SUMMARY PROFILE:

More than 18 years’ work experience in Project Management and Consultant with a demonstrated history of working in the Plant Construction, Engineering review, Project Consultant and Quality Management professional at different petrochemical, oil & gas plants and buildings / Infrastructure Projects. Recently working in QURRAYAT QLW SAUDI ARABIA RAILWAYS PROJECT. (Project Consultant, Consolidated Consultants Group).

2023

BILAL AHMAD

009***********, 009***********

2/1/2023

BILAL AHMAD

Phone NO: 009**-**-***-****, 009**-**-***-****

E-Mail Address: *************@*****.***, ************@*****.*** Skype mbilalahmad64

Linked In https://www.linkedin.com/in/bilal-ahmad-32717b14/ Iqama No. 232-***-**** (Transferable)

Current Address: Saudi Arabia

Date of Birth: 25-09-1986

Marital Status: Married

Permanent Address: Faisalabad Pakistan

CAREER OBJECTIVES

To grow within an organization by applying my skills in specialized fields and giving my best expertise to attain organizational objectives. And to become part of the company where my knowledge may be applied and shared not only for my personal gain and growth but also fulfillment of the company’s goals and objectives.

SUMMARY PROFILE

I have 18+ years working experience as a Lead Electrical Engineer at PETROCHEMICAL, OIL&GAS PLANTS AND INFRASTRUCTURE PROJECTS, recently I am working with QURRAYAT LIGHT WORKSHOP SAUDI ARABIA RAILWAYS PROJECT. (PROJECTMANAGEMENT CONSULTANT) through Consolidated Consultants Group. QUALIFICATION

SAUDI COUNCIL OF ENGINEERS: MEMBERSHIP NO 235366

BACHELOR OF TECHNOLOGY (HONS) ELECTRICAL with 1st Division from Preston University Pakistan.

DIPLOMA OF ASSOCIATE ENGINEER (ELECTRICAL) with 1st Division from Punjab Board of Technical Education Lahore Pakistan. .

COMPUTER SKILLS

ASITE

Auto cad / PDF

SAP (Systems, Applications and Processing)

ORACEL

Microsoft office

EXPERIENCE

18+ YEARS (Project Management/Consultant & Plant Maintenance) Employment History:

1 QLW SAUDI ARABIA RAILWAYS PROJECT. “PMC” (Consolidated Consultants Group) Lead Electrical Engineer from June 2021 to Cont.

2 ARAMCO BACHELOR HOUSING PROJECT ROYAL COMMISSION YANBU. (ISAM KABBANI CO.) Lead Electrical Engineer from June 2020 to June 2021. 3 MARAFIQ INTEGRATED SECURITY SYSTEM. “PMC” (DAR Consultant Engineer ) Lead Electrical Engineer from Oct 2018 to June 2020. 4 YNP TI SPONGE PLANT. (ATTM) YANBU SAUDI ARABIA. (EPC - CHIYODA COR. / CTCI CORPO.) Engineer Electrical from Feb 2015 to Aug 2018.

5 IBN RUSHD (SABIC) & SAUDI ARAMCO YANBU REFINERY. (EPC - CTCI CORPORATION) Engineer Electrical from July 2012 to Feb 2015

Project work Description:

Worked Project Management and Engineering consultant as lead Engineer Electrical.

Execute the project as per SOW, international & client standard, Deliver the reliable / Operational Project.

Project EPC’s Design, Calculation and Drawings review and approved for IFC and final as built.

Material technical submittal review and approved as per project requirements and standards.

Project management with client for milestones, progress review, inspection, Commissioning and hand over.

Project site design review, Construction / inspection, Pre-Commissioning and commissioning.

Worked in grassroots project, DBN expansion plant Project, Buildings and infrastructure projects.

Maintained good professional relationships with Client, contractors, vendors and suppliers.

Manage directly and provide engineering and technical supports to all the electrical work groups at site.

Plan and execution of all electrical related works and coordinates / interface the works to mechanical and civil discipline.

Coordinate with Client representatives for any site instructions and inspection of works.

Assign targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.

Submit / review site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.

Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.

Substation equipment (HV, MV, LV), GIS, SWG, TR, LV Panel, local distribution panel UPS, Monitoring system, SCADA installation, testing and commissioning.

Site Acceptance test, relay Parameter and setting test, interlock, HI POT test, power up function test and commissioning.

Earthing and lightening system installation and testing

Lighting installation, Switch and receptacle system, illumination calculation, testing and Commissioning.

LV/MV Motors installation, termination, insulation / HI POT testing and solo run test.

Cable tray / Conduit Installation, under/above ground Cable Pulling and testing.

Fire alarm system installation, power up and Commissioning.

Cathodic Protection (SC & IC) for pipeline, tank, concrete structure installation and Commissioning.

Plant Security System (Fence camera, MW, RB, access card) installation, inspection and testing.

Telecom system (LAN, PABX, PAGA, Siren system) installation, inspection and commissioning.

Ti-in walk through and take over system by system wise to work and LOTO system applying.

Handover system walk through with owner and sub-contractor to turnover system client.

Punch clearing and verifying with owner, Commissioning support for plant operation and warranty period. 6 OLYMPIA CHEMICAL LIMITED (KHUSHAB PAKISTAN)

Electrical Engineer from Oct. 2011 to Jun 2012

7 ABU DHABI POLYMER COMPANY (BOROUGE) UAE.THROUGH DESCON ENGINEERING Electrical Supervisor from May 2009 to September 2011 8 IBRAHIM FIBER LIMITED (FAISALABAD PAKISTAN)

Electrical Supervisor from Jul 2006 to April 2009

9 SITARA CHEMICAL IND. PRIVATE LIMITED (PAKISTAN)

Trainee from Oct 2004 to Jun 2006

Maintenance work Description:

Planning and execution of preventive / corrective maintenance and daily shut down jobs Including operation, Maintenance and troubleshooting of electrical Equipment’s in live plant.

Analysis of fault and find causes of happening and eliminate cause and corrective action for future.

Working experience of Inspection, Pre commissioning, Commissioning, start up and preventive

Maintenance of electrical Equipment like HV - LV motors, Switch gear, Protection relay, motor starting cubical and VSD, Power Transformer, UPS, Capacitor banks, Crain’s etc.

Working on motor PM, Troubleshooting likes Vibration, Temperature, Greasing and bearing

Replacement.

Working on HV and LV switch gear and control gear of ABB, SCHNEIDER, AEG, SIEMENS and ALSTOM equipment.

Working on DCS control plant from electrical side (DCS HONEYWELL).

Working experience on Borouge 2 Project and work on all electrical substation Equipment testing,

Commissioning and finally power up.

Installation and commissioning on High Voltage side 11, 3.3KV Switch gear (Schneider) and Protection

And Control Relay (Sepam 80 series) and Low Voltage Side motor protection relay and cubical module

(Tesys).

Working and Well knowledge about Auto Transfer system between two HV, MV and LV Incomer.

Installation, Load Testing, Commissioning of UPS system that is for Substation and SIS (AC & DC UPS)

Gutter.

Having an experience of Commissioning, power up, programming, testing,

Maintenance, trouble shooting of VFDs. Brands ABB, Loher, Siemens, SEW Euro Drive, Danfuss,

(HV and LV Both)

Working on Electrical Heat Tracing system with Temperature Controller of TYCO THERMAL CONTROLS NV.

Working and exp. Of Power Factor Improvement on HV and LV with Capacitor Banks of DUCATI ENERGIA.

Perform Functional testing of all equipment like HV, LV Switch gear, EGD, Transformer, VSD, UPS

Operation of Power house steam turbine (5MW) and Diesel Generator with synchronized.

Worked on DCS, PLC systems by inter lock with Inverter.

Knowledge & working on Breaking of induction motors. Start and break controlling of motors through LOGO controller.

Manage the Electric Spare parts/Inventory (on Oracle Program).

Performed project work on 45MW GAS TURBINE POWER PLANT IN IBRAHIM PG-2 EACH TURBINE

HAVING 15MW CAPACITY.

Worked in Rectification process control plant.

Worked on 132KV Grid Station.