Post Job Free

Resume

Sign in

Crane Operator Project Manager

Location:
Manila, Philippines
Posted:
April 18, 2023

Contact this candidate

Resume:

ROGER SARMIENTO

FLORES

OBJECTIVES

TO SECURE A RESPONSIBLE AND STABLE POSITION

THAT ENSURES PERSONAL CAREER GROWTH BY

PERSONAL

GAINING MORE KNOWLEDGE AND EXPERIENCE

PROFILE

THAT FIT TO MY PROFFESION

095*-***-****

adwl3p@r.postjobfree.com

259 SITIO LIBIS TANONG STA MARIA Work Experience

BULACAN

NATIONALITY: FILIPINO FOREMAN LINE MAN

CIVIL STATUS: MARRIED 2014 - 2022 MOHAMMED BIN GARBOO EST RIYADH K.S.A

DATE OF BIRTH: JULY 9,1980

ORDER FOLLOW UP EQUIP FOR SCOPE CHANGES.

WORK WITH OTHER DEPARTMENT TO ENSURE A HIGH LEVEL

OF QUALITY THROUGH FEEDBACK FROM FIELD

About Me RESPONSIBLE FOR CONTINOUS IMPROVEMENT AND

IMPLEMENTATION

LET ME INTRODUCE MYSELF, I RESPONSIBLE FOR COMPLETION OF PROJECT IN TIME

AM CURRENTLY WORKING AS A

OVERSEE PROJECT SAFETY AND ASSIST WITH DAILY

FOREMAN HAVING OF 11 YEARS

EXPERIENCE IN ELECTRICAL LINE ACCOMPLISHMENTS

INDUSTRY STARTING AS A LEAD CREWS AND ACTIVELY WORK WITH THEM IN ALL

OPERATOR AND LINEMAN

PHASES OF CONSTRUCTION MAINTENANCE AND, OR

TURN AROUND JOB ACTIVITIES

ENSURES ALL WORK IS SAFETY EXECUTED AND INSURING

THE SAFETY OF WORKERS AND EQUIPMENT

UNDERSTAND PROJECT PLANS SPECIFICATION AND

FAMILIARITY WITH JOB SCOPE CHANGES

PERFORM HANDS-ON DIAGNOSIS,REPAIR AND SCHEDULED

Refrences PREVENTATIVE MAINTENANCE ON EXISTING SYSTEMS,

EQUIPMENT,FIXTURES, AND INFASTRACTURES

MR. SALVADOR D.

SERVE UNDER THE DIRECTION OF PROJECT MANAGER TO

CORTEZANO

OPERATE AND MAINTAIN HIGH VOLTAGE DISTRIBUTION

SUPPLY OILFILLED

WORK ON POWER CABLES, TRANSFORMERS, INSULATORS

SERVICE INC.

AND CONTROL EQUIPMENTS

USE AND MAINTAIN VARIOUS HAND AND POWER TOOLS

ENGR. NERIO B.

OF THE TRADE

FRANI

PERFORMIONG ALL TYPES OF LINE WORKS AND ENERGIZED

PRESIDENT V5 OVERHEAD AND UNDERGROUND DISTRIBUTION AND

ELECTRICAL TRANSMISSION LINES IN ALL VOLTAGE CLASSIFICATION

CONSTRUCTION

CON INC. CRANE OPERATOR, BOOM TRUCK DRIVER

FOREMAN LINE MAN

MR. EDUARDO 2011 - 2013 RIYADH K.S.A

VILLARINO OPERATE AND HOIST

MERALCO TRANSFER LOADS TO CONSTRUCTION SITES AND

SUPERVISOR AT STA DISCHARGE SAFELY

ROSA LAGUNA BIND LOADS TO CRANE

INSPECT EQUIPMENT AND MACHINERY

ENGR. JOHN KEPP AND UPDATE MAINTENANCE AND ACTIVITY LOG.

CHRISTIAN ANG CARRY OUT BASIC REPAIRS TO MACHINES

SET UP MACHINERY BASED ON COMPLEX MANUALS

PROJECT ENGINEER

C AND R BERNARDO

LINE MAN

LINE CONSTRUCTION

2009 - 2011 MERALCO (LAGUNA)

PERFORM HANDS-ON DIAGNOSIS,REPAIR AND SCHEDULED

PREVENTATIVE MAINTENANCE ON EXISTING SYSTEMS,

EQUIPMENT,FIXTURES, AND INFASTRACTURES

SERVE UNDER THE DIRECTION OF PROJECT MANAGER TO

OPERATE AND MAINTAIN HIGH VOLTAGE DISTRIBUTION

WORK ON POWER CABLES, TRANSFORMERS, INSULATORS

AND CONTROL EQUIPMENTS

PERFORMIONG ALL TYPES OF LINE WORKS AND ENERGIZED

OVERHEAD AND UNDERGROUND DISTRIBUTION AND

TRANSMISSION LINES IN ALL VOLTAGE CLASSIFICATION

EDUCATIONAL BACK GROUND

SKILLS

ELEMENTARY : STA MARIA ELEMENTARY SCHOOL (1992-

COMPUTER LITTERATE,

1996)

MECHANICAL TROUBLE

HIGHSCHOOL : FORTUNATO NATIONAL HIGHSCHOOL

SHOOTING, ELECTRICIAN,

(1996-2000)

FAST LEARNER,

MAGSAYSAY MARITIME CORPORATION (ISSUED JUNE 11

TEAM PLAYER,

)

CAN WORK UNDER

PRESSURE

VOCATIONAL TRAINING (BASIC SAFETY COURSE, MAY

2010-JUNE 2010)



Contact this candidate