Post Job Free

Resume

Sign in

Project Coordinator Cnc Programmer

Location:
Putatan, 1772, Philippines
Posted:
May 01, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

Name : RAMON E. MARASIGAN

Residential Address : 701 VIOLA BLDG.; RHAPSODY RESIDENCES; EAST SERVICE ROAD; BARANGAY BULI; MUNTINLUPA CITY - PHILIPPINES

Birth Place : MANILA, PHILIPPINES

Nationality : FILIPINO

Marital Status : MARRIED

Education :

Phiilippines (BSCE) MANUEL QUEZON UNIVERSITY -

Philippines (DRAFTING TECHNOLOGY) PHILIPPINE COLLEGE OF ARTS & TRADES EMPLOYMENT WORK EXPERIENCES:

June 13, 2018 – January 2019

ESCA Incorporated (Philippines)

Position: Project Technical Assistant / Document Controller Project: Construction of Built Unit Parking Area @ Lot 5, B1-B2 Mitsubishi Motors Philippines Corporation No. 1 Autopark Avenue, Greenfield Automotive Park Special Economic Zone Sta. Rosa Laguna Job and Duties: Work Responsibilities:

Generally - in charge of Monitoring and Inspection for the Construction of Built Unit Parking Area for: Concrete Pavement Parking w/ Total Area = 54, 513.00 sq. mtr. / Concrete Structural and Barbed Wire Perimeter Fencing / Plumbing and Sewer services / High Mast Electrical Installation. Inclusive of the following: Site Development and Soil Levelling - Cut and Fill works of Sub-base and Base Course prior for Concrete Pouring of all covered parking pavement area.

From - Singapore and Philippines -

August '2017 - May '2018

Freelance Contracting Works

Job and Duties: Work Responsibilities-

Engineering Designs and Estimation (Inhouse) Contract projects. Inclusuve of ACAD used - Designing Construction Plans for Structural / Architecturals works and Site Survey visits for the purpose of building up, for the above mentioned Contracted Projects.

SINGAPORE - Employment Work Experiences:

March-2016 – July'2017

Project COORDINATOR / DOCUMENT CONTROLLER -

BRIO Construction & Engineering Pte Ltd (Singapore) Job and Duties: Work Responsibilities -

Generally Project Coordination and Attending Clien'ts Meeting for: Project Tender Meetings / Project Monitoring Progress & Inspection Meetings - Site Survey & Execution of Estimation for Submission of Scheduled Tender - Preparation of Tender Documents and Material Quoted and Material Samples Preparation, Submission of Tender Design Drawings and Schedule of Works for Clients and Authorities Approval – prior to Commencement of Works Projects Completed - * Singapore Polytechnic – Renovation to EEE General Office at Teaching Block 14 (T14): Level 7 Including Shifting to the Existing Office from Teaching Block 12 (T12) Level 5 to T14 Level 7 May-2015 to December-2015 (Contract Project – COMPLETED) * Singapore People's Association – Water Venture Outlet: CONSTRUCTION - CYCLICAL MAINTENANCE PROGRAMME, ADDITIONS & ALTERATIONS AND IMPROVEMENT WORKS TO PEOPLE’S ASSOCIATION WATER VENTURE OUTLETS AT CHANGI, EAST COAST AND LOWER SELETAR SINGAPORE * Singapore JCTC – Development & Upgrading Projects: - Construction of Covered Walkway from Blk 350 Corporation Drive to Lakeside Primary School, Taman Jurong -

*Construction of Covered Walkway from Blk 111 – Blk 112 Ho Ching Road to Existing Covered Walkway, Taman Jurong - *Construction of New Pavilion Between Blk 175C Yung Kuang Road and Blk 177 Yung Sheng Road, Taman Jurong - *Construction of Bicycle Sheds & Racks Between Blk 120 Ho Ching Road and Blk 121 Yuan Ching Road, Taman Jurong - *Construction of New Covered BFA Infront of Blk 235 Bukit Batok East Avenue 5, Bukit Batok Structural

May-2015 to December-2015

DESIGNER - RJ Crocker Cosultants Pte Ltd (Singapore) (Contract Project). Job and Duties Work Responsibilities -

Assigned in building up design drawings and checking works for Civil Structural work projects mainly in Singapore. Preparation of construction plans submission for tenders and constructions for approval to Building Construction Authorities, Singapore.

Operations Executive

AXA Corp Construction Pte Ltd September-2014 to March-2015

(Contract Project) Monitoring Project Management engineering scope of works. Generally specialist capabilities in total roofing work solutions combined with steel fabrication works, mainly in Singapore, Malaysia, Indonesia and China. Variety of roofing works specialist quality projects including commercial buildings, institutions and quality homes in Aluminium, Colorbond, Patina Copper, Stainless Steel works, Titanium and Titanium Zinc roof systems.

March 2014 – September 2014

Operations Executive – Document Controller / Project Supervisor - Fong Leong Engineering Pte Ltd / UTOC Engineering Pte Ltd. (Contract Project) Contract with: FONG LEONG Engineering Pte LtdProject with: UTOC Engineering Pte Ltd Project: Project Supervisor Job and Duties Work Responsibilities -

Project for: TATE & LYLE Singapore Pte Ltd (Jurong Island Refinery, Singapore) Carbon Furnace Plant and Ancillary Facilities – Infrastructure Project JOB and DUTIES: Carbon Structure - Checking works of Structural Steel Design (TEKLA Software Drawings) Issued by Subcontractor for Construction, prior for Shop Fabrication and Delivery to site for Final erection installation. To ensure Design criteria, Material specifications and General construction arrangement – are followed, in respect to Material procurement preparations of structural works prior for Final Fabrication. Monitoring fabrication works by Sub-contractor, on Daily Work Progress activities. COMPLETED Fabrication and Deliveries to worksite for Site Erection & Installation. Completed work contracted project tasks for: RVF Structure / STAIR TOWER Structure / ALKALI Structure / Waste Gas Structure. January 2011 – December 2013

Resident Technical Officer - RJ Crocker Cosultants Pte Ltd (Singapore)(Contract Project) COMPLETED RTO Contract for: Marina Coastal Expressway - C486 – (Ventilation Building - VB1 / Expressway Road Tunnel - Road / Singapore Project – LTA (Land Transportation Authority) Government Development Project. Job and Duties: Work Responsibilities – Document Controller A Daily Worksite Inspection – Mainly monitoring Site Daily Progress Inspection and Completion for the following: 1. Architectural internal works – management rooms, operational and maintenance room facilities and services room facilities – inclusive of internal roof trellis and vertical wall with green species at 4 nos. building location and total roof garden at upper and lower level. 2. Architectural External works – external aluminium composite wall panel facades-combination with big and small and with vertical fins external at walls, external car park services, driveway at building perimeter, inclusive of building perimeter architectural landscaping. 3. Assigned to monitor site progression and site inspection as per the Request For Inspection (RFI) by Main Contractor for Structural / Architectural internal and external works mainly for (Ventilation Building-VB1) at Marina Expressway Road Tunnel) Project Engineer -

February 2010 – November 2010 (Singapore)

VAST Engineering Pte Ltd.

Project Executor / Document Controller - for special Metal work Roofing works and Cladding works of imported

(solid and composite) material panel, from Germany. Supervision on daily work progress activities of – Permanent Pedestrian Structural Steel Bridge & Temporary Structural Steelwork Access Platform - for Pedestrian Bridge across Sungei Serangoon to Lorong Halus Wetlands (Singapore) of the upcoming upgrading developments of both end areas. CNC Programmer / Designer – Checker / Estimator / Coordinator February’2008 – November’2009

JFK Engineering Pty Ltd - (Maddington, West Australia) CNC Programmer / Document Controller / Project Estimator - CHECKER Job and Duties: Work Responsibilities - Prepare and check - CNC program for the cutting of various types, sizes and thicknesses of steel plates and metal sheets from DXF file drwg, extracted and created from CAD drawing with the use of FASTCAM CAD Program. Creating DXF part detail file drwg from PDF file as requested by the respective client. These are required for the arrangement and assembly dwg to prepare for the program profile to cut. Estimate - plate quantities required for ordering and purchasing of material required for the project. Expedite and coordinate – with material expeditor for the ordered plates to organise for the profile operator for cutting. Prepare priority flow schedule of items to be cut by the profile operators for day shift and night shift. Advice and inform – production department or supervisors in charge for the respective projects - of profile items been cut for their workers to fit-up or final welding installations. PROJECTS COMPLETED: John Holland / Monadelphous / SDR / Sandvik / Outotek and others – For: CHUTES, HOPPERS, BINS, Bucket Wheelers, Cutting or Press & Roll of Miscellaneous Plate works.

MAY’2007- OCTOBER’2007

KELLY Engineering Services (Perth, West Australia) STRUCTURAL CHECKER - cum Estimator

Job and Duties: Work Responsibilities

Rendering Structural Checking Service Order - to their client at Joondalup, West Australia -Structural designing, checking works design and fabrication dwgs.and material estimation prior on material preparation for fabrication of steelworks and installations, as well as for Concrete Tilt Panels for construction. PROJECTS COMPLETED: Commercial, Industrial, Mining and Residential projects. Program used: Pro-Steel program / CAD-R2000 – R006 APRIL’2007 – MAY’2007 –

Awaiting approval of my Visa for Australia

JANUARY’2007- MARCH’2007

STAR WELD Pte Ltd (Singapore)

PROJECT COORDINATOR / SITE SUPERVISOR (Temporary Contract Project) Job and Duties: Ship Building repair and construction. To supervise site installation progress inside the shipyard. OCTOBER’2006 – DECEMBER’2006: Taking Part-time job, due to processing of my employment VISA for Australia

AUGUST - SEPTEMBER 2006

TONG SENG HUAT Engineering Pte Ltd – (Singapore)

QS-ESTIMATOR / DOCUMENT CONTROLLER / PROJECT COORDINATOR -

(Temporary Contract Project) JOB AND DUTIES: Tendering project quotation for various main contractor company on–Supply and Installation of timber roof structure for roof tiling works and metal roof works. Projects are more on private and government residence upgrading. Estimates material quantities and raise material purchase orders required for production and site installations.

JUNE - JULY 2006

UTOC Engineering Singapore Pte Ltd – (Singapore)

DOCUMENT CONTROLLER / PROJECT COORDINATOR / SUPERVISOR – CHECKER (Temporary Contract Project) JOB AND DUTIES: PROJECT. COORDINATOR - Assigned as contractual to check engineering design and coordinate for installation from existing chemical plant to new structural steel work for equipment platform, internal and external pipe racks and piping service and equipment support systems. R & D CHEMDEV Project - CHECKER – Take part on Checking works of initial Main Structural Steel Works for SINGAPORE FLYER – Giant Ferris Wheel PROJECT COMPLETED: - R & D CHEMDEV PILOT PLANT - SINGAPORE FLYER (Giant View @ Marina Promenade)

JANUARY 2006 – MAY 2006

LIAN BENG Engineering Pte Ltd. – (Singapore)

PROJECT COORDINATOR CONTROLLER cum ESTIMATOR / SUPERVISOR Job and Duties: Work Responsibilities

Generally in charge of in-house material estimation for steelwork fabrication and material preparation for site work installation and construction arrangement. Equipped user for CAD–R14, R2000 – 2005 on generating and checking as-built design drawing. PROJECTS COMPLETED: SENGKANG Condominium – Engaged in fabricating steelwork for – Complete Climbing Platform Scaffolding and Tableform Platform Scaffolding to be used as a working platform during concreting works and installation of steelworks structures. LAKESHORE Condominium – Engaged in steelwork of Pavilion Entrance Shelter and miscellaneous steel and stainless steel Floor Drain Gratings, Handrails & Railings, and all Warning column guards for Tower Buildings. PASIR LABA Camp – Completed miscellaneous steelwork for Stainless Steel Staircase, Heavy duty floor gratings, Screen walls, Linkways and other Entrance Metal gates

OCTOBER 2003 – OCTOBER 2005

MARSUN CO. LTD. – Marine Ship Buildings and Repairs (Thailand) TECHNICAL ADVISER – DOCUMENT CONTROLLER / PROJECT ASSISTANT – Job and Duties: Work Responsibilities

Engineering Department Project Team PROJECTS COMPLETED: 2 Units - 38.9mtr Multi Purpose Auxiliary Craft - Engineering Design and material preparation was supplied by Thailand and full steelwork fabrication and installation was completed by Karachi Shipyard in Karachi Pakistan. 4 Units - 16.0 m. (Aluminum) Military Assault Boats – Completely design and fabricate at MARSUN Company shipyard, includes sea trial operations by MARSUN at Thailand, prior on delivery of these vessels to Karachi Shipyard, Pakistan 1 Unit - 35.9 Crew Boat – Design and built at MARSUN Company shipyard premises JOB AND DUTIES: Technical Adviser / Project Assistant-Estimator 2 years Contract employment to a Ship Building and Repair for – Local Government projects – Patrol Boats, Crew Boats, Luxury Boats, etc. Oversea project – Karachi, Pakistan for 2 units of Multi Purpose Auxilliary Craft Technical Adviser – CAD Drawing Checker To develop engineering skill process in ship building for design and construction. To check, and ensure that engineering design drawings on CAD – R2000 and estimates control weights prior for construction and launching of boats for client approval and for final construction. Project Assistant To assist inter department queries, so as to ensure smooth flow of documentation works. To schedule and arrange meetings, in relation to material orders from suppliers and to company’s departmental representative. To solved, answer and confirmed arrangement of site office problems and present solutions feedback to Project Manager for implementations of action to be taken. This spectrum project was totally built fabricated and erected at Karachi Shipyard Engineering, Karachi Pakistan

(CONTRACT PROJECTS) APRIL 2000 – September 2003

Offered Employment Contract under project basis – Various Company (Singapore) - CAD Designer ( R14 / R2000 ) / Project Estimator /Project Coordinator / Technical Assistant FEBRUARY 2000 – MARCH 2000

BD CRANETECH Pte Ltd - PROJECT Engr. / POJECT COORDINATOR CONTROLLER Project Contract Staff - BD Cranetech Pte. Ltd. (Singapore) FOR: Surabaya, Indonesia Project for - 2 units JTC Ship Unloader for Singapore DEC. 1999 – JANUARY 2000

AUGUST 1999 – NOVEMBER 1999

Awaiting employment application approval of employment pass. (Visa – under SVP Pass Holder) (Employment Pass Holder)

AUGUST 1999 – NOVEMBER 1999 (Employment Pass Holder) IEC – INSULATION & ENGINEERING CONSTRUCTION (SINGAPORE) PROJECT Engr. COORDINATOR / ESTIMATOR

Job and Duties: Work Responsibilities

To check quality control drawings from STRU CAD & CAD R2000 operating system / quality assurance of the project for engineering construction. Provide material estimation on steel and sheet metal powder coating for tenders & construction. Follow – up site inspection, attending meetings w/ main contractor and updating progress report. PROJECT: Ministry of Education Building /From - Singapore and Philippines - Freelance Contracting Works

– Fullerton Square Building

NOVEMBER 1998 – JULY 1999 (Employment Pass Holder) HSD-HENRY STRUCTURE DRAFTING PTE. LTD. (SINGAPORE) STRUCTURAL CHECKER / PROJECT COORDINATOR / CAD OPERATOR JOB AND DUTIES: To assure quality assurance of design engineering works prior for fabrication / construction as CAD Operator-R14 & R2000. Review tender documents, engineering specification, estimation for tenders, updating and running of progress report. liase and coordinate with clients. PROJECT: High rise building (Capitol Building – POSBank near Tanjong Pagar MRT Station / Petrochemical platforms / bridges and infrastructures) MARCH 1997 – OCTOBER 1998

(Employment Pass Holder) HUP SENG OFFSHORE ENGINEERING PTE. LTD. (SINGAPORE) PROJECT COORDINATOR / DOCUMENT CONTROLLER / STRUCTURAL CHECKER / ESTIMATOR Job and Duties: Work Responsibilities -

Involved in engineering / material take – off and variation / fabrication and site installation of process skid / process piping and pressure vessels . Checking drawing works done by subcontractors on CAD-R14. Project Coordination works – from Design, Estimates, Material Procurement, Fabrication works till Installation works to Pioneer Shipyard, Material Expeditor Controller of mechanical piping components, electrical instrumentation components for contractors during installations of the project. PROJECT:

IPC MALAYSIA – PROCESS MODULE (1997 Project) NORTRANS RUBY FPSO – PROCESS MODULE (1998 Project) Studies: BSCE – Manuel L. Quezon University - Manila Philippines Drafting Technology - Philippine College of Arts and Trades Languages: English / Bahasa-Thailand Bahasa- Indonesia / Bahasa - Malaysia Computer Knowledge: Microsoft - ACAD / Prosteel / Tekla Structure ACAD – as a user Prosteel / Tekla - as a Checker use only. Other Skills: Equipped with Safety Courses in Construction with Certs. In Singapore and Australia Vehicle Valid Driving License in – Philippines / Singapore / West Australia More Work objective: To contribute more and explore further more, towards my chosen field of works. Industries of interest: Civil-Structurals

/ Architecturals / Mechanicals Areas of interest: Engineering - Construction Works / Production Works / Site Works Availability to travel and work outside the country: Interests and hobbies: Reading interesting subjects / Watching world adventures Email – Contacts - Passport – Driving Licenses

E-mail address : adwuaa@r.postjobfree.com

Contact Nos. : HP – +63 2 – 960-***-**** (Smart) / Home – +63 2 - 8280 9273sav Philippines Passport No. : EB3954600

Philippine Driving License : N11-84-031372 - Professional Australia Driving License no : 5272272 - Class-3

Singapore Driving license no. : F1376983N – Class-3 Thailand Driving License - 06LL600615

RAMON E. MARASIGAN (The Applicant)



Contact this candidate