Post Job Free

Resume

Sign in

Electrical Engineer Aramco

Location:
Al Khobar, Eastern, Saudi Arabia
Salary:
10000
Posted:
April 17, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

MUHAMMAD RAMZAN E-mail: adwlek@r.postjobfree.com,

Mobile: 059*******

(Electrical Engineer)

Objective:

Carry out the challenging role of Electrical Equipment Installation, inspection, pre-commissioning, with dynamic organizations through the international quality standards, procedures & safe work practices by utilizing the latest techniques and technology for the mutual growth and advancement

Personal Profile:

Name

MUHAMMAD RAMZAN

Nationality

Pakistan

Iqama No.

237-***-****

•Have A Valid KSA Driving license

Personality Characteristics

Goal orientated, Punctual and trustworthy.

Pleasant appearance & a listener.

•Out of the box approach to challenges.

•Open minded personality, dynamic and motivated

Language proficiency

•English

•Urdu

Academic Education:

•(Bachelor in Electrical technology) (1994-1997)

Professional Courses/ Training

a.TEC Westinghouse Motors Vender training

b.Eaton MV&LV SWGR&MCC vender training

c.UPS (AEG, Eaton & Gutter) vender training

d.Energy Isolation training up to 34.5KV

e.Maintenance work process training

f.Lockout/tag out(LOTO)) training

g.SADARA certified as Skilled person

h.Life Critical Standards Course Process Safety Training

j.Site Induction Program

k.Certified MV Cable jointer Training from Raychem At TECO Workshop 2010 To 2011 (ABU DHABI)

l.Certified MV Cable jointer Training from Raychem At TECO Workshop 2011 To 2013 (ABU DHABI)

m.Certified MV Cable jointer Training from Raychem At 3M Workshop 2013 To 2014 (ABU DHABI Computer Literacy:

Having hands on experience for basic computer operating systems Windows 98 & Windows2000 Certified for MS Office (Microsoft Exel-2000, MS-word & Power Point

Experience Profile:

•Since Mar. 1996 to date professionally working on Cement Plant, Petrochemical, Oil & Gas, projects. Experienced of installation, inspection, Pre-commissioning. Fully understand the overall project schedule to meet Sub-system vise project completion targets. Capable to interpret one line/three-line diagrams, P&lD, wiring and schematic diagrams. Familiar, Saudi Aramco Engineering Standards, DOW chemical engineering Specs. In addition, relevant quality control & maintenance procedures and able to comply with NFPA-70 (National Electrical Code) & safe work practices requirements.

Installation & Pre- Commissioning Experience:

•Sub-station (34.5KV/13.8KV/4.160KV/.48KV)

•Switchgears, Motor Control Centers (MCCs)

•Motors and local control station for motors

• Variable speed drives(VSDs) for motors

•Power Transformers, NGR system, Grounding Systems

•Diesel Engine Power Generators, ups and DC Batteries

•Distribution & lighting panels

•Plant lighting& receptacle systems

•Street lighting system installation & pre-commissioning

•Cable tray & conduit systems

•underground cabling & duct bank installation

•Electric heat tracing system, Cathodic protection system

KEY SKILLS AND COMPETENCIES

•Electrical installation & pre commissioning experience in an industrial environment.

•Ability to work in a fast-paced-environment.

Estimating both small and large-scale electrical works.

•Ability to identify opportunities to reduce costs and improve efficiency.

•Negotiating with sub-contractors.

•Aiming for complete customer satisfaction whilst remaining commercially aware.

Experience Detail Saudi Arabia &UAE

April 2022 –To November 2022

SEP 2020- to March 2022

Company

MARAFIQ

Contractor

POWER ZONE CONT LLC (Saudi Arabia)

Project:

ICCP project

Position:

Electrical Site Engineer

FEB 2020- to August 2020

Company

Jizan Refinery

Contractor

Hitachi LTD (Saudi Arabia)

Project:

JZUP Project JIZAN

Position:

Electrical Engineer

August 2019- to January 2020

Contractor

TCC (Saudi Arabia)

Project:

SABIC United Plants Extension Project Jubail

Position:

Electrical Engineer

May 2018- to JULY 2019

Company

Jizan Aramco Refinery

Contractor

Hitachi LTD (Saudi Arabia)

Project:

JRUP Project JIZAN

Position:

Electrical engineer

July 2017- to April 2018

company:

Uthmaniyah Gas Plant

Contractor

Global accurate LTD (Saudi Arabia)

Project:

DCS UP grading System

Position:

Electrical engineer

Mar. 2015- to April 2017

Company:

SADARA Chemical Company (Saudi Aramco & Dow Chem. Joint Venture)

Contractor

SEPAM (Saudi Arabia)

Project:

SADARA Plastic Envelope

Position:

Electrical Engineer

April 2012 to April 2014

Company:

Tekreer Oil Refinery LTD (Abu Dhabi)

Contractor:

Sendan Gulf company (Abu Dhabi)

Project:

RRE project (Abu Dhabi)

Position:

Electrical Engineer

April 2011 - April 2012

Company Name

Gasco LTD (Abu Dhabi)

Contractor:

Descon Engineering LTD (Abu Dhabi)

Project

IGD 5 habshan in (Abu Dhabi)

Position

Electrical Engineer

June. 2010 - Mar 2011

Company

MARFA Nitrogen LTD (Abu Dhabi)

Contractor:

Descon Engineering LTD (Abu Dhabi)

Position

Electrical Engineer

Project:

(ASU)Nitrogen Plant Marfa(Abu Dhabi)

Mar.2009 - Feb.2010

Company

Brogue Petrochemical LTD (Abu Dhabi)

Contractor:

Descon Engineering LTD (Abu Dhabi)

Position

Electrical Lead Engineer

Project:

Brogue Il Project at Ruwais (Abu Dhabi)

May. 2008- Mar.2009

Name Company

Gasco LTD (Abu Dhabi)

Contractor:

Descon Engineering LTD (Abu Dhabi)

Position

Electrical Engineer

Project:

Casco Il Expansion Project Ruwais (Abu Dhabi)

April 2007 TO December 2007

•Name Company Gasco LTD (Abu Dhabi)

•Contractor: Descon Engineering LTD (Abu Dhabi)

•Position Electrical Engineer

•Project: AQMS Project Gasco Hub Shan (Abu-Dhabi)

January 2007 TO March 2007

•Name Company Brogue Petrochemical LTD (Abu Dhabi)

•Contractor: Descon Engineering LTD (Abu Dhabi)

•Position Electrical engineer

•Project: Brogue Furnace # 6 Project at Ruwais (Abu-Dhabi)

May 2005 TO June 2006

Name Company Gasco LTD (Abu Dhabi)

Contractor: Descon Engineering LTD (Abu Dhabi)

•Position Electrical Engineer

•Project: ULG-LSGO Expansion Project Ruwais (Abu-Dhabi)

Jånuary.2005 TO March 2005

•Name Company Brogue Petrochemical LTD (Abu Dhabi)

•Contractor: Descon Engineering LTD (Abu Dhabi)

•Position Electrical lead engineer

•Project: Brogue Il Expansion Project at Ruwais (Abu-Dhabi)

June2004 TO January 2005

•Name Company Gasco LTD (Abu Dhabi

•Contractor : Descon Engineering LTD (Abu Dhabi)

•Position. Side electrical Engineer

•Project: Ethen Recovery Maximization Project Hub Shan (Abu-Dhabi)

December2002 TO December 2003

Name Company

OMV AUSTRIA LTD(Pakistan)

Contractor:

Descon Engineering LTD (Pakistan)

Position

Assistant electrical engineer

Project:

SAWN Gas Field 0M V (Austria) Project(Pakistan)

May 2002

TO December 2002

Name Company

Ghazi Barotha Energy LTD(Pakistan)

Contractor:

Descon Engineering LTD (Pakistan)

• Position

Side electrical supervisor

Project:

Ghazi Barotha Hydro Power Project (Pakistan)

December 2001 TO April 2002

•Name Company Ibrahim Fiber Polymer LTD

•Contractor: F T Flowtronex PVT LTD

Position Senior electrical supervisor project Ibrahim Fibers (Ltd) Polyester Plant (Shah Cot) Project (Pakistan)

March 2001 TO October 2001

•Name Company ICI SODA LTD (Pakistan)

•Contractor: Descon Engineering LTD (Pak)

•Position Electrical side Incharge

Project: ICI Soda ash (D.B.N) Khewara Project (Pakistan)

January 2001 TO March 2001

•Name Company Chiasma Hydro Energy LTD

•Contractor: EKL Engineering LTD (Pakistan)

•Position Electrical side supervisor

Project: Chiasma Bai raj Hydro Power Project Mianwali (Pakistan)

June 1999 TO January 2000

•Name Company Parco Oil Refinery LTD(Pakistan)

Contractor: Descon Engineering LTD (Pak)

•Position Electrical supervisor for LV &MV Cable terminations

Project: PARCO mid Country Oil Refinery (Mahmood Kot) Project

February 1998 TO May 1999

•Name Company Fuji Fertiliser company

•Contractor Descon Engineering LTD

Position Electrical lead

•Project: FJFC Bin Qasam Port (Karachi) Project (Pakistan)

Responsibilities as lead man & foreman

•Participating in plant daily weekly general walk downs

•Carrying out electrical installation and pre commissioning & commissioning

•Using tools & testing equipment including ammeters & test lamps.

•Administrative work like maintaining records and files and preparing reports.

•Filling the history sheet of equipment for future reference and reliability

•working as Good team Player to achieve a common goal of access

•To fallow the Company Procedure and Safe work Practice job safely

Responsibilities as Electrical Supervisor

•Supervising and undertaking all discipline related Work as per project scope of work

•Preparation of pre-commissioning, energization packages& loop packages.

•Attend the projects meetings and perform action on related agreed points.

•Assists in the design and calculation work by providing the required input to the Project Engineers.

•Perform the required coordinating with all related disciplines.

•Review the submittals for material as per scope of work

•Review & submit any modification to engineering before submittals.

•Supervise and monitors all construction work as per scope of work

•Estimate, prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for activities.

•Inspect the on-site and off-site materials to be used in the project to ascertain their compliance with the specifications and determine it acceptability for use on the project.

•Scheduling and planning the work activities with available resources and keeping the management always updated with the work progress.

• Ensure the site execution is in accordance with health, safety and environmental standards.

•Coordinate with construction team to derive site requirements

•Implement advanced safety measures in the whole site activities.

•Complete all projects within schedules to ensure maximum management satisfaction

•Maintain detailed documentations throughout the projects

•Discussed possible modifications with higher management

•Provided material specifications and coordinated with the warehousing department to ensure quick delivery of the material

•Followed safety and design standards throughout the project

•Study-of drawing and before executing the work

•To co-ordinate with third parties for equipment pre-commissioning and commissioning.

•To check the entire work as according to approved drawings.

•Supervising the installation & trouble shooting on electrical equipment.

•Planning & supervising installation, modification and maintenance work.

•Dealing with any technical issues that may arise.

•Ensuring that on site Health & Safety regulations are strictly adhered to. Supervising the junior and newly qualified personnel. Conducting site surveys, audits and inspections.

•Organizing work schedules, material, manpower and other resources making sure that safe working practices are maintained at all times.

•Making sure that work methods are sufficient to meet a project need

•Attending weekly /monthly quality construction meetings for project issues and

•Their solution.

•Coordination with other site supervisors during execution of work to prevent cause of delays and violation.

•Work with construction & project manager to obtain necessary resources

•Establish meeting times, places and agendas

•Coordinates meetings with the team, construction & project manager and functional management to discuss project impediments, needed resources or issues/delays in completing the task

•Planning & supervising the modification work.

•Overseeing the complete strip out and refurb of a client site.

•Provide status &reporting of team activities against the program plan or schedule

•Keep the site engineer informed about task accomplishment and issues

•Serve as a focal point to communicate and resolve interface and integration issues with other teams and discipline

•Escalate issues to higher management which cannot be resolved by the team & myself

•Provide guidance to the team based on management direction Issuance of punch listing as per project scope of work.

•Preparation/witness of Instrument Loop packages for the entire pre-commissioning and testing of plant instrument

•Preparing the Power Energization Packages to perform pre-commissioning and maintain the testing record

•Participating in acceptance walk through and preparing punch list against uncompleted Jobs & deficiencies.

Contact Information:

MUHAMMAD RAMZAN

Cell:059*******

Email: adwlek@r.postjobfree.com



Contact this candidate