 LF of 24"

Perma-Pipe steam system and chemical grouting of 7,000 LF of existing utility

tunnels.

5/84 to 12/86 GEARHART INDUSTRIES, INC. Midland, TX

Engineer: Open Hole Division / Oil field Wire-line Services. In charge of calibration,

geophysical data procurement and interpretations. Generated computerized down hole

data from resistivity, self potential, sonic and nuclear tool runs.

EDUCATION

8/80 to 5/84 COLORADO SCHOOL OF MINES

1500 Illinois Street, Golden, Colorado 80401

Bachelor of Science, Geological Engineering

PROFESSIONAL REGISTRATION

Licensed Professional Engineer - Arizona- Civil- # 41465

MEMBERSHIP

ASCE



Contact this candidate