Post Job Free
Sign in

Warehouse Manager Operative

Location:
Germany
Salary:
4000
Posted:
July 11, 2023

Contact this candidate

Resume:

GORKHA BAHADUR LIMBU

Mobile:+971*********

Email: adx8gh@r.postjobfree.com

Objective:

Seeking a challenging environment that encourages creativity and leading capacity that provides exposure to utilize my skills and ability, looking forward for a position as an Electrical Engineer thereby serving to my employer as good as they want.

Educational Qualification:

DEGREE

UNIV. / INSTITUTE

YEAR

PERCENTAGE S.S.C

Shree navin shiksha vidhyalay, Nepal.

2006

76

ITI (Electrician)

Tribhuvan university

2008

65

Summary of Qualification

Dedicated to professional development and achievement

Self-disciplined and committed to learning

Ability to work with diverse population

Good Written and Oral communication skills

Computer Literate

May presides meeting and preparing meeting minus

Experience Summary:

Total Work experience -12years & 2 Months.

L&T Electrical & Automation Saudi Arabia Company LTD

From Jan 2012 to 2019 january

“Electrical Supervisor”

Planning and manpower controlling to execute the power system of Low current lighting in commercial and warehouse as on time. Co-ordination with Client and periodic report to Project Engineer.

Berkeley Services UAE (Dubai) from sep 2008 to sep 2011:

“Electrical Supervisor”

Involved the maintenance activities like High Voltage Breakers, A/C&D/C control panels operation and maintenance. Erection and Commissioning the Transformers feeders, DOL starter and Motor Feeders.

Himal Iron & Steel (P) Ltd.

“Electrical Technician”

Involved the maintenance activities like High Voltage Breakers, A/C&D/C control panels operation and maintenance. Erection and Commissioning the Transformers feeders, DOL starter and Motor Feeders.

ALINARA ALL YUROPIA SENETARY COMPANY UAE {DUBAI} FROM OCTOVER 18/2021 TEEL NOW –senior electrician mentinence

SUMMARY OF SKILLS

Supervised and over all see the electrical work implementation of Sub-Contractors for the different project.

Interface with the other disciplines and coordinate with the electrical design to fit the project requirements and priorities.

Correspond with the client representatives for work permits needed in the site.

Maintained effectively and report about discussed modifications of site issues, investigate problems and recommended solution.

Project execution with the coordination of subcontractors.

Lead the teams for line and loop checking of laid cables including meggering testing of LV and MV cables.

Manage all work orders given by five Electrical managers with different areas and system of responsibility.

Installation, Pre-commissioning & maintenance of Electrical Substation.

Work under the deadline and pressure hand to hand with various vendors.

To liaise with the HSE and/or Quality Department for the preparation and publishing of project safety and or quality manuals to ensure HSE standards are met.

Electrical heat tracing installation of self regulating, MIQ coils & thermostat.

Heating elements & I.R testing conducting as per the site requirement.

Energization of the heat tracing circuits as per site process condition.

Raise the RFC & RFSU walk down notification for the PMC & Asset team.

Alarm Simulation of the thermostat from the field side to heat tracing

Monitoring panel.

SCM document preparation all related to Electrical heat tracing.

Study the drawing and make the installation as per the standard

and specification.

Planning and making the work schedule, meeting the Target at

the specified duration.

Weekly reporting the work progress and planning with management.

Supervise the installation of Power, Low current & lighting system

for commercial & ware house.

Accompany and guide consultant in inspections.

Installation of control panels, Switch gears and three phase motors.

Wiring terminating and gladding of panel board

Laying and termination various size of the cable up to 630 mm2 .

Types of cables are SAS, SACS, BMS, PAS, Fire Alarm, RADIO, Tele Communication, MATV, Data, CCTV, Lighting and Power.

Installation of Cable Trays, G.I Trucking with fabrication.

Highlighting the drawing and updating the works executed.

Maintaining good safely practices in work prepare cost estimate of material take off including purchasing of materials needed to complete the project.

Attend weekly coordination meeting, coordinating with main contractor, consultant, QA/QC, Project Electrical Engineer as well regarding the project requirements.

Motivate and train junior members of staff, undertake other related duties and responsibilities as requested.

Accompany of guide consultant in inspections

Preparations of as Built.

I have worked in maintenance department. Electrical control panel board of blow, carding drawing, spinning, cone winding of electrical erection in all sequences.

Operation & maintenance of AC/DC power source &troubleshooting.

Calibration of all the above test equipments with the standard measurements.

Preparing the PCB layout and their appropriate circuit components

Testing the switch board, breakers, high voltage and control circuit.

Erection and commissioning the transformer feeders and DOL starter panel, motor feeder.

Relay setting and be done according to the site load conditions.

Knowledge of electrical/mechanical interlocking system between the feeders.

Modification of control circuits like relay, contactor, breaker, control wiring etc.

Responsibilities:

Planning execution, erection, commissioning, of LT/HT Electrical system in captive Bio-mass based power plant and large industrial projects.

Erection & commissioning of LV/MV switch gear 33/11Kv power transformer.

Knowledge of subcontracting cost effective works in project execution

Erection & commissioning of 33/11Kv line transformer C&R panels, 11KV 6.5MW generator C &R panel.

Knowledge of interlocking system between the switchgears and their C&R panels.

Arranging the third party testing & commissioning of H.T cables, relays, switchgears, & transformers.

Project: Petro Rabigh

Client : GS Construction for L&T Electrical & Automation Saudi Arabia Company Ltd

Responsible for all site electrical/ instrument works in plants such as; installations/ erection activities.

Supervised electrical installations such as cable laying, cable trays, glanding and termination, panel boards HV and MV switchgears, bus ducts, power transformers, HV and MV terminations, transformer oil flushing and necessary – electric tests, high pot testing and merging, MV and LV motor control centers, 35KV and 10KV substation.

Responsible for the executions of subcontractor electrical services, quality subcontractor performance and construction cost.

Evaluated subcontractor electrical service execution for compliance to contract, design data, and schedule cost budgets and quality performance.

Monitored the subcontractor implementation of safety orientation, toolbox meeting and provide additional facts for improvement.

Coordinated with the warehouse personnel any information on material requests, material shortages and materials to be used.

Monitoring and supervision the substation for the execution of works for some equipment and termination in the most workmanship manner.

Project: Dubai waterfront projects

Client : Berkeley Services UAE (Dubai)

Responsible for all site electrical/ instrument works in plants such as; installations/erection activities.

Supervised all electrical work being per formed on site and interpret technical details on plans and specifications as deem necessary to ensure good workmanship and quality plus safety in carrying out the aforementioned works.

Supervised electrical installation such as; cable lying, glanding and terminations, panel boards switchgear, motor control center, MV/LV sub-station and other MV/LV voltage installation, control cabins, compressors, ups system, fire and gas system, small power and lighting system, cathodic protection, earthing system, lightning protection and other electrical works.

Project: Himal Iron & Steel (P) Ltd.

Client : Siva Consultant Pvt.Ltd

To perform external loop check of the motor control system (MCC) and LV switchgear prior for functional test as per vendor instruction.

Perform simulation test/ functional test of the control system of LV switchgear for local operation and remote operation with vendor supervision.

To perform coupled and uncoupled test of the HV motor and LV motor in a safe and efficient manner. In testing the insulation resistance of the motor and winding resistance.

SAFETY COURSE

Incident and Injury Free Supervisor Skills, Electrical Safety Rules, Quality Control, Introduction & HSSE Leadership Management, Lifting and Rigging Awareness, Non Destructive Examination, Hydrogen Sulphide Awareness, Hazard Identification, Hand Safety Manual Handling, Confine Space Entry, Emergency Response

Personal Details

Name : gorkha bahadur limbu

Father Name : aash bahadur limbu

Date of Birth : 16-03-1988

Sex : Male

Martial Status : Married

Passport no : 08668668

Permanent Address : tehrathum panchakanya 8 wasmeri.

Phone: +971*********

DECLARATION

I do hereby confirm that the information furnished above is true to the best of my knowledge and belief.

Place:

Date: (gorkha bahadur limbu



Contact this candidate