AKAGBOSU SIGISMUND .O
SEX: MALE
MARITAL STATUS: SINGLE
DATE OF BIRTH: 31ST MARCH, 1983
STATE OF ORIGIN: EDO
HOMETOWN/L.G.A: AGENEBODE
NATIONALITY: NIGERIAN
CAREER OBJECTIVE:To work in a challenging and dynamic environment where my technical skills will be maximally utilized to contribute to the realization of the vision of the organization.
INSTITUTIONS ATTENDED WTH DATES
1.2007 NNAMDI AZIKWE UNIVERSITY,
AWKA, ANAMBRA STATE.
2.1993-1998 UNIBEN DEMONSTRATION
SECONDARY SCHOOL, BENIN CITY
EDO STATE
PROFESSIONAL/ACADEMIC QUALIFICATION
3.2007 B.ENG
MECHANICAL/
PRODUCTION
SECOND CLASS HONOURS
(LOWER DIVISION)
1.2009 (NYSC) National Youth Service Corp
2.NOV/DEC 1998 WAEC
WORKING EXPERIENCE
1.ASBURY INTL’ LIMITED, (OIL SERVICING COMPANY), PORT HARCOURT.
INDUSTRIAL ATTACHMENT (JAN. 2005 - JUNE 2005)
2. NESTLE NIGERIA PLC-(FOOD AND BEVERAGE COMPANY),
AGBARA, OGUNSTATE
(NYSC)
MAINTENANCE TRAINEE ENGINEER IN CENTRAL MAINTENANCE DEPARTMENT, NOVEMBER 2008 TO 20TH NOVEMBER,2009.
NYSC DISCHARGE CERTIFICATE (20TH OCTOBER 2009)
JOB DESCRIPTION
PREPARATION OF WEEKLY MAINTENANCE SCHEDULE
PRESSURE VESSEL INSTALLATION, REPAIRS/MAINTENANCE
INSULLATION/LAGGING OF STEAM PIPELINES
VARIOUS VALVE INSTALLATION/MAINTENANCE
REVIEW OF SOP (STANDARD OF OPERATION) OF VARIOUS MACHINES
FORKLIFT REPAIRS AND MAINTENANCE
REPAIRS OF LORRIES AND TRUCKS FOR TRANSPORT DEPT
SAFETY TRAINING ON FIRE FIGHTING AND PREVENTION
INSTALLATION OF 2000KVA PERKINS GENERATORS
REPAIR OF WAUKESHA CENTRIFUGAL PUMPS FOR FACTORY COOLING TOWER
FLUID FLOW CALCULATIONS FOR THE INSTALLATION OF 150,000 LITRES STAINLESS STEEL FOR NESTLE WATERS
INSTALLATION/MAINTENANCE OF 125 HORSE POWER INGERSOLL
RAND VACUUM PUMP.
REPLACEMENT AND DESIGN OF PIPE NETWORK SYSTEM FOR STEAM PIPES
REPAIRS OF FERMENTOR MACHINE
INSTALLATION OF VARIOUS VALVES FOR FACTORY STEAM LINE
REFURBISHING OF WORN OUT BROKEN DOWN GEAR DRIVES FOR SOYA BEAN GRINDING MACHINE.
PIPE SELECTION AND REFURBISHING OF PUMPS FOR FACTORY COOLING TOWER.
REPAIRS OF HEATER PUMP FOR OVEN
REPLACEMENT OF LEAKING OVEN SHELVES
REPAIRS OF GEAR DRIVES FOR INDUSTRIAL COOKERS
REPAIRS OF BLOWERS AND AIR COMPRESSORS
REPAIRS OF FAULTY LIFT SYSTEM IN FACTORYBUILDING
REPAIRS OF CENTRIFUGAL PUMPS FOR PASTE STORAGE TANKS.
DESIGN OF CONDENSATE TANK SYSTEMS FOR POSITIVE DISPLACEMENT VACUUM PUMPS.
REPAIRS OF ROTARY VACUUM PUMP.
3) ASBURY INTERNATIONAL LIMITED (OIL SERVICING COMPANY)
PROJECT/COSTING & ESTIMATION ENGINEER FOR ONGOING MAINTENANCE CONTRACT WITH TOTAL (DECEMBER 2009 –FEBRUARY 2012)
JOB DESCRIPTION
OB118-125 WELL HEAD PIPING SOLUTION FOR CORROSION INHIBITOR FOR TOTAL EXPLORATION AND PRODUCTION NIGERIA LIMITED (SITE PROJECT ENGINEER)
PREPARATION OF WORK SCHEDULE
PREPARATION OF WELDING PROCEDURE
PREPARATION OF SCAFFOLDING PROCEDURE
PREPARATION OF HSE PLAN FOR VARIOUS PROJECTS
SUPERVISION OF PIPE WELDING (GTAW,SMAW,ETC)
SUPERVISION OF ENGINEERING PROJECTS AND CONSTRUCTION
REPAIRS OF MACK TRUCKS/OVERHAULING OF ENGINES AND FORK LIFTS
REPAIRS OF BRAKE SYSTEM OF TRUCKS SUCH AS MAN DIESEL
CHANGING OF GASKET AND RADIATOR OF MACK TRUCKS
CORROSION INHIBITOR INJECTION PROJECT AT OBAGI FOR TOTAL
INSTALLATION OF ADDITIONAL ACCESS LADDER ON AMP2 TOTE TANK PLATFORM FOR TOTAL FINA ELF
JSA (JOB SAFETY ANALYSIS PREPARATION FOR ONGOING PROJECTS
PRE-FABRICATION OF SPOOLS IN ACCORDANCE WITH ISOMETRIC DRAWINGS
INSTALLATION OF COOLERS ON 4 BY 9BAR COMPRESSOR LUBEOIL SYSTEM AND REDUCTION OF NOISE LEVEL FOR TOTAL
GOOD INTERPRETATION AND IMPLEMENTATION OF P AND ID.
PREPARATION OF DAILY PROGRESS REPORT FOR WELDING FABRICATION
MAINTENANCE OF HEAVY DUTY DIESEL ENGINES
REVIEW OF PRICES FOR MATERIALS/QUANTITIES
INSTALLATION OF 200KVA DIESEL GENERATOR
SUPERVISION OF VARIOUS PROJECTS AT BONNY FOR TOTAL FINA ELF (ONGOING)
PIPE DESIGN AND FABRICATION OF DIFFERENT SIZES WITH FLANGES
CATHODIC PROTECTION OF PIPES FOR EXXON MOBIL AT EKET ONGOING
4) ENER-GAS INTERNATIONAL LIMITED-(OIL AND GAS COMPANY)- PROCESS/PROJECTENGINEER) FOR OANDO CNG MOTHER STATION GAS CONSTRUCTION PROJECT AT ILLASAMAJA,LAGOS STATE(MARCH2012- NOV 2014)
INSTALLATION OF THREE CNG COMPRESSORS
INSTALLATION OF PRMS(PRESSURE REGULATING METERING SYSTEM)
INSTALLATION OF COOLERS AND HEAT EXCHANGERS
INSTALLATION OF CHILLERS
INSTALLATION OF CNG DISPENSERS AND PIPING HOOK –UPS
INSTALLATION OF SEPARATORS/PIPING/VALVES AND FITTINGS
SUPERVISION OF PIPE WELDING WORKS TO COMPRESSORS AND COOLERS
INSTALLATION OF 20MM-38MM PIPING/ HEAT EXCHANGERS,/CASCADE UNIT/CHILLERS THREADING
INSTALLATION OF GAS GENERATORS
INTERPRETATION OF P AND ID’S IN ACCORDANCE TO SPECIFICATIONS
INVENTORY OF ALL PIPES AND MATERIALS BROUGHT IN TO SITE
INSTALLATION OF PRESSURE RELIEF VALVES/CALIBRATION
HYDROTESTING OF ALL PIPING SPOOLS FOR 24HOURS USING HYDROTEST MACHINE
ENSURE THAT ALL PIPES,FITTINGS ARE WELDED ACCORDING TO ISOMETRIC DRAWINGS
INSTALLATION OF COOLING FANS ON GAS COMPRESSORS
INSTALLATION OF AIR COMPRESSOR AND PIPING HOOKUPS
INSTALLATION OF BALL,,GATE,GLOBE AND BUTTERFLY VALVES TO VARIOUS PIPE SIZES
LIASING WITH ALL SUB-CONTRACTORS ON SITE AND PROJECT SUPERVISION AND MONITORING
DAILY PROGRESS REPORT ON JOB PROGRESS
FINDING MORE ECONOMIC AND EQUIPMENT SOLUTIONS FOR CNG GAS STATION
CALIBRATION OF CNG DISPENSERS WITH EXPATRIATE TEAM (FORNOVO GAS ITALY)
5)BAY MATRIX LIMITED (OIL SERVICING COMPANY-PROJECT/MAINTENANCE SUPERVISOR (NOV 2014 –MARCH 2017)
FABRICATION OF 40 METAL RACKS FORSOIL SAMPLE BOXES FOR GSRWAREHOUSE (TOTAL)
MAINTENANCE OF EQUIPMENT SUCH AS PUMPS,GENERATORS,TOWER LIGHTS,DIESEL WELDING MACHINES AND FACILITY MAINTENANCE FOR OFFICE BUILDING
MAINTENANCE OF ALL EQUIPMENT
GOOD INTERPRETATION OF PROCESS AND INSTRUMENTATION DIAGRAMS FOR PIPE LINE CONSTRUCTION,PROCESS AND STRUCTURAL WELDING FABRICATION
PROFICIENT IN CALIBRATION,REPAIRS AND RE-CERTIFICATION OF PROCESS SAFETY VALVES
6) ENIKKOM CONSTRUCTION LIMITED (OIL SERVICING COMPANY-MAINTENANCE ENGINEER (NOV 2017 -NOV 2021
COORDINATING AND SUPERVISION OF MAINTENANCE OF HORIZONTAL DIRECTIONAL DRILLING RIGS AND ALL OTHER EQUIPMENT SUCH AS EXCAVATORS (CAT),GENERATORS,CENTRIFUGAL PUMPS
PREPARATION OF MAINTENANCE CHECK LIST FOR ALL EQUIPMENT
SUPERVISION OF PIPELINE/STRUCTURAL WELDING WORKS
REPAIRS OF ALL EQUIPMENT FOR NNPC HDD PROJECT
REPAIRS OF ALL EQUIPMENT FOR CHEVRON HDD PIPELINE PROJECT
REPAIRS OF ALL EQUIPMENT FOR DANGOTE HDD PIPELINE PROJECT
COORDINATION AND SUPERVISION OF ALL TECHNICIANS ON SITE
REPORTING OF EQUIPMENT FAULTS AND PREPARATION OF MAINTENANCE BUDGET
INTERPRETATION OF MACHINE DRAWINGS FOR THE SOURCING OF PART NUMBERS AND SPARES
INTERPRETATION OF P AND ID DRAWINGS
REPAIRS OF MACK TRUCKS AND TOYOTA HILUX AND TOYOTA BUSES
REPAIRS OF MUD RECYCLING EQUIPMENT
REPAIR OF JOHN DEERE PUMPS
REPAIR OFVARIOUS ROTATING EQUIPMENT
GOOD INTERPRETATION OF PROCESS AND INSTRUMENTATION DIAGRAMS FOR PIPE LINE CONSTRUCTION,PROCESS AND STRUCTURAL WELDING FABRICATION
PROFICIENT IN CALIBRATION,REPAIRS AND RE-CERTIFICATION OF PROCESS SAFETY VALVES
HOBBIES
FOOTBALL, TABLE-TENNIS, MUSIC AND READING
PROFESSIONAL MEMBERSHIP: Member, IMechE (Institution of Mechanical Engineers,United Kingdom,Membership no.80094139).
REFERENCES
1.PROFESSOR E.I.E OFODILE
DEAN FACULTY OF ENGINEERING,
NNAMDI AZIKIWEUNIVERSITY,
P.M.B 5025,
AWKA, ANAMBRA STATE.
TEL: 080********
2 ENGR.O.S OLATUNJI
CENTRAL MAINTENANCE ENGINEERING DEPARTMENT,MAINTENANCE SUPERVISOR
NESTLE NIGERIA PLC,KILOMETER 1,
AGBARA,
OGUN STATE.
TEL:080********
Phone: 080********, 070********
E-Mail: *************@*****.***
*************@*******.***
No.20,RUMUIBEKWE ESTATE,PORTHARCOURT,
RIVERS STATE