Jeremy Wayne Wiggins
Stockton, AL *****
Education
Alabama Southern Community College, Associates Degree, Monroeville, AL.
• Business Degree, Business Administration, Management and Operations (2001)
Accomplishments and Career Highlights
• 2012 part of the rebuild of the fastest and largest recycle paper machine in North America.
Producing over a mile of paper a minute at the Green Pac mill in Niagara Falls, NY.
• Part of management team that overseen the 3000 truckloads of concrete that poured the
foundation for this $460 million Green Pac Project.
• Led a team of construction managers with the building of the new state of the art 108-
million-dollar Tissue Converting Line at the Resolute Forest Products Calhoun, Tennessee
mill.
• Led a crew of 48 on the CF Industries 2-Billion-dollar Nitrogen Expansion in Sergeant Bluff, Iowa.
Qualifications and Skills
• Concrete
• Infrastructure
• Mechanical
• Piping
• Welding and Fabrication
• Navis Works
• Microsoft
Professional Experience
Ark Fabricators
Project Manager
November 2021- April 2022
SouthEast, U.S.
●Worked with business development trying to expand throughout the southeast United States.
●Overseen all Mechanical and Piping on Capital Projects side.
●Made sure quotes were completed and turned into client on or before deadline.
●Managed all crews on Capital Projects side striving zero accidents while maintaining a high quality of work for various clients.
Yonkers Industries
Construction Manager
March 2021-November 2021
Ashland, Va (Resolute)
●Overseen all construction on paper machine.
●Managed all contractors on a daily basis. (approved all JSA’S, Lift plans and any and all excavation permits.)
●Worked hand and hand with the engineers with the demolition and rebuild of plant.
●Worked with contractors and client to maintain a safe and friendly environment to work in.
Experis Manpower
Project Construction Manager,
February 2019- December 2020
Mc Comb, MS. (Weyerhaeuser)
●Coordinated the complete build of the 12” HSS Gang and the Green Chip Blower Project
●Acted as the owner’s rep while managing the oversight of project
●Managed all the sub-contractors daily.
●Overseen the build of concrete foundations and the construction of an 18’ retaining wall
made of 11,000 cubic feet of concrete.
●Zero Lost time and zero recordables for 8 months
●Maintained a healthy line of communication with management and contractors.
Day and Zimmerman
Construction & Project Manager
June 2017-January 2019 Ghent, KY. (LG&E)
●Directed the demolition, fabrication, and installation of gas piping on Unit#1.
●Responsible for maintaining the correct heat stress all on all chrome piping and valves.
●Overseen the demolition and install of all corner tubes and setting the wall blowers in correct
position.
●Led weekly safety audits recognizing and making all aware of the dangers that existed. This
resulted in 72% less first aids and documented accidents.
Jedson Engineering
Construction Manager
July 2016-April 2017
Calhoun, TN. (Resolute)
●Directed all sub-contractors daily with the building of converting lines.
●Overseen al civil work for the foundation of converting lines.
●Responsible for coordinating all equipment testing for commissioning..
Performance Contractors
Construction Coordinator
May 2014-June 2016
Sioux City, IA. (CF Industries)
●Coordinated and supervised multiple crews with the building of the Ammonia Area 1020
●Responsible for identifying the correct locations of heavy wall hangers, spring cans, and pipe
supports.
●Directed two crews that made all modifications to new installed piping.
●Responsible for making sure that the correct heat stress procedure was being followed at
each welded joint. (Carbon, Chrome & Stainless)
W E Williams Consulting
Construction Manager
March 2012-April 2014
Niagara Falls, NY. (GreenPac)
●Overseen 35,000 cubic yards of concrete for paper machine foundation.
●Coordinated multiple crews with the building of the largest and fastest paper machine in
North America producing over a mile of recycled paper a minute.
●Coordinated 14 subcontractors daily with the building of this state-of-the-art paper machine.
●Helped with the commissioning and testing on paper machine.
References:
Shane Garrett-904-***-****
Doug Davis-251-***-****
Donald Tolbert-1-804-***-****
John Patterson- 256-***-****