Aviraj
CHAUHAN
Telecom Engineer
Seeking the challenging career
to carve out a niche for myself
marked by professional
excellence, while actively
contributing to the
development of the
organization by employing my
skills.
adwl4a@r.postjobfree.com
Near Vishnu Dham Ashram,
Opp. Panchvati Society
30 years old
Indian
GJ0920110180406
Married (with child)
Languages
Gujarati
Read Write Speak
English
Read Write Speak
Hindi
Read Write Speak
Interests
EDUC ATI ON
B.Tech
Arya College of Engineering & IT - Jaipur, Rajasthan - From August 2012 to August 2015
Electronics & Communications Engineering
Diploma
K D Polytechnic - Patan, Gujarat - From August 2007 to August 2010 Electronics & Communications Engineering
10th Class
Shree Lakshmi Narayan High School - Vadtal, Gujarat - From June 2006 to March 2007
Science & Mathematics
WORK EX PERI EN C E
Telecom Engineer
Al Asateen Integrated Systems LLC- Oman- From January 2022 to Present Supervise Fiber Optic Cable Blowing, Splicing in Joint Enclosure, Fiber Termination in Patch Panel, OTDR, Power Testing, Trenching, HDPE Duct Installation, Manhole Installation
Design Engineer
SAC-ISRO-Ahmedabad-From November 2018 to July 2021 Operations & Maintenance of Thermovacuum Plant
Team Leader
Reliance Jio - Vadodara - From August 2017 to November 2017 Fiber to The Home (Administrate & Manage Team)
RF Engineer
Teleysia Networks Pvt Ltd - Ahmedabad - From March 2017 to July 2017 Network Testing
Team Leader
Reliance Jio - Vadodara - From October 2015 to May 2016 RF Optimization (Administrate & Manage Team)
TEC H N I C A L S K I LLS
PLC
Operate Thermovacuum Plant through PLC and SCADA systems, execute the operation and maintenance of LN2 tanks, Air Compressors, Dryers, Generators, Rotary Pumps, Roots Pumps, Turbo Molecular Pump, Cryogenic Pumps, Gas Analyzer, AC/DC drives, Hydraulic & Pneumatic machines, Cooling tower, AC plant, ESD system, FDS system etc. Operate PLC and HMI.
Monitor and control all activities involving Filling, Storage and Distribution of LN2 Gas till the customer premises.
Perform the preventive and reactive maintenance, troubleshooting, repair and replacement of any defective/damaged equipment, parts in Thermovacuum Plant. Monitor network pressures from LN2 yard, network until the customer inlet valve. Soft Skills
Leadership, Hard Working,
Quick Learner, Punctual,
Good Communication Skills,
Public Interaction etc.
Industrial Project
Ensure that the site security has not been compromised. Report any evidence of unauthorized access immediately. Maintain an effective quality assurance, work control and management system for the Thermovacuum Plant. Actively participated in New Bell Jar
Vacuum System Installation. It
consists of Two Rotary Pump for
initial Vacuum & Turbo molecular
pump for Higher Vacuum. Made
Relay based control panel to
perform Operations.
Working experience of Allen Bradley PLC, Wonderware Intouch, Rs Logix 500 & Siemens PLC, WinCC, Simatic Manager Step 7.
Listen Music, Boxing
Testing
Manual Testing:
1) Write Test Cases, 2) SDLC & STLC, 3) Black Box Testing, 4) Unit Testing, 5) Integration Testing, 6) System Testing, 7) Acceptance Testing, 8) Develop Test Strategy, 9) Agile Testing, 10) Alpha Testing, 11) Beta Testing, 12) Smoke Testing, 13) Regression Testing, 14) GUI Testing
Automation Testing:
1) Write Automation Test Scripts, 2) Selenium WebDriver using JAVA, 3) Selenium Grid, 4) Test NG, 5) Maven, 6) Jenkins RF Optimization
Network Testing, Site Optimization, Troubleshoot Network Problems, Solve Speed & Coverage issue, Check Azimuth, Mechanical Tilt, Electrical Tilt, Check Swap on site
Fusion Splicing
When two fibers fused together is known as Fiber Splicing. Fiber splicing achieved using different fiber splicing machines which consist of electric arc & heat sink for protection of spliced fiber. Installation, Troubleshooting & Analyze network routes C, C++, JAVA, Selenium Web driver, MATLAB, VLSI, VHDL, HTML, Assembly Language
Routers
Basic Knowledge of Software Languages
Non-Technical
-A part of exhibition, VSSE, spreading awareness about ISRO in depth to various school and college students, visitors from all over world. Also did few remote area exhibitions varying from rural to urban areas.
-Frequent English speaking
-Leadership skills, strong deterministic
-Good communication skills
-Sincere, Punctual, Persistent
Computer Skills
Operating System
MS Word, MS Excel, MS Power Point, MS Outlook
Linux, Windows 7,8,10
Projects & Training
BSNL Training
Broadband,3G,2G, Telephone Exchange, Main Distribution Frame Power Plant Two Way Wired Intercom
Soldering, Breadboard Testing, Circuit Design. Like Wired Walkie Talkie (Half Duplex) Signal is sent in both directions, but one at a time.
Radio Transmitter & Receiver
Circuit Design & Testing
DECLARATION
I confirm that the information provided by me is correct. SGDN P2
As FOC site engineer and carry out all ctivities releted to Fiber like Fiber Blowing, Splicing, Fiber Termination, OTDR Testing, Power Testing, Duct Laying, Manhole Installation, Testing & Commisioning and Final Documentation.