ERWIN BAYLOSIS ANTONIO
Sta. Filomena, Alegria, Cebu
Email add:************@*****.***
Skype Name:live: junebaylosis
Skype Profile: Erwin win
Contact # 093********
POSITION DESIRED
DISTRIBUTION LINEMAN
SUMMARY
= Lineman with more than 10 years / skilled in distribution maintenance and constructions
Like maintenance repair of overhead lines HT or LV 13.2 KV,13.8 KV, and 33 KV. lines. To
Construct new distribution lines even 3 phase or single phase.
= Kowledge in Tower correction and inspection
= Knowledge in house wiring installation and maintenance
= NC 2 EIM Electrical Installation and Maintenance Certificate on 2018
= Install house and building wiring connections .
EXPERIENCES
= YEAR 2018 TO SEPTEMBER, 2020 worked as a private electrician, to install house wiring
connection, installed lightings like pin lights, strip lights, chandelier, switches and outlets.
- Installed service entrance . meter base, breakers, panel boards,ground rods, pvc- pipings,
RSC, entrance cup, erecting service pole, service drop wire.
= OCTOBER 1, 2020 to MARCH 31,2022 ( 1 YEAR AND 5 MONTHS ) NGCP LINEMAN TOWER INSPECTOR
- Responsible to climb and inspect the new erecting tower made by the constructor
- Make a report of every tower situation if the tower parts like lattices and bolts was tightened
= APRIL 2022 TO PRESENT, WORK AS PRIVATE ELECTRICIAN AGAIN.
= NOVEMBER 6, 2013 TO NOVEMBER 6, 2017 (4 YEARS) SAUDI ELECTRICITY COMPANY
LINEMAN MAINTENANCE AND EMERGENCY RESPONDER
- Responsible for assisting the constructor crew to their daily assignment area
- Call the main operator to open the power line and close after work
- Changing rotten poles, transformer replacement, cross arm replacement, insulator replacement
- Line construction LV and HT
- Responsible for line trouble shooting during tripping, changing burned meter, trouble shoot
Low voltage supply for household or village
- Changing busted transformer and accessories
- Operate line switch, cut- outs, RMU, oil switch
- Install pole mounted transformers and ground mounted transformers
- Participate in corrective and preventive maintenance
= FEB.16, 2002 TO OCTOBER 31,2013 ( 11 . 8 YEARS ) CEBU 1 ELETRICTRIC COOPERATIVE INC.
BITOON, DUMANJUG, CEBU
DISTRIBUTION LINEMAN CONSTRUCTION AND MAINTENANCE
: Line construction – Preliminary and final survey, line clearing, hole digging, pole hauling manually and by truck, pole erection, pole dressing, pole anchoring, stringing and
Tensioning.
: MAINTENANCE – Line trouble shooting, pole replacement, cross arm replacement, insulator
Replacement, transformer replacement, installation of cut-outs, metering
Replacement of busted transformers and accessories, condition monitoring
And involvement in maintenance in maintenance planning.
HIGH LIGHTS AND ACHIEVEMENTS
PHILIPPINES : Trained for almost 2 months for basic lineman training course
: To construct overhead lines and maintain the area
: Participate repairing overhead lines nearby towns damaged by typhoons
SAUDI ELECTRIC COMPANY : repair all old overhead lines to underground lines
: Emergency response of member consumers complaint
NATIONAL GRID CORPORATION OF THE PHILIPPINES:
: To inspect the new erecting towers and to make daily
monitoring report.
: To make correction of the towers, like bolts tightening
: To fix the lattices and braces
EDUCATION
SECONDARY: GRADUATED MARCH 2000 AT SAINT PETER ACADEMY OF ALEGRIA
INCORPORATED, POBLACION, ALEGRIA, CEBU
COLLEGE : Undergraduate of MARINE ELECTRICAL TECHNICIAN COURSE
LICENSE AND CERTIFICATION
: Basic Lineman Training Course Certificate
: NC 2 EIM Electrical Installation and Maintenance Certificate
: Philippine Drivers License
: Saudi Drivers License
REFERENCES
emailed
.