Post Job Free

Resume

Sign in

Hardware Configuration Power Plant

Location:
Dallas, TX
Posted:
June 12, 2023

Contact this candidate

Resume:

RESUME CLAIRMONTE C WILLIAMS

Cell: 469-***-**** adxn9h@r.postjobfree.com

Education & Certifications

•Ericsson RBS 2102, 2202 Edge Hardware Upgrade – Mixed Hardware Configuration.

•Nortel Networks – OC-192 Fundamentals FLM 150

•DC Power Plant Training

•HazMat Training

•Asbestos Drilling (OSHA) ISO certified

•Quality Audit Certification

•Mastec/ATT audits

•Ericsson RBS 2106/2206 GSM Cabinet Installation

•Introduction to Cellular Communications

•Ericsson RBS 2206 GSM Cabinet Test/Integration

•EME/RF Safety Awareness

TRAINING: US Cellular Nokia Siemens Networks Flexi LTE BTS Commissioning and

Integration 4G-LTE- Multiradio-002-FLSUSBC-USA Certification, 2013· Ericsson LTE Training, 2010· Nokia UMTS BTS Training, 2008 PROFESSIONAL EXPERIENCE:

GCATS LEVEL 3 CENTRAL OFFICE TECH AUG 2016-PRESENT

•Installation of 2 lineage Power Bay

•Construction of cable rack and frame

•Run and terminate power plant cables

•Run new Aisle ground feeder for the switch room

•Run alarm cable to BDFB

•Replace all BDFB, PDF and equipment frame covers

•Including breaker or fuse covers

•Installation of OCCAM 6012G

•Data Cabinet, Cisco7609-S Router

•Installation of TPA Fuse Panel, DC /AC Inverter

•Run Fiber to Crossover Panels and Patch Panel Port

Etak Systems Inc Field Technician July 2013- July 2015

Installation of Ericsson LTE & UMTS equipment used in voice, video, fiber optics and data

Telecommunications networks. Also experienced in installation OBIF 3C,4C. AC electrical cables and DC power cables. Experienced in running RF jumpers and sweeping jumpers. Other skills include the ability to complete RBS Installation Quality Checklist. Genband G5/G6 For

AT&T, installed bays lineup mount shelf including cabling, DC Secondary Pwr cable from Pwr bay to individual relay rack, DS3 cable, 26 pair cable copper 26-24 gauge wire rap cosmic frame, run fiber optic cables

MGA.Temprary Service Company. JULY 2012-JULY 2013

Subcontract to 3 Phase Technology, this company install DC Power Plant and Power Board,

Power Bay, upgrade preexisting battery plant on all AT&T Central office including Cell Site and Remote site throughout the country. They change out old battery replace with new ones, including adding new battery string with new rectifier bay to support add on battery. Work as Central Office

Equipment Lead Installer in Nextel/Sprint Long Distance Carrier Multiple

Subscriber Exchange and Regional Generator Signal Facilities thru South Texas Region.

Multiple Cisco Router Switches, Ericsson LG4 and LG5 Switches, LTE. LUC-ALC RNC,

Sycamore Switches, Juniper System Controller, IBM, Battery Panel Distribution Bay, Runs SubDirect Current Power cables, Fiber Optical cables Characterization, Splice, Connecterize and Testing, Ethernet cables, Coax cable in variable size, connected to new installed and pre-existent equipment.

Amatel Inc Dallas TX Installation Technician AUG. 2011-JULY 2012

•RT0 UMTS Ericsson Equipment, ongoing installation& integration for AT&T TX region TX market /Oklahoma/Arkansas

•Installed Ericsson cabinets & installed BBU cabinets when required

•Complete installation or Ericsson edge equipment on various cabinet configurations such RBS 3814 Indoor cabinets

•Site audit, installed RF cables and to its destination

•Run power cables RU 22 to Lorian power bay and connect to its location

•Install radios RRU /RBS 3518indoor /3206 indoor cabinets 3106 outdoor cabinets/RBS

2206 indoor /850GSM /RBS1900

•Install breakers into positions and power up system...Install MU / RAX Card /TX Card and run T1 Cables to destinations

•Install LTE and FR Sweeper and net sure Power Distribution Pos.

MGA CENTRAL OFFICE INSTALLATION TECH JAN2009-JULY 2011

Equipment Installer/De-Installer, System Turn-Up, Provisioning, and Testing. Installed new additional bandwidth to accommodate system expansion on Internet Protocol fast growing customer need on internet. De-Installed old Nortel DMS switch, removed all cabinets, power direct current cables, ds1 cables, fiber opt additional bandwidth to accommodate system expansion on Internet Protocol fast growing customer need for internet Installed multiple Nortel

DMS Switches in AT&T facilities, CO-LOCATE Gates site, Verizon, Southwestern Bell, Sprint,

MCI-World Com, FE Communication, Adelphia Communication, Bell Atlantic. Installed system cabinet, power bay cabinet, direct current power cables, ds-1 cables, ds-3 coax cables, fiber optical cables, and Ethernet cables.

SDS CENTRAL OFFICE INSTALLATION TECHNICIAN April 2000-September 2008 Lorain/Marconi-400, 200 Rectifiers.

•Peco 2 Power Bay.

•Construction of Battery strings. Install Cable Rack.

•Lucent, Nortel, and Siemens DLCs

•Lucent, Tellabs, and DSC DACS

•Lucent and Hekimian special service test equipment

•Hi-Gain (old Pair Gain) and Ad Tran Products

•Cisco Routers and Switches

•Installation of 3192 Wescom Repeaters, Litespan 2000 and Alcatel 1603’s, 1630’s,

1631’s and 1640’s

•Installation of all FLM 150’s, FLM 600’s, FLM 2400’s and Fujitsu Flash 192

•Installation of Titan 5500, ADSL, DS1’s and DS3’s Installation of DC / DC converter plants for AT&T.

•Assembly of battery stands.

•Installation of lead calcium wet cell batteries construction of bus bar systems.



Contact this candidate