Post Job Free

Resume

Sign in

Project Manager Quantity Surveyor

Location:
Al Dafna, Qatar
Posted:
June 11, 2023

Contact this candidate

Resume:

Geminiano Albo

Najma, Doha Qatar

Mobile No. +974********

E-Mail Address: adxm3e@r.postjobfree.com

PERSONAL PROFILE

A professionally qualified and hard-working Quantity Surveyor & Electrical Engineer, having work experience in contracting and manufacturing environment and Plant Maintenance Engineer aspects. Well conversant with computer literacy such as Buildsmart Software, AutoCAD, MS Office and Candy System software with 15 years’ work experience as Quantity Surveyor and 4 years as Maintenance Engineer.

WORK EXPERIENCE

BK GULF WLL, DOHA, QATAR

Position: Snr. Quantity Surveyor

Projects:

Data Center 2 Project (QTR 1012) Period: Dec 01, 2022 to present HVAC Enhancement at NMQ Gallery Area (QTR 1005) Period: May 01, 2021 Dec. 30, 2022 Data Center 1 Project (QTR 1001) Period: Sept. 01, 2021 to Sept. 01, 2022 Key Roles and Responsibilities:

Preparation of Sub-Contract Agreement such as Supply Agreement, Labor hire agreement, Technical Service Agreement and Subcontract Agreement minor and major subcontract agreement.

Assessment preparation and certification to all subcontractors’ payment applications manual PC and Online Certificate through Buildsmart.

Preparing Cost versus Allowable and Reporting directly to Project Manager.

Preparation of monthly Payment Application to client/main contractor.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Coordination with Site Engineers/ Supervisors for the necessary cost for abortive works and day works.

Taking off quantities and preparation of measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties

(For price escalation/ claims) of identified possible impacts. Position: Snr. Quantity Surveyor Period: February 01, 2021 to present Project:

Dream Hotel Project (Job 5046)

Key Roles and Responsibilities:

Preparation of Sub-Contract Agreement such as Supply Agreement, Labor hire agreement, Technical Service Agreement and Subcontract Agreement minor and major subcontract agreement.

Assessment preparation and certification to all subcontractors’ payment applications manual PC and Online Certificate through Buildsmart.

Preparing Cost versus Allowable and Reporting directly to Project Manager.

Preparation of monthly Payment Application to client/main contractor.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Coordination with Site Engineers/ Supervisors for the necessary cost for abortive works and day works.

Taking off quantities and preparation of measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties

(For price escalation/ claims) of identified possible impacts. Position: Snr. Quantity Surveyor Period: August 01, 2019 to present Project:

Lusail Palace Package P2 Project (Job 4010)

Key Roles and Responsibilities:

Preparation of Sub-Contract Agreement such as Supply Agreement, Labor hire agreement, Technical Service Agreement and Subcontract Agreement minor and major subcontract agreement.

Assessment preparation and certification to all subcontractors’ payment applications.

Preparing Cost versus Allowable and Reporting directly to Project Manager.

Preparing Bid Tab (Initial and Final).

Preparation of monthly Payment Application to client/main contractor.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Coordination with Site Engineers/ Supervisors for the necessary cost for abortive works and day works.

Taking off quantities and preparation of measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties (For price escalation/ claims) of identified possible impacts.

BK GULF WLL, DOHA, QATAR

Position: Snr. Quantity Surveyor

Project:

National Museum of Qatar Project Package B&C (Job 4854) Period: May 01, 2014 to May 28, 2018 National Museum of Qatar Project Package E2 (Job 4962) Period: Sept. 01, 2017 to Dec. 30, 2022 Key Roles and Responsibilities:

Preparing Contract such as Supply Agreement, Labor hire agreement, Technical Service Agreement and Subcontract Agreement minor and major subcontract agreement.

Assessment preparation and certification to all subcontractors’ payment applications.

Preparing Cost versus Allowable and Reporting directly to Project Manager.

Preparing Bid Tab (Initial and Final).

Preparation of monthly Payment Application to client/main contractor.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Coordination with Site Engineers/ Supervisors for the necessary cost for abortive works and day works.

Taking off quantities and preparation of measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties (For price escalation/ claims) of identified possible impacts.

BK GULF WLL, DOHA, QATAR

Position: MEP Quantity Surveyor Period: Sept. 01, 2012 to Apr. 30, 2014 Project:

College of Media and Communication CMC Project (Job 4855) National Museum of Qatar Project Package B&C (Job 4854) Key Roles and Responsibilities:

Preparing Bid Tab (Initial and Final).

Preparation of monthly Payment Application.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Coordination with Site Engineers/ Supervisors for necessary abortive costs and day works.

Taking off quantities and preparing measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties (For price escalation/ claims) of identified possible impacts.

MACAIR LLC, DUBAI, UAE

Position: MEP Quantity Surveyor Period: June 05, 2011 to May 31, 2012 Project:

Ministry of Finance Extension (C-1337) Project - Abu Dhabi U.A.E, August 2011 to May 31, 2012. Contract sum: AED 40.5 Million (Lamp-sum Contract) Project:

Fit Out works at Department of Economic Development HQ (C- 1349) - Abu Dhabi U.A.E, December 2011 to May 31, 2012.

Contract sum: AED 7.6 Million (Re-Measurable Contract) Project:

Ducab New Building Factory Project - Dubai U.A.E, June 05, 2011 to August 2011. Contract sum: AED 37 Million (Lamp-sum Contract)

Key Roles and Responsibilities:

Preparing Cost versus Allowable and Reporting directly to Project Manager.

Preparation of monthly valuations.

Identifying the possible cost impacts under the given Instruction.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the Instruction and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Identifying overlaps of scope with other Instructions (If any)

Coordination with Site Engineers/ Supervisors for necessary abortive costs and day works.

Taking off quantities and preparing measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates for new materials and even for those materials included in BOQ.

Collecting and storing/updating cost information.

Final documentation/ preparing reports/ submission.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties (For price escalation/ claims) of identified possible impacts.

Monitoring material on site.

Re – Measurements

Taking off Quantities of the relevant revision of drawings and preparing measurement sheets and update Indicative BOQ.

TEO A. KHING DESIGN CONSULTANTS SDN BHD, DUBAI, UAE Position: Quantity Surveyor Period: January 17, 2011 to May 31, 2011 Project:

Nad Al Sheba Dubai Racecourse Meydan Project

Key Roles and Responsibilities:

In charged in handing job as a consultant role post contract stage ie preparing progress claim, variation orders, statement of final account and etc.

Involved in all MEP works in Meydan Projects.

Preparing Purchase Requisition for new works or contracts.

Certifying monthly claim by the contractor base on the submitted invoice with attached supporting documents like RFIA, Demarcation Drawing etc.

Certifying the Final Claim or Final Completion by the contractor base on the Engineering Assessment and PO.

THERMO L.L.C - DUBAI, UAE

Position: MEP Quantity Surveyor Period: June 2008 up to May 2010 Project:

Dubai International Airport Expansion (Phase II) Terminal 3, Concourse 2 & Car Park Project Description:

The multi-billion dollar expansion of the Dubai International Airport was commissioned by the Dubai Civil Aviation to cater to the travel demands of the 21st century. This is the single largest undertaking in the history of the U.A.E. Major MEP installations in this project include Air Handling Units, Fan Coil Units, Glycol Chiller Systems, Sub-stations, Chilled Water Pipes and several Specialist Airport Systems.

Contract sum: AED 1.7 Billion

Key Roles and Responsibilities:

Identifying the possible cost impacts under the given Engineer's Instruction.

Coordination with relevant parties (e.g. Engineering staff) in order to clarify the EI and to get the required information in order to finalize the scope of the variation and for further clarifications as the work proceeds.

Identifying overlaps of scope with other EIs (If any)

Coordination with Site QS/Engineers for necessary abortive costs and day works.

Obtaining the necessary drawings and details by coordinating relevant parties (i.e. Document controllers, Engineers and draughtsman).

Taking off quantities and preparing measurement sheets.

Preparation and pricing of variation claim.

Rate analysis and Building up new rates.

Identifying/ calculation and pricing sundries.

Collecting and storing/updating cost information.

Final documentation/ preparing reports/ submission.

Ensuring all the possible cost impacts are covered in the variation claim and inform the other parties (For price escalation/ claims) of identified possible impacts.

SPI/SEMICON ASIA INC. - FCIE Dasmariňas, Cavite, Philippines Position: Maintenance Engineer Period: July 14, 2004 – March 31, 2008 Key Roles and Responsibilities:

Conduct regular inspection of all fixtures, equipments, machineries, safety devices, etc. on a weekly and monthly basis.

Maintain records of all equipment and machineries (as stated in the masterlist) and sees to it that spare parts availability are maintained.

Maintains, installs operates and repair all plant machineries (production and facility) up to electrical/mechanical standards such as but not limited to the following:

electrical system

mechanical work(related to duties)

plumbing system

air conditioning system

communicating system

fire alarm system

Implement the preventive maintenance and repair schedules of all plants machineries and all related facilities

Conducts regular inspection of the plant equipment, such as, but not limited to power supply, fire alarms and other safety equipment.

Maintain clean, safe and comfortable working environment.

Ensures that all tools and measuring equipment and testers are in good working condition.

“Proactive” response to all repair needs of production and rest of facility.

San Lazaro Project 500MW CCGT) - Siemens, Incorporated – I & S Position: Internship Training Program – ITP Period: November 15, 2001 – March 05, 2002 Key Roles and Responsibilities:

Assigned to work at Electrical Engineering Department for Lighting and Small Power, Telephone, Radio Paging and CCTV System of the Plant.

Passing Basic Quality Assurance Examination

April 04, 2005

Quality Calibration Services Co. – Training

May 20, 2006

ACADEMIC QUALIFICATION

AutoCAD 2007 with color rendering level 1 & 2 Microcadd Technologies Co.,Inc. February 26 2007 – March 19 2007

College

Bachelor of Science in Batangas State University Electrical Engineering (BSEE) Batangas City, Philippines Year 1998 – year 2003

SEMINARS ATTENDED

Training for Buildsmart Software – (February 10, 2018)

Training for Candy System Software – (Sept 10,11 & 12 2015)

Fire Prevention and Safety Consciousness Program – (August 10, 2007)

Electronics – Basic and Advance – (July 15, 2006)

Refrigeration and Air conditioning – (June 03, 2006)

Basic Pneumatics Seminar – (July 05, 2005)

Substation Engineering Seminar – (March 15, 2003) PERSONAL DATA

Age : 43 years old

Sex : Male

Height : 5’ 10”

Weight : 75 kgs.

Complexion : Fair

Date of Birth : April 25, 1980

Place of Birth : Malimatoc I, Mabini Batangas Philippines Citizenship : Filipino

Status : Married

Character Reference

Mr. Paul Kelly

Operations Director

BK Gulf WLL

Mr. Paul Marks

Commercial Manager

BK Gulf WLL

Mr. Seamus Mc Laughlin

Commercial Manager

BK Gulf WLL

Mr. Essam Ismail

Project Manager

BK Gulf WLL



Contact this candidate