POSITION APPLIED FOR: MILLWRIGHT SUPERVISOR/FOREMAN
PERSONAL DETAILS:
Name : Raul Pasco Cataluna
Nickname : Raul
Address : Purok Sawmill3, Brgy. Bata, Bacolod City
Mobile No. : +639*********, +639*********
Email Address : **************@*****.***
Date of Birth : August 24, 1964
Marital Status : Married
Citizenship : Filipino
Passport Number : P3805969B
EDUCATIONAL & QUALFICATIONS:
College : Pag-laum State College
Course : Bachelor of Science in Industrial Technology
Automotive Technology
School Year : 1981 - 1985 (Graduate)
WORK EXPERIENCE:
Company : JGC Company / Hassi R'Mel Algeria
Project : Hassi R'Mel Boosting Phase III Project
Position : Foreman Millwright
Inclusive Date : July 08, 2018 to July 31, 2019
DUTIES and RESPONSIBILITIES:
Responsible of my duty to perform of the workers to assign of designed area, like installation of the sole plates and center plates of the concrete foundation of compressor, turbine, auxiliary, there are 10 concrete foundation, take first the distance bolt center of the anchor bolt's, according to the vendor (G.E.) frame 5, and after the Q.C. inspection of (D.B.C.) also preparation of shim's for installation the machine in the concrete foundation. Assymble also, filter house ventillation fan, exhaust stack, filter house structure, inlet and exhaust frame, assymble, lube oil, install also dry powder, CO2 bottles, mineral oil, scrubber shut off vent valve, preparation of preliminary alignment of rotating equipment.
Company : Arabian fal Co / Aramco KSA
Project : Udhailiyah Gas Plant / Mechanical Section
Position : Foreman Millwright Maintenance
Inclusive Date : Oct. 7, 2014 - Nov. 15, 2016
DUTIES and RESPONSIBILITIES:
Responsible of my duty to perform of the workers to assign of designated area according to my supervision. There's a some trouble of rotating equipment like pumps, turbine, fin fan coolers, gear box, of all rotating equipments, if big trouble or equipment to over hauling & replacement of parts of equipments but if normal, equipments only preventive maintenance.
Company : Sungchang Company / Aramco
Project : Generator Power Plant in Wasit / Al Jubail K.S.A.
Position : Millwright Foreman
Inclusive Date : September 12, 2012 - April 07, 2014
DUTIES and RESPONSIBILITIES:
Responsible G.T.G. 1 up to 4 installation the equipment of the foundation of concrete setting of the equipments according the tolerance of client and I follow up in work site on progress to the workers and inspection of the client of equipments until now on progress in work site/gas turbine and generator and exciter with starting unit under the vendor supervision of Mitsubishi/and also assign in the feed water pumps I perform in the foundation in the equipments leveling, centering, and alignment using of reverse method pipe stressing until final alignment accepted by the client. Until running conditions of all rotating equipment commissioning of plant.
Company : Nasser S. Al llajri Corporation
Project : Allector Mittal/Pipe Tubular / Al Jubail K.S.A.
Position : Millwright Supervisor
Inclusive Date : March 18, 2011 - June 19, 2012
DUTIES and RESPONSIBILITIES:
Responsible for monitoring the progress of the area in O.C.T.G./L.P.L. Installation of all equipments in that area and alignment of equipments including the Hydro Tester of Equipments installation and alignments of equipments such as monitoring of all drawings in location of equipments in that area including the elevation of equipments until inspection of the client for approval. And all rotating equipments the procedure of the alignments is reverse method and face rim using the dial indicator and also tale the pipe stressing of until the final alignments accepted by the clients. Until running conditions of all rotating equipment commissioning of plant.
Company : Kellog Brown & Root International
Project : New LNG Train Skikda Project, Algeria
Position : Rotating Equipment Supervisor
Inclusive Date : April 5, 2010 - May 5, 2011
DUTIES and RESPONSIBILITIES:
Responsible for monitoring the progress installation of the rotating equipment such as Frame 7 & Frame 5 Gas Turbine, MR/PR compressor, Feed Gas compressor, External Propane compressor, Fuel Gas compressor & Gas Turbine Generator, BOG compressor and Auxiliary Equipment, Vessels, Pumps, Heat Exchanger, Thermal Oxidizer, Air coolers, Helium Rich Stream Compressor, Diesel Engine Generators and Reciprocating compressors from LNG Train, Fractionation and Offsite area started set to foundation till final alignment.
Manage the Preservation of long storage equipment, established program, log sheets procedures, calendar and schedule.
Provide feedback to the RFI/NCR issues relevance to the drawings, materials missing, set up & alignments of equipments, equipments mismatch, equipment damages, piping clashed and structures modification.
Ensure all aspect of works under the scope and are executed with respected to the approved design.
Implement procedures on site, safety quality of works and assurance.
To ensure that all the required materials, spares and consumables and tools are of the right quality and quantity and available on a continuous basis.
Report directly to the Mechanical Superintendent.
Inspection of alignment of rotating equipment using reverse method and face and rim depend the client. Until running conditions of all rotating equipment commissioning of plant.
Company : Hyundai Eng'r/Woolem Eng'r.
Project : Ra Laffan State of Qatar / POWER PLANT
Position : Foreman Millwright
Inclusive Date : July 13, 2009 - January 31, 2010
DUTIES and RESPONSIBILITIES:
I assigned at boiler area in 16 Boiler feed pump compressor w/ 36 tons capacity, install of high pressure, low pressure of boiler Feed Pump compressor w/ completed skip install of motor, First to make the center line of foundation and then take the elevation in then make of padding from install of skid completed of equipment. The alignments reverse method according to the vendor of inspection to take also a pipe stressing and then until final alignment. Until running conditions of all rotating equipment commissioning of plant.
Company : M.S. Al-SUIWAIDI Industrial Service Co. LTD
Project : Jubail K. Saudi Arabia / PETROCHEMICAL PLANT
Position : Mill Wright Maintenance
Inclusive Date : Nov. 28, 2005 - Nov. 21, 2007
DUTIES and RESPONSIBILITIES:
I worked in two plants as maintenance, first in (SADAF) Saudi Petrochemical Company, I maintain of all rotating equipment of Styrene area, like fin fan, pumps, turbine compressor and gearbox etc. sometimes overhauling if big trouble in equipments.
I work also at (SAFCO) Saudi Arabia fertilizer company, as millwright maintenance, I maintain of all rotating equipment the same my work in SADAF. Until running conditions of all rotating equipment commissioning of plant.
Company : Bechtel Africa (Equatorial Guinea Project) EEI Company
Project : Refinery Plant, Equational Guinea Africa / L.N.G.
Position : Mill Wright
Inclusive Date : August 21, 2004 - August 15, 2005
DUTIES and RESPONSIBILITIES:
New Plant in Malabo Island in Equational Guinga Project. I work as millwright construction, the product of the plant is liquefied natural gas (LNG), installation of all rotating equipment, leveling, alignment, pipe stressing of equipment until running conditions of all rotating equipment commissioning of plant.
Company : AL-YUSR TOWNSEND & BOTTUM CO. LTD.
Project : Petrochemical Plant Expansion Project in Jubail SADAF
Position : Mill Wright
Inclusive Date : Nov. 11, 2002 - June 8, 2003
DUTIES and RESPONSIBILITIES:
Installation of rotating equipment, leveling and alignment until final of running condition of equipment. Until running conditions of all rotating equipment commissioning of plant.
Company : Plant Engineering Construction (Singapore)
Project : New Pharmaceutical Plant under the supervision of (Jacobs Land)
Position : Mill Wright
Inclusive Date : June 2001 - January 2002
DUTIES and RESPONSIBILITIES:
All new rotating equipment installed and checking of differences of misalignment going tolerance of pumps and motors. Until running conditions of all rotating equipment commissioning of plant.
Company : MOHAMMAD AL-MOJIL GROUP
Project : PETROCHEMICAL PLANT / KEMYA OLIFENS
Position : Mill Wright
Inclusive Date : May 3, 1999 - May 30, 2000
DUTIES and RESPONSIBILITIES:
Installation of all rotating equipments / box using of reverse method of alignment, for the new refinery plant at Jubail, Kemya Olifens and then inspected for the final alignment. Until running conditions of all rotating equipment commissioning of plant.
Company : AG & P Overseas Manpower Division / M.W. KELOGG Co.
Project : Refinery Plant / L.N.G.
Position : Mill Wright
Inclusive Date : Sept. 28, 1997 - August 2, 1998
DUTIES and RESPONSIBILITIES:
Renovation of Sonatrach GL.IK (Liquefied Natural Gas Project) LNG in SKIKDA Algeria. Dismantle the old steam turbine and also gas compressor, for change the new split bearing, under the supervision of GEC ALSTHOM. Three area from 10 - 30, all differences of parts from steam turbine going to gas compressor is to changes to new all parts until conditions of all rotating equipment commissioning of plant.
Company : EEI/BECHTECL INTERNATIONAL INC./BECHTEL CO.
Project : Refinery Plant / SONATRACH, Wilaya D. Oran, Algeria / L.NG.
Position : Mill Wright
Inclusive Date : May 8, 1996 - May 14, 1997
DUTIES and RESPONSIBILITIES:
Installation of Three desalination processing to separate seawater and warm water to the desalination area. Installation of three skid complete pumps in complete alignment. Until running conditions of all rotating equipment commissioning of plant.
Company : EEI/BECHTEL INTERNATIONAL, INC. / BECHTEL CO.
Project : Refinery Plant / SONATRACH, Wilaya D. Oran, Algeria / L.N.G.
Position : Mill Wright
Inclusive Date : June 3, 1995 - April 8, 1996
DUTIES and RESPONSIBILITIES:
Installation of Six sewage vertical pumps going to processing of sea water to the desalination area. Complete alignment of each vertical pump is 35, 000H.P all pumps at production area at 100 - 600 processing of Liquid natural gas (LNG). Until running conditions of all rotating equipment commissioning of plant.
Company : EEI/Engineering Equipment, Inc. / ENRON CO.
Project : ENRON Subic Power Plant Project / Olongapo City
Position : Mill Wright
Inclusive Date : Aug. 28, 1993 - Jan. 22, 1994
DUTIES and RESPONSIBILITIES:
Eight wartsila diesel engine 108 megawatts/complete alignment rubber coupling. Until running conditions of all rotating equipment commissioning of plant.
Company : EEI/Engineering Equipment, Inc. / Outokumpo/Linde-Ag Munich
Project : Refinery Plant/Outokumpo Int'l. Projects Services, LTD, OY
: Oxygen Plant/Linde-AG Munich/PASAR, Isabel Leyte
Position : Mill Wright
Inclusive Date : July 18, 1992 - Nov. 27, 1992
DUTIES and RESPONSIBILITIES:
Process of all feed pumps turbine with complete alignment products pumps with complete alignment. Install one unit turbo air compressor at oxygen plant. Until running conditions of all rotating equipment commissioning of plant.
Company : JIRRIS Marketing, Incporated/Mandalagan, Bacolod City
Position : Mechanic
Inclusive Date : Jan. 1987 - February 1989
DUTIES and RESPONSIBILITIES:
Overhauling section at motor pool dept., Dismantle the diesel engine tractor. Assemble the I-type engine and V-type engine.
Company : FIRST FARMER MILLING AND MARKETING COOP. ASSTN., INC.
(FFMMCAI)
Position : On-the-Job Training/Motor Pool Dept.
Inclusive Date : June 17, 1984 - January 2, 1985
DUTIES and RESPONSIBILITIES:
Overhauling section at motor pool dept., Dismantle the diesel engine tractor. Assemble the I-type engine and V-type engine.