Jeremy Wayne Wiggins

Stockton, AL *****

Education

Alabama Southern Community College, Associates Degree, Monroeville, AL.

• Business Degree, Business Administration, Management and Operations (2001)

Accomplishments and Career Highlights

• 2012 part of the rebuild of the fastest and largest recycle paper machine in North America.

Producing over a mile of paper a minute at the Green Pac mill in Niagara Falls, NY.

• Part of management team that overseen the 3000 truckloads of concrete that poured the

foundation for this $460 million Green Pac Project.

• Led a team of construction managers with the building of the new state of the art 108-

million-dollar Tissue Converting Line at the Resolute Forest Products Calhoun, Tennessee

mill.

• Led a crew of 48 on the CF Industries 2-Billion-dollar Nitrogen Expansion in Sergeant Bluff, Iowa.

Qualifications and Skills

• Concrete

• Infrastructure

• Mechanical

• Piping

• Welding and Fabrication

• Navis Works

• Microsoft

Professional Experience

Ark Fabricators

Project Manager

November 2021- April 2022

SouthEast, U.S.

●Worked with business development trying to expand throughout the southeast United States.

●Overseen all Mechanical and Piping on Capital Projects side.

●Made sure quotes were completed and turned into client on or before deadline.

●Managed all crews on Capital Projects side striving zero accidents while maintaining a high quality of work for various clients.

Yonkers Industries

Construction Manager

March 2021-November 2021

Ashland, Va (Resolute)

●Overseen all construction on paper machine.

●Managed all contractors on a daily basis. (approved all JSA’S, Lift plans and any and all excavation permits.)

●Worked hand and hand with the engineers with the demolition and rebuild of plant.

●Worked with contractors and client to maintain a safe and friendly environment to work in.

Experis Manpower

Project Construction Manager,

February 2019- December 2020

Mc Comb, MS. (Weyerhaeuser)

●Coordinated the complete build of the 12” HSS Gang and the Green Chip Blower Project

●Acted as the owner’s rep while managing the oversight of project

●Managed all the sub-contractors daily.

●Overseen the build of concrete foundations and the construction of an 18’ retaining wall

made of 11,000 cubic feet of concrete.

●Zero Lost time and zero recordables for 8 months

●Maintained a healthy line of communication with management and contractors.

Day and Zimmerman

Construction & Project Manager

June 2017-January 2019 Ghent, KY. (LG&E)

●Directed the demolition, fabrication, and installation of gas piping on Unit#1.

●Responsible for maintaining the correct heat stress all on all chrome piping and valves.

●Overseen the demolition and install of all corner tubes and setting the wall blowers in correct

position.

●Led weekly safety audits recognizing and making all aware of the dangers that existed. This

resulted in 72% less first aids and documented accidents.

Jedson Engineering

Construction Manager

July 2016-April 2017

Calhoun, TN. (Resolute)

●Directed all sub-contractors daily with the building of converting lines.

●Overseen al civil work for the foundation of converting lines.

●Responsible for coordinating all equipment testing for commissioning..

Performance Contractors

Construction Coordinator

May 2014-June 2016

Sioux City, IA. (CF Industries)

●Coordinated and supervised multiple crews with the building of the Ammonia Area 1020

●Responsible for identifying the correct locations of heavy wall hangers, spring cans, and pipe

supports.

●Directed two crews that made all modifications to new installed piping.

●Responsible for making sure that the correct heat stress procedure was being followed at

each welded joint. (Carbon, Chrome & Stainless)

W E Williams Consulting

Construction Manager

March 2012-April 2014

Niagara Falls, NY. (GreenPac)

●Overseen 35,000 cubic yards of concrete for paper machine foundation.

●Coordinated multiple crews with the building of the largest and fastest paper machine in

North America producing over a mile of recycled paper a minute.

●Coordinated 14 subcontractors daily with the building of this state-of-the-art paper machine.

●Helped with the commissioning and testing on paper machine.

References:

Shane Garrett-904-***-****

Doug Davis-251-***-****

Donald Tolbert-1-804-***-****

John Patterson- 256-***-****



Contact this candidate