Rodolfo M Orta Jr.
***** ***** **, *******, ** **429
********@*****.*** ● 281-***-****
Objective:
To obtain a position in supervision with a company that provides opportunities for advancement and learning based on strong drafting skills and job performance.
Skills:
AutoCAD 2004/2006/2007/2008/2010/2015/2018
Proficient in AutoCAD Civil 3D, Autodesk Inventor 10, Autodesk Viz, Adobe Photoshop, Architectural Desktop 2007, Adobe Illustrator
Computer-aided drafting with conventional methods of graphic communication to solve drafting and basic design-related problems
Ability to create a variety of drawings of various sizes on different drawing media
Adept at manual, 2D, 3D, civil, mechanical and architectural drafting
Read and interpret blueprints and schematics
Excellent oral and written communication skills
Fast learner; always willing to master new information
Excellent with Windows computer applications
Microsoft Word, Excel, PowerPoint, Access
Speak and write English
Solid Works
Education:
Associate of Science Degree in Computer Drafting and Design
Graduation Date: June 2014
GPA 3.36
Experience:
Buckeye Partners LP
Drafter/ Data entry analyst Nov. 2020- May 2023
Utilizing AutoCAD, Cadworx, and Microsoft Excel to Catalog P&IDs and Plot Plans from various sites/ stations and revise per field markups. P&ID’s ranged from having equipment such as Large Tanks, Vaporizers, Pumps, PIG Launchers and many different types of equipment. Group collaborations with different drafting departments (i.e. electrical, structural, etc.) to ensure that everything flows accordingly. Once P&IDs are revised, they are then applied to SharePoint for network archives.
Phillips 66
Drafter Dec. 2019- June 2020
Receive redlines, MOC’s, IFCs, and as-built P&IDs and Plot Plans from various Phillips 66 refineries/ pump stations and revise per field markups. Once P&IDs and Plot Plans are revised, they are then applied to SharePoint and also Falcon Software for network archives.
TC Energy
Senior CAD/Field Designer Sept. 2017- Oct. 2019
Traveling to various compressor stations on TC Energy pipelines to field sketch new As-Built P&IDs. Once field sketches are complete, fly back to Houston office to utilize AutoCAD to create As-built P&IDs for compressor station documentation.
PinnacleArt
Field Drafter March 2016- Sept. 2017
Utilize P&ID’s to locate pipe. Sketch targeted pipe and route. Sketch all equipment throughout refinery that is on spreadsheet.
Turner Industries Oct. 2015- Nov. 2015
Class A Boilermaker
-
CB&I Sept. 2015- Oct. 2015
Field Engineer
Utilize Autodesk inventor to create nuclear parts to be manufactured. Verify that part is correct in all aspects for proper assembly of nuclear reactor. Utilize Documentum to be sure every aspect of parts are created and accounted for.
CenterPoint Energy, Houston, TX Dec. 2014 – Sept. 2015
Piping Designer
Create and modify gas pipeline drawings for residential and commercial properties. Utilizing Microstation and Designer Express to fulfill desired pipe layout. Assisting the engineers with specific projects.
Victory Tech ED (Contract work), Houston, TX Feb 2012 – October 2015
Freelance Drafter
Create essential drawings for projects before deadlines. Utilized Microstation, Civil 2D & 3D, Architectural, Auto CAD, Revit creating curtain walls for specific, and Inventor and PLSCADD to revise provided markup drawings from engineers.
Validated pipes for pipeline and verified sections are in accurate location.
CDI Corps, Houston, TX Aug. 2013- April 2014
GIS Analyst
Crosschecking
M.A.O.P. validations of pipeline by analyzing pipeline features from field books, alignment sheets, and drawings to verify pipe specifications according to PHMSA
(Pipeline and Hazardous Materials Safety Administration) requirements.
LWL Inc., Baytown, TX July 2013 - Aug. 2013
Helper Sept. 2012-Feb. 2013
Assisted pipefitters and welders with cutting, grinding, and beveling pipes.
Phoenix Services, La Porte, TX Feb 2013 - May 2013
Boilermaker
Bolted up flanges, torqued and re-tubed exchangers.
Wyatt Field Services, West Lake, LA Jan 2012 - April 2012
Boilermaker/Tower hand
Bolted up flanges, installed and removed blinds. Installed packing into tower and conducted inventory for tower.
Mundy Construction, Kingsville, TX March 2011 - Dec 2011
Fire watch/ Tool Room Attendant/ Expediter
Watched for fires, sparks, and other fire sources. Builder spark containment boxes. Checked out tools in the morning. Expedited materials to workers.
References:
David Prugar- 832-***-****
Juan Paz- 281-***-****
Creel- 325-***-****