Experienced in all aspects of engineering for buildings and facilities operation, design, and construction. Trace 700, Revit/AutoCad software, Microsoft Project, Means Cost Estimate, Excel, Word, EnergyPro, Carrier Load, SAP/EAC. Projects requiring a high level of knowledge and experience to achieve a successful outcome for all, working closely with local safety authorities, facilities maintenance, procurement, and upper management to complete the projects on time and in budget.

Special Skills:

• Engineering Strategic Planning

• Load Calculations

• Energy Analysis/T24

• Systems Design

• Construction

• Commissioning

• Controls

• Schedules

• Cost Estimates

Engineered Systems Including: High Performance Air System Design, Chilled Box/Beam, Radiant Panels, Vrv/Vrf & 3-pipe HR, Dedicated OSA, Indirect-Direct Evap, Fin Tube Valence (heating or cooling), Thermal Energy Storage, 4-pipe Hydronic HR & Grid, Fan Walls, High Performance Building, Double Duct Vav, Zero Net Energy, Hybrid Fluid Coolers, Engineered Resin, ALC Controls, Variable Frequency Drives, Process Exhaust, Fume & Laboratory Exhaust, Hospital OR, Clean Rooms, Hepa Filters,Fin Condensate Recovery, Vacuum Chambers, LN2, GN2, Hazardous Gases, H Occupancy, A/B Occupancy, Plumbing Water & Waste, Storm, Rainwater Recovery, Mold Abatement, DC/AC Power, Critical Computer Rooms, Chilled Water, Heating Water, Steam Low & High Pressure, Central Plants, LEED.

Developed combining Chilled Water Grid technology with Simultaneous Fully Modulating 4-pipe Hydronic Heat Pumps such as MultiStack VME II or Robur/Chiltrix. This solution allows groups of buildings and heating cooling loads to be served from water or air cooled heat pump equipment potentially without the use of natural gas boilers or evaporating water cooling towers.

Developed use of VFD fan wall technology as a safe quiet replacement for aging vane-axial fan building air conditioning systems.

Net Zero water use options for Cooling Towers, Hybrid Fluid Coolers, engineered resin technology, rainwater and condensate fin water recovery, RO water blending, reclaim water.

Zero Net Energy, High Performance Building, and LEED - Design and Commissioning.

Critical Data Center Redesign - Design out the reheat for energy savings with variable airflow computer room AC units, add a room vapor barrier, dedicated outside air unit for room humidity control. Also indirect/direct units for 100% OSA design.

Replace low efficiency filters with low pressure drop 95% efficiency filters. Provide fan speed controlled ceiling HEPA filters for OR's & Clean Laser Labs.

Custom Air Handler design including high performance Double Duct Dual Fan VAV.

The Chilled Water Hydronic Grid connects together individual chiller plants in separate buildings, any chiller in any building can serve any load in any building, often one chiller can serve an entire campus in winter.

Central Plant Chiller and Pumping optimum analysis including Steam, Electric, Thermal Storage, High/Low Pressure Steam or Hydronic Boilers and Pumping; Laboratory Process CHW/HHW.

Laboratory, Process, & Kitchen exhaust systems; Hospitals and Clean Room systems.

Aug 2015 to Dec 2019: Sr. Mechanical Engineer with S&K Engineers, 421 E. Huntington Blvd., Monrovia, CA. 910**-***-*** 1383 May 2012 to July 2015 – Independent consultant.

Dec 2002 to 2012 – Sr. Facilities Mechanical Engineer project manager at Facilities Engineering & Construction for HVAC/Plumbing/Electrical, The Aerospace Corporation, El Segundo, Ca.. In that capacity developed and coordinated design and engineering scope of work plans for existing facilities and new construction projects including: offices, laboratories, & data centers. Noted accomplishments included relocation of laboratory facilities from LAFB to D1 and BRAC facilities consolidation, AGO chilled water grid design and commissioning, LN2 tank and distribution at D8, thermal vacuum and battery test labs at A6, process cooling and HEPA ventilation for laser labs and laboratory equipment, high performance HVAC replacement with DDVAV at various buildings, ongoing expansion of ALC controls to zone level at all buildings, repair of 1985 HVAC smoke control system at A8.

1999 to 2002 – Mechanical hvac/plumbing/electrical engineer project manager at Toft, Wolff, Farrow, Inc., Newport Beach, Ca.; projects included DFS Galleria and Renaissance Hotel at Hollywood and Highland; Marriott’s Shadow Ridge Resort, Palm Desert; Gila River Clubhouse, Phoenix; Micro-Machines Clean Laboratory, Monrovia; Central Plant Renovation for Green Building at Pacific Design Center; Facilities Mechanical Master Plan for El Camino College, Torrance. 1997 to 1999 – Mechanical hvac/plumbing/electrical engineer project manager at McDonnell Douglas / Boeing, Huntington Beach, Ca. under contract with P2S Engineering; projects included relocation of laboratory and technical engineering and space launch facilities from Downey to Huntington Beach.

1985 to 1995 – Project Manager / mechanical hvac/plumbing engineer at Store, Matakovich & Wolfberg, El Monte, Ca.. Projects included Central Plants, Site Hydronic & Steam Piping, Hospitals, Laboratories, Clean Rooms, Office Buildings, High Rise, Restaurants, Kitchens, Theaters, Amusement Parks, Retail & Department Stores, Shopping Malls, renovation of The Aerospace Corporation buildings C1, A2, A3, A4, and various mechanical replacement projects at A1, A5, and A8. Noted accomplishments new Humanities building at UCR, North Campus chilled water grid study for UCLA to integrate with the South Campus & medical facility cogeneration system, Saint Joseph Medical Center building in Orange, White Memorial Hospital central plant and chilled water grid renovation.

1981 to 1985 – Facility energy coordinator / mechanical engineer at University of California, Riverside, Ca.. Noted accomplishments included lighting retrofits, replacement of steam chillers with electric centrifugal chillers, strategic plan to retrofit chilled water distribution to variable flow chilled water grid, retrofit VFD’s to control pumps and fans, expansion of digital control system to all buildings and central plant, and implementation of integrated planned maintenance work management system (Verle Williams consultant).

Bachelor of Science Degree in Environmental Engineering / Air Conditioning and Refrigeration - California Polytechnic State University, San Luis Obispo, Ca.

1979 to 1981 – Designer, Load calculation/T24 & cost estimator / mechanical engineer at Schlaman’s Air Conditioning and Sheet Metal, Riverside, Ca.

1976 to 1979 – Dana Ice Company, San Luis Obispo, Ca. ice manufacturing, processing, and delivery.

Publications: Chilled Water Grid Design and Operation – 1991; High Performance Air Systems Design - 2017; Solar Air-Conditioning Design - 2017