Jordan Bolt
Wagoner, OK ***67
*********@*******.***
Professional Skills
Pipeline Inspector
Ensure owner compliance with codes and safety standards dictated by drawings and specifications for construction of steel pipelines, 4” to 6” fiberspar and 6” to 12” poly salt water disposal lines. Scope of work included ordering parts and materials, tracking costs of materials and labor, punch lists, weld mapping, As-built and ISO drawings.
Pipeline Foreman
Supervised crews in all aspects of preparation, set up and installation of compressor stations and new pipeline construction, including: ROW, bending, stringing, ditch, laying pipe, lowering in, tie-ins, valve settings, launchers and receivers, testing of fabrication and main line, clean up, fencing, and civil work.
Combination Operator/CDL “A”
Experienced in operation, deployment and utilization of various types of pipeline equipment and systems.
Brief History of Jobs
2020-Present
Applied Consultants – Utility Inspector, Cardinal Midstream Minco OK. Sam Noble Project, Responsible for all aspects of job duties. Work included R.O.W Clearing, Stringing of Pipe, Ditch, Lowering-In, Backfill, Testing of Pipeline and Final Clean Up (Restoration).
2019 – Present
Applied Consultants – Assistant Chief, Cardinal Midstream El Reno/South, OK. Responsible for restoration of (34) pipeline projects. Work included providing punch lists, daily reports, scheduling/coordination of multiple contractors and crews. Conducted final inspections for all projects.
2018
Applied Consultants – Inspector, Cardinal Midstream. Restoration and cleanup of 5 miles of 8” and 15 miles of 20” pipeline projects.
Palmer Consulting and Inspection – Inspector, Consultant and de facto technical advisor to the contractor, Pecos, TX.
2016 – 2017
Strike Pipeline – Combination Operator, Pecos, TX.
Strike Pipeline – Combination Operator, 200 miles Crestwood Shepard Gathering project.
2015
Progressive Pipeline – Line Locate Foreman, Saddlehorn Pipeline Project, OK.
Sterling Pipeline – Combination Operator, Spread #5, Shepherd Pipeline Project, OK.
2013 – 2014
TransCanada Keystone Pipeline, Spread #4. ROW and final cleanup for environmentally sensitive areas for approximately 1 year, Livingston, TX.
Sunland Construction, Southern Star 26” steel pipeline anomaly digs, Blackwell, OK.
Sterling Construction, Spread #2, 200+ miles of 20” steel pipe. Tie-in operator and spacer.
Progressive Pipeline, 120 miles of 16” and 80 miles of 16” steel pipe. Tie-in and final cleanup operator, College Station, TX.
Parnell Consultants – Inspector new salt water disposal pipeline construction, Sandridge Energy.
Two Rivers Pipeline – Stringing Foreman, multiple sized lines to refinery in Wheeler, TX.
Progressive Pipeline – Exposed existing lines 12” – 24”, Talisman Gas gathering system loup, San Antonio, TX. Lowering-in and Backfill Foreman for 40 miles of 24”, Bay City, TX.
Dimension Pipeline – Lead Operator and Tie-in Foreman.
2011 – 2012
Driver Pipeline – Operator for inner city dual 24” and 36”, Ft Worth, TX.
Jomax-Okema Pipeline – Lead hydro tester and Labor Foreman.
Sunland Construction – Labor Foreman.
AOK Construction – Foreman for installation of gathering systems, 2” – 10” for Devon Energy.
Jomax Pipeline – General Foreman for well hookups and gathering systems, Petro Canada, Gillette, WY.
Education
High school – Forest Lawn, Calgary, Alberta, Canada.
Abnormal operating conditions – general pipeline.
OQ qualified, Veriforce, nccer.
Personal
Third generation pipeliner.
Dual citizen of the United States and Canada.
Single, age – 37