JOSÉ G.
RAMÍREZ
ACOSTA
********@*******.***
********@******.***
MOBILE 614-***-****
HOME 614-***-****
https://www.linkedin.com/in/jose-
ramirez-acosta-569a3388/
OBJECTIVE
Meet and exceed client
requirement. Constantly
coordinate team work to
achieve goals. Maximize business
profit and competitiveness.
EXPERIENCE
THERMODISC EMERSON
(ONEROCK-SENSIENCE )
2021-2023
Advanced sensing technologies manufacturing.
Sensience Sensing Technologies
Global Locations Sensience
Position: Bussiness Unit Manager
2022 to Feb 2023
Mayor Achievements: 2 Bussiness units managed during transfer US-MX. Operational KPIs reached .
Position: Building FitUp Manager
2021 to 2022
Mayor Achievements: MX-US Corporate comunication stablished and 7/8 manufacturing building installations successfully completed. GRUPO PUNTO ALTO
2015-2021
ESJ / PREMET
Sheet Metal and Steel Service Center
Industrial Manufacturing
www.esj.mx
www.grupopuntoalto.com/sectores-estrategicos/sector-construccion/esj-4/ www.grupopuntoalto.com/sectores-estrategicos/sector-metalmecanico/premet/ Position: Industrial Sales Mgr./ Project Leader
2015 to 2018
Positions: Commercial and Sales Advisor
2018 to Feb 2021
New Business Segment for ESJ-PREMET.
Start up. Operation and Marketing developed .
Mayor Achievements : Increase on sales 36-65%+ vs every previous yr. Start up of Sheet Metal Manufacturing New Branch for GPA Group. MODEL ( Canvas ). CRM Tool-System Implemented.
2
KNOWLEDGE
Die Stamping design fundamentals,
Stamping Maintenance planning,
Production Planning, FMEA, PPAPs,
8Ds, 5ws, SMED. TIG Welding.
Conventional and CNCMachining.
Steel Coil Processing. Sheet Metal
Manufacturing.
SKILLS
Production Planning, Materials
Purchasing, Negotiation, Industrial
Sales.
LANGUAGE
English 90% (fluent, written and
spoken).
HOBBIES
Outdoor activities w/Family.
Running. Tennis. Go On Vacation.
Reading. TV Series since pandemia
started.
Complete production line equipment purchase savings of 30% . Lean manufacturing implementation on Sheet Metal Production Floor . 2017 98.7% OTD.
RUHRPUMPEN / Pumping Solutions and Services
www.ruhrpumpen.com/en/
www.ruhrpumpen.com/en/about/facilities/mexico
Position: CNC Production Manager
2014
CNC and Conventional Machining Areas. Production Planning, Fabrication and Tool Crib Coordination .
Achievments : Implementation of standardized work methodology PRESICION REGAL/ Metal Fabrication, TIG Welding, Assembly 2012 to 2014
Position: Metal Fabrication Chief
Develop of New Metal Fabrication Business Segment. Position: Production Manager
CNC and Conventional Machining Areas on Production Planning Coordination. Achievements : Cycle time for Metals support line reduced by 23% CAD DISEÑOS E INGENIERIA S.A. DE C.V. / Metal Stamping www.cadisa.com.mx
1995 to 2012
Position: Operations Manager 2002-2012
Responsible for areas: Production, Materials Planning, Customer Service, Quality Assurance, Tool Room, Plant Maintenance.
Representative of Company s Director for the Quality System. Mayor Achievements: ISO9001:2000 certification. Implementation of Lean Manufacturing principles on Production Floor 5S, Continuous Improvement program, Control Plans, Corrective Action Procedure (8Ds Procedure). Production Planning Schedule.SMED . Philips OTD 99.6%. OEE from 40% to 65.3%
Position: Production Manager 1997-2001
Responsible for areas: Production Floor, Materials Planning, Customer Service, Plant Maintenance.
Mayor Achievements: Consolidate work team to achieve service excellence to customer Lightolier Genlyte. Product transfer from New Mexico Stamping Plant to Chihuahua Plant. Product transfer from Yuma, Az. ( 83 PNs in 27 days ) Avoiding product moving to China. 98% OTD
3
Position: Production and Materials Planner 1996-1997 Areas: Production, Materials Planning.
Establishment of Production and Materials Planning Program High and Low Volume Stampings. Develop Mexican suppliers’ base. Position: Production Assistant and Cad Designer 1995-1996 Areas: Production and Engineering
Participate with companies’ team to improve client service. ATLATEC SA DE CV / Water Sewage Treatment Plant
1994 to 1995
Position: Maintenance Dept. Assistant
Preventive Maintenance program Documented.
METROPOLITANO HIGH SCHOOL
1992 to 1994
Position: Physics Teacher
70 students graduated.
EDUCATION
MECHANICAL INDUSTRIAL DESIGN ENGINEER
Instituto Tecnológico de Chihuahua
1991 – 1995
TRAINING COURSES / SEMINARS
Sales Seminar Canacintra (2019, 2020)
SAP (2018-2021)
BMC Business Model Canvas ( 2015-2018 )
Cluster EGE Commercial Mission (2017- 2020)
Cluster Sector Metalmecanico Canacintra Seminars (2018-2020 ) The Bullet Proof Manager (BPM 2017)
TechBA Business Acceleration Program Canada-Mexico (2011-2012) Metal Stamping Seminars (1999-2010 USA and Mexico) ISO9000 internal auditor (2005, 2007)
Industrial Safety Philips Program (2007)
4
Metal Stamping Design (2004)
AMEAC Negotiation Course (2003)
Organizational and Management Skills IMI/IPADE Institute (1999-2000) Microsoft Project (1997)
Microstation (1996)
Lightolier Supplier Development program (1995)
Autocad (1995)