Post Job Free

Resume

Sign in

Fiber Optic splicer

Location:
Angeles, Philippines
Posted:
July 02, 2023

Contact this candidate

Resume:

PERSONAL DATA EDUCATIONAL BACKGROUND

Age: ** yrs. Old

Date of Birth: April 6, 1967

Place of Birth: Manila

Civil Status: Married

Citizenship: Filipino

Religion: Catholic

Height: 5’5

Weight: 130 lbs.

Elementary: Sta. Ana Elementary

school 1979

High School: Francisco Villa Roman

Foundation College 1984

College: A.C.E Computer School

1990

SKILLS AND LANGUAGES

Driving

Fiber Optic Splicing

Oral and Written Communication

WORK EXPERIENCED IN SUBCONTRACTING

(Duties and Responsibilities)

Position: Fiber Optic Splicer

Employer First Multigreen Power

Date: Jan.5,2015 - Present

Project: OCEANA GOLD MINING

PLDT Skyway Sucat Alabang

Feb.12,2014

Malacanan Manila

GLOBE TELECOM project under CKPT Telecom.

Dec.6,2015

PLDT project Masbate to Roxas city under ground Cable Sept.9,2010- Feb.10,2011 under GNEXT Telecom.

AMADOR R. PEREZ

Contact No. +63-956-***-**** +63-923-***-**** 52-7 Cruz Ave. Don Bonifacio

Balibago, Angeles City

Email address: adx1tf@r.postjobfree.com

BS POWERTECH

Globe Telecom and Ericssson Project

Leyte Ormoc City to Tacloban micro fiber

Sept.2009

ECCO INC.

DIGITEL Cabanatuan City

Jan.2007 – Aug.2008

TAERYUNG Telecom.

DIGITEL Project Redundancy Laguna City

Jan.15,2007-May.252007

Preparation of installed Fiber Optic cable,OPGW,Figure8,round and all type of foc cable,perform splicing Using Sumitomo type 39,fusion Machine conduct testing using VFL fault locator,OTDR,Power meter Install closure,and Patch Panel ODF.termination.perform cutover,trouble shooting,stripping,cleaving,splicing, Recoating and dressing of all mechanical assembly .can drive 4 wheeled vehicles.do emergency restoration like burn cable,cut cable,can do cable laying pole dressing hardware.can climb and do underground works. Position: Cable Technician 2

Employer: Digitel Telecommunication Company

Date: July 2, 1999 – December 29,2006

Duties and responsibilities:

- Fiber Optic Splicing FTTH overhead and underground,on,project.

- Do Rehabilitation and repair work on installed FOC Cable

- Performs cable jointing, splicing on all O.S.P project like copper & fiber optic like, OPGW, airblown cable,and all kind of fiber optic single mode and multi mode.

- Perform termination on ODF, termination including patch panel

- Performs Testing using OTDR Fuult Locator VFL & Power Meter in Aerial & underground.

- Cable laying primary and secondary for all special project or cable extension

- Termination of cabinet, MDF and cable vault, test fault locates and repair damaged cable by the use of MINI OTDR .FUJIKURA 50S,60S,,SOMITOMO T39, PITEL,JILONG, Fusion Machine and other testing instrument

- Repair subscriber telephone Line.Cutover working FOC

- Repair work and locate fault on installed CCTV and FTTH Position: Cable Splicer Foreman

Employer: NESIC TELECOM

Date: January 15,1997 – January 20,1998

Project: NX1,NX2, and DIGITEL PROJECT

Duties and responsibilities:

- Supervision of aerial copper splicing and cable laying.

- Making progress report

- Handle works on aerial and underground cable, manhole,MDF, and cable vault.

- Inspect manhole and test cable conduit from defects, damage s and fault in construction. Plan reading.

Position: CABLE SPLICER

Employer: ALCATEL PHIL’S

Date: July 24,1995 – January 1,1997

Project: WORLD BANK P.L.D.T EXPANSION PROGRAM ZERO BACKLOG

-Works underground and aerial cable splicing of copper cable

-Pole Dressing, Cable laying and assist pole erection.

-Performs partial acceptance and final test (PHYSICAL/ELECTRICAL).

-Making Progress report.

SEMINARS AND TRAINING ATTENDED

FUJIKURA ASIA LTD.

Fiber Optic Cable Fusion Splicing Machine Training December 10,1999(DIGITEL) Roces Ave., Quezon City

DIGITEL SERVICE QUOTION 1

January 10, 2001 (Marilao Exchange) Bulacan

DIGITEL BASIC OUTSIDE PLANT

January 10-14,2000 (marilao exchange) Bulacan

(PLP) PREFORMED LINE PRODUCTS

Orientation of Fiber Optic and copper closure and other hardware products forbes park Polo club

March 16,2001

DIGITEL MEASURING TECHNIQUE’S AND CABLE FAULT LOCATION March 20-24,2000

Marilao Exchange

3M TELECOM SYSTEM DIVISION

Outside Plant Cable Fault Locating and tasting using dynatel 965 DSP March 21-14,2001 (Marilao exchange)Bulacan

References:

Name: Mr. Manny Hippe

Company:

Position: Project Manager

Contact #: 091********

Name: Manny Balcita

Company: Free lance

Position: Fusion machine Technician

Contact #: 090********

FIBER AND ANDO/MINI OTDR

March 21-23,2001 (Marilao exchange)Bulacan

Fiber optic splicing

Feb 20-22,2002 (Marilao Exchange)

COSTUMER SERVICE MANAGEMENT SEMINAR

August 8, 2002 Malolos Report Club Royal

ACESS NETWORK OPERATION WORKSHOP

Feb.19-21,2003



Contact this candidate