UMER SAQIB MEHMOOD
Phone : 009**-*********
E-mail : ********@*****.*** / ********@*****.***
Address : P.O.Box132631 Jeddah 21382, Saudi Arabia Education
B. Sc in Electrical and Electronics Engineering, Graduated in 2003 From Near East University, Cyprus, Turkey
Diploma of Associate Engineering (D.A.E) in Electrical Technology, Graduated in 1997 from Sarhad College of Technology, Abbottabad, Pakistan. Professional Skills
Managerial Strategy and Policy Organizational Decision-Making Results-Oriented Contract Management Conference Planning/Management People Management Employment Synopsis
QA/QC Senior/Lead Engineer
Keir International (Fiber Optic and UGC High Voltage and LV Voltage Projects) Contracting Company, Riyadh-Saudi Arabia
Connection of New Al-Malqaa S/S 8278 With 132kV UGC Network Riyadh Area. MIFON8 MOI Project (Fiber Optical UGC & Communication) August 2021-March 2023
Quality Assurance / Quality Control Management Department Job Responsibilities
Involvement in Telecom Inspection
o FOC Includes Trenching & Excavation, HDPE Pipe and sub ducts Installation, FOC Cable pulling, Splicing & Termination, FOC Testing and Optiped Installation. o FOC Installation outside areas Manholes, Duct Banks & Pedestal Installation. o Tetra Radio (UHF) Including Antenna installation, Coaxial cable pulling and installation of Base Station, Testing and Commissioning.
o Fiber Optic Cable Activities including Cable Testing using OTDR and Power Meter. o Drawing Review Prior to Project mobilization.
o Closure of Punch Items (EIL)
o PMCC and Pre-Commissioning.
o Knowledgeable in Understanding Construction Drawing with logical Diagrams. o Knowledgeable in using Fiber Optic Cable Splicing and Testing Equipment, OTDR and Power Meter (EXFO), Fusion Machine (Fujikura, Sumitomo 71+C). o Computer Literate.
Quality Inspection of Telecom & FOC Activities
o Ensure that all Inspections activities will be followed as per Inspection Test Plan. o Monitor and Survey all on going activities to avoid any Violation from the Project Inspection Division (PID).
o Issue NCR for any Non-Conformance activities on site. o Ensure that all the test reports are accurate and all the attached documents are of current status.
o Prior all Inspection, Verify, inform and advise Site Engineer for any defect/deficiency in order to initiate the required Preventive or corrective actions. o Witness all the Hold Points activities (FOC Splicing and Testing, Continuity & IR Testing for Copper and Instrument Cable).
o Record all ten cable Test Results during Actual Inspection. o Ensure that Testing are Conducted by Qualified or Approved Personal and that all equipment being used are calibrated and up to date.
o All RFI Log Documents including Testing Reports for Proper and final turn- over to client.
Quality Inspection of UGC High Voltage Filed Activities o Review the Project drawings and apply contract codes, Specification and Standards o Coordinating with contractors to Resolve Quality Issues o Raising RMI’S, RFI’S, and ITP’S
o Raising NCR, ACT according to Non-Conference of Material or Services. o Prepare and Inspect Material report
o Material Procurement with the help of material department and quality inspection of material, as per company and manufacturers Specification to approve the same material to use at site o Monitor all electrical work according to client standard and specification o Installation of Tranches, Ducts Banks, HV XLPE Cable pulling and Splice Jointing with link box & GIS Cable Sealing end termination.
o Verify BOQ Item from the drawing
Supervision of Construction/Erection
o Study all technical drawings, documents and any revision there-on o Raise technical query for any conflict information with the Project technical document o Advise on construction in terms of Proper method, material reservation and optimum output of labor
o Execute the works according to the latest approved revision of drawings and instruction of authorized authorities
o Follow up of Progress Planning and arranging all its requirements. o Review the technical submittal of material and ensure its compliance with Project, ensure the operations & maintenance manuals as well as handover documents are updated with Contract specification and requirements
o Analyzing and resolving field Problems
o Supervision of Erection/Construction of all electrical related equipment’s Such as Cable Pulling, Splice Jointing, Link Box, FO Cable, FOMAR Panels, Grounding etc. o Inspection of HV 132kV XLPE cable drums for their Physical appearance, IR Test, Continuity test, cable laying, Splice Jointing, GIS Sealing end termination, grounding System to achieve Successfully Project Completion.
QA/QC EM Engineer
GE (General Electric) Grid Solutions,
Jeddah-Saudi Arabia
Bahrah-2 Bahrah Makkah,Basateen Al-Basateen Jeddah (110/13.8kV S/S) 380kV MED EXPANSION Package (JNW S/S & MDE S/S)
Sabya West, Jizan City-2, Heredah 132/33/13.8kV S/S 380kV SHQ-3 Project Shuqaiq
Quality Assurance / Quality Control Management Department Nov 2014 – April 2021 Job Responsibilities
Quality Inspection of Filed Activities
o Review the Project drawings and apply contract codes, Specification and Standards o Coordinating with contractors to Resolve Quality Issues o Raising RMI’S, RFI’S, and ITP’S
o Raising NCR, ACT according to Non-Conference of Material or Services. o Prepare and Inspect Material report
o Material Procurement with the help of material department and quality inspection of material, as per company and manufacturers Specification to approve the same material to use at site o Monitor all electrical work according to client standard and specification o Installation of Ducts Bank, Cable pulling and termination o Verify BOQ Item from the drawing
Supervision of Construction/Erection
o Study all technical drawings, documents and any revision there-on o Raise technical query for any conflict information with the Project technical document o Advise on construction in terms of Proper method, material reservation and optimum output of labor
o Execute the works according to the latest approved revision of drawings and instruction of authorized authorities
o Follow up of Progress Planning and arranging all its requirements. o Review the technical submittal of material and ensure its compliance with Project, ensure the operations & maintenance manuals as well as handover documents are updated with Contract specification and requirements
o Analyzing and resolving field Problems
o Supervision of Erection/Construction of all electrical related equipment’s Such as Swgr Panels, Protection Panels, MDF panels, Capacitor Bank, TRT, Auxiliary, Grounding TRT e.t.c o Inspection of cable drums for their Physical appearance, IR Test, Continuity test, cable laying, termination to Panel and Instrument ends, Loop Checking, Conduit above & Underground, Inspection Conductors and grounding System to achieve Successfully Project Completion, with Testing and Commissioning of all Panels.
Electrical Site Engineer at Al-Nuzha-2 Project Makkah Feb 2013 - Nov 2014 SAR UNIT, ALSTOM Grid / COGELEX AREVA Jeddah-Saudi Arabia
Job Responsibilities
i-Supervision of all electrical work indoor and outdoor Side of substation. ii-Responsible for all Installation work of Substation ( Cable tray, GIS, Basement, Switch gear, Control room, Communication room, Installation of Earthing Bus bar tape, Earthing conductors, indoor out door of substation building, assembling of Power Transformers, installation, testing, oil filling, installing of Protection Panels, Control Panels in control room, Installation of cable pulling, glanding, termination of control panels and protection panels, installation of LCC panels, installation of indoor small lighting. Installation work experience
GIS:
o Installation of Breakers for 230kV, 110kV Gas Insulated Switchgears o Installation of Bus bars disconnectors & Earthing switches o Installation of Line Disconnectors & Cable End Box o Installation of Bus bar Between the Bays
o Erection of Bus bar-VT’s, Vacuuming & SF6 GAS Filling o Installation of Cable Trays for GIS Bays
o Mechanical Checking for DS/ES & Breakers
o Erection of LCC Panels & Earthing for GIS & Platforms Transformers:
o Erection of 110/13.8kV Power Transformers
o Wheel Alignment of the Power Transformers
o Monitoring the Nitrogen Pressure in Main tank
o Witnessing Impact Recorder & Digital Shock Recorders o Moisture Content Reading & Meggering Core Earthing for Power Transformers o Erection of Radiators, Conservator & Piping
o Fans Erection & Power Connections
o Installation of HV & MV Bushings & Cable Boxes
o Vacuuming & Oil filling
o Make inspection for the Transformer Oil Test as per SEC Standards o Monitoring LV Control & Power cables Laying & Terminations Electrical QA/QC Engineer
Hamid Nazair Contracting Company Feb 2011 – Jan 2013 Jeddah – Saudi Arabia
Quality Assurance / Quality Control Department
QA/QC Power & Telecom Inspector/ Engineer
o Site survey prior to design execution to assist engineering department in case of any modifications, or extensions.
o Validation of tender drawings and reporting for any kind of mismatch or non-possibility of execution on site
o Following up approval of execution drawings and material submittal sheets prior to any electrical works
o Assuring availability of sufficient material as per quality standards o Assuring availability of sufficient manpower
o Monitoring & supervision of main contractor & Subcontractor’s work progress. o Variation Order Control
o Inspection for clearance after work execution with compliance to NFC & IEC standards o Site coordination & As-Built Drawing control
o Testing & commissioning upon project handling to the client’s representative in cooperation with maintenance department. In addition to all related documentations “Punch List, ITBC, etc…”
o Managing of a group of electrical engineers on site o Reporting directly to Project Manager, & Power & Telecom QA/QC Department service manager.
Electrical QA/QC Engineer March 2009 – Dec 2010
Mansour Al Mosaid Contracting Company
Jeddah, Saudi Arabia
QA/QC Power & Telecom Instrumentation Inspector/ Engineer Responsibilities.
o Review and Preparation of the inspection and test plan, inspection check list and methods statement for electrical (Low, Medium and High Voltage power Distribution system) and instrumentation and control submitted by sub-contractor. o Responsible of testing Pre-Commissioning of Low, Medium and High Voltage Electrical Power Distribution.
o Responsible of Methodical and Systematic routine Material Receiving Inspection, Site Acceptance Testing and final Inspection of Electrical and Instrumentation, erection and installation.
o Interpretation and application of electrical and instrumentation engineering schematics, signal
Line diagram, plans, isometrics assembly drawing, P&ID, hook up and instrument loop diagrams
o Review the project Quality Plans, shop drawings, Project Standards and engineering specification to ensure efficient execution of work. o Responsible for execution and monitoring of approved Quality plan in the field of electrical instrumentation.
o Coordinate with engineer, client and sub-contractors’ representative on daily basis to resolve any quality problems or issue.
o Conduct site supervision, surveillance, issuance of quality control instruction and non-conformance report for defined works out of Standard and specification. o Responsible for preparation and compilation of Request for inspection Mechanical Completion Certificate Report Commissioning Package and other quality related documents for project acceptance and final handover. Training in WAPDA Engineering Academy July 2007 – Oct 2008 Three months’ lab work on simulators of GT, STG, Generation Transmission and Distribution High Voltage
Test of Generator Transformer and High Voltage Switchgear. Training in KOT ADDU Power Company Aug 2006 – Feb 2007 Training Engineer in Kot Addu Electric Company
o Six-month training in electrical department at Kot Addu Electric Power Company(1600MWCCPP).Six months training in the operation of combine Clyde Power Plant from Kot Addu Electric Company.
o Good knowledge of the principle associated with combined Clyde power plant operation. o Good standard of power plant safety awareness.
I also have a practical knowledge of electrical equipment like: o Transformer and their protection.
o Generator and their protection.
o Circuit breaker.
o Isolators.
o 132kv switch yard using single breaker scheme.
o 220kv switchyard using one and half circuit breaker scheme. Skills
o MS Office
Languages
Languages
Competen
ce
Time Period
English Fluent More than 10 years.
Turkish Fluent More than 10 years.
Urdu Fluent More than 10 year.
Punjabi Fluent More than 10 years.
Professional Memberships
Professional Engineer Member of Saudi Council of Engineers. Professional Engineer Member of Pakistan Engineering Council. Availability
Available on week notice
References
Will be submitted on demand.