PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
RESUME
Name : Pravin Lamkhade
Name of Key Position : Lead Piping Engineer
Age : 42 Years
Total Experience : 17+ Years
Sex : Male
Nationality : Indian
English Fluency Oral / Written : Fluent
EDUCATION BACKGROUND
• B.E. Chemical Engineering (2004), Nagpur University, Maharashtra, India.
• Computer Skills: Microsoft Office, PDS / PDMS / SP3D, Smart Plant Review, NavisWorks, AutoCAD, MicroStation
HIGHLIGHTS & QUALIFICATIONS
Qualified and seasoned professional with 17+ years of experience with MNC’s in Piping Design & Engineering (FEED development & Detailed design), Engineering Coordination, Procurement Support, Design Execution & Management for Brownfield and Greenfield onshore and offshore Projects in the field of Oil & Gas, Chemical and Petrochemicals plants. KEY PROJECTS & POSITIONS HELD
Position Project Period
Piping Lead Engineer
Umm Shaif LTDP Phase-2
(Client: ADNOC Offshore (Ex ZADCO & Ex
ADMA))
Jan 2023 – Present
Piping Lead Engineer
EPC for Majnoon Central Power Plant
Project (BOC-1477)
(Client: Basra Oil Company, Iraq)
Sep 2022 – Dec 2022
Piping Lead Engineer
West to East Pipeline (WEP) FEED Project
- ADNOC ONSHORE, UAE (FEED Project)
Mar 2022 – Sep 2022
Piping Area Lead Engineer
Bab 485 MBD Sustainable Facilities Project
- ADNOC ONSHORE, UAE (EPC Project)
Dec 2019 – Feb 2022
Piping Area Lead Engineer
Bab Integrated Facilities Project – ADNOC
ONSHORE, UAE (EPC Project)
Jan 2019 – Jan 2020
Senior Piping Engineer
Train-3 of Wara Pressure Maintenance
Project for Kuwait Oil Company, Kuwait
(EPC Project)
Sep 2017 – Dec 2018
Piping Lead Engineer
Block-9 Pre-FEED project for developing
CPF for Kuwait Energy Company, Kuwait
Sep 2017 – Jan 2018
Lead Piping Engineer
Major brownfield projects (Client:
Indorama Ventures Olefins LLC, USA)
- Replacement of Economizer E-73
May 2016 – Aug 2017
Page 2 of 6
PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
- Replacement of Decoke cyclone drum
project
- New C2/C3 compressors project
- New K.O. drum project
Senior Piping Engineer
Field development studies & execution
projects for Onshore & Offshore plants
(Client: Statoil Norway)
- Njord B: FPSO modification project
- Kollsnes (Gas processing plant): PSV re-
sizing & Installation of EBVs projects
- Veslefrikk A (fixed) & Veslefrikk B
(Floating): Major field development
projects
- Kårstø (Gas processing plant):
Installation 28” & 30” ESD valves on pig
launcher & receiver lines.
- Sture (Export Oil terminal): Slop oil
header replacement project
Nov 2011 - May 2016
Piping Area Engineer
Jamnagar Export Refinery Project (JERP)
(Client: Reliance Industries, India)
Unit: Crude-III (CDU/VDU) and Alkylation
(EPC Project)
Jun 2007 – Feb 2011
Piping Engineer
REC Solar Grade Silicon LLC, Moses Lake,
Washington, USA. (Units: Silane &
Polysilicon) (EPC Project)
Project: Ras Gas Laffan Liquefied Natural
Gas Company, Qatar (Unit: LPG Phase
–II) (EPC Project)
Mar 2006 – Apr 2007
Piping Engineer
(Client: Reliance Industries, India) By-pass
arrangements for parallel preheat train in
Crude train 1 and the QYI-2 project to
increase the refining capacity to 650 KBPSD
from 540 KBPSD (Unit: Crude-I & II, Merox)
(EPC Project)
Jun 2004 – Mar 2006
DETAILED WORK EXPERIENCE
Worley, Abu Dhabi, UAE
Jan 2023 – Present Piping Lead Engineer
Umm Shaif LTDP Phase-2: (LTDP 2.1 and 2.2 - Concept Screening, Selection & Design), ADNOC Offshore.
Roles & Responsibility:
• Preparation of CTR, Design Basis, Need List, Desktop Study, Site Visit (Identifying Tie-ins and Site Routing).
• Preparation of Piping Deliverables, Review and approval of Plotplans, Piping GAD’s.
• Preparation of MTO, Participation in Design Reviews, HAZOP etc. Page 3 of 6
PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
• Preparation of Pipe wall thickness calculation, Piping Material classes, Tie-in list, Modularization study etc.
• Interdisciplinary coordination, IDCs, CAD coordination, Manpower planning, Review & develop deliverable plans, scheduling, reporting & updating progress. China Petroleum Engineering Co. Ltd., Dubai, UAE
Sep 2017 – Dec 2022 Piping Lead Engineer
EPC for Majnoon Central Power Plant Project, Basra Oil Company, Iraq
West to East Pipeline (WEP) FEED Project, ADNOC Onshore, UAE
EPC for BAB 485 MBD Sustainable Facilities Project, ADNOC Onshore, UAE
Bab Integrated Facilities Project (BIFP), ADNOC Onshore, UAE
Train-3 of Wara Pressure Maintenance Project for Kuwait Oil Company, Kuwait
Block-9 Pre-FEED project for developing CPF for Kuwait Energy Company, Kuwait Roles & Responsibility:
• Ensure compliance with codes, standards, and regulations. Review and approval of vendor documentation.
• Review and approve piping layouts, isometrics, and support details. Provide technical support during construction and commissioning. Ensure the quality and timely delivery of piping deliverables.
• Coordination & follow-up with workshare offices, provide inputs to support office to develop
& progress 3D modelling works.
• Review, development & finalization of Plot Plan drawings for PAD, MiniPAD, Wellbays and OFFPAD facility areas.
• Preparation of MRs, Datasheets (for Valves & SP items) and Vendor offer technical bid evaluations.
• Review/comments of IDC, Vendor data & drawings, Coordination with clients and other discipline engineers.
• Lead & coordinate for 30%, 60% & 90% Model reviews, tag close-outs. Preparation & issuance of Model review reports.
• Review of GA & Piping Layouts and Isometric drawings including BOM, MTO and other piping deliverables.
• CAD coordination, Manpower planning, Review & develop EDDR plans, scheduling, reporting
& updating progress.
Ingenero Technologies (India) Pvt. Ltd.
May 2016 – Sep 2017 Lead Piping Engineer
Indorama Ventures Olefins LLC, USA (Major brownfield Projects) o Replacement of Economizer E-73
o Replacement of Decoke cyclone drum project
o New C2/C3 compressors project
o New K.O. drum project
Page 4 of 6
PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
Roles & Responsibility:
• Go through & understands Scope of work and as per Scope of work prepare deliverable list, project plan/schedules.
• Review & comments on P&IDs/ Line list/ Tie-in list. Queries related Process documents to be discussed and clarified.
• Queries related scope of works to be identified and clarified to proceed further. Additional scope identification
• Check & prepare any inputs required from site. Modification scope to be confirmed from site
& Follow-up with site for mark-ups & clarification.
• Checking of vendor drawings. Discuss & prepare various options for equipment arrangement. Check piping arrangement & support requirements, Nozzle orientation checking & comments.
• New & Modified foundation clash checking, U/G interface. Modification & updating of U/G lines
• Go through Nozzle adequacy reports. Coordination with Mechanical. Checking & review of their deliverable. Issue MDS & Mechanical adequacy reports.
• Material spec selection & given it to Process. Tie-in markups given to Process for P&ID updating.
• Manpower planning to get the assigned work done. Preparation of new piping specs, review
& comments.
• Prepare & provide input to Stress. Critical line identification for Stress analysis. Follow-up & resolve stress queries. Checking & review of Stress markups & reports. Update stress comments.
• Preparation of deviations. Selection of pipe support types. Multi-discipline reviews. Resolve email queries.
• Resolve site/fabrication (RFI) queries. Pipe thickness/schedule calculations, Insulation thickness calculations
• Preparation of Material specs, MTOs, SP item datasheets, Equipment Layouts, Piping Layouts, Isometrics etc.
• Provide Stress inputs & civil inputs. Coordination with Stress & Civil group. Review of Civil & Stress deliverables.
Aibel Pte Ltd., Singapore.
Nov 2011 – May 2016 Senior Piping Engineer
Statoil V&M (Maintenance & Modification) projects (Client: Statoil AS, Norway.) o Njord B: FPSO modification project
o Kollsnes (Gas processing plant): PSV re-sizing & Installation of EBVs projects o Veslefrikk A (fixed) & Veslefrikk B (Floating): Major field development projects o Kårstø (Gas processing plant): Installation 28” & 30” ESD valves on pig launcher & receiver lines.
o Sture (Export Oil terminal): Slop oil header replacement project Page 5 of 6
PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
Roles & Responsibility:
• Define, schedule, execute, supervise and co-ordinate all activities within areas of responsibility for Feasible Study, Concept Design, FEED & Execution/Detail Engineering projects. Prepare study/concept report, Man-hrs estimates.
• Preparation & Ordering of piping & support bulk MTO, SP item data sheets, MR for Valves, Evaluation of bids.
• Conduct internal & external 3D design reviews, Participate in HAZOP's and other external reviews.
• Checking of piping isometric & support drawings, review/approve of vendor documents & drawings.
• Prepare a Material handling report, prefab, installation & demolition work packages.
• Review & checking of piping stress report, support design including special, spring support design.
• Report to Project Manager/HOD on work progress and identify critical activities.
• Ensure that vendor information required to progress the work are identified and communicated.
• Prepare, review and report overall changes and deviations to design basis.
• Prepare piping general specification inclusive of specification for piping arrangement, piping support standards.
• Exp. leading designers & engineer’s team, maintain a positive working environment within team & multi-discipline group
Bechtel Corporation JV with Reliance Industries Ltd, Navi Mumbai, India. Jun 2007 – Feb 2011 Piping Engineer
Project: Jamnagar Export Refinery Project (JERP), India. (EPC Project) o Units: Crude-III (CDU/VDU) and Alkylation
Roles & Responsibility:
• Checking and issuing Isometrics as per weekly target.
• 3D Piping & Equipment Modeling in PDS and Isometric Extractions.
• Planning and scheduling the work to meet up the weekly Isometric target.
• 2D Layout Review & Quality checking. Plot Plan development & finalization.
• Nozzle Orientation of Column, Reboilers, Condensers etc. & Review of vendor data and drawings.
• Scope of work involves detail engineering of the Pumps, Exchangers, and Vessels.
• Preparation of P&ID mark-ups.
• Pipe support selection for all lines and Updating Stress comments for critical lines.
• 3D Modeling structures and platforms for Equipment & Valve access.
• Making structural input and checking civil drawings (IDC) for clashes.
• Modeling the access way to access the required stations and equipment. Page 6 of 6
PRAVIN LAMKHADE
Lead Piping Engineer
**************@*****.***
Fluor Daniel India Pvt. Ltd., Gurgaon-12202, India Mar 2006 – Apr 2007 Piping Engineer
Project: REC Solar Grade Silicon LLC, Moses Lake, Washington, USA. (EPC Project) o Units: Silane & Polysilicon
Project: Ras Gas Laffan Liquefied Natural Gas Company, Qatar (EPC Project) o Unit: LPG Phase –II
Roles & Responsibility:
• Scope of work involves detail engineering of the Pumps, Exchangers, and Vessels.
• Piping Modelling in PDS, Isometric Extraction. Co-ordination with other departments.
• Resolving HO (Houston Office, USA) comments on Model Review. Reliance Engineering Associates Pvt. Ltd., India.
June 2004 – Mar 2006 Piping Engineer
By-pass arrangements for parallel preheat train in Crude train 1 (Brownfield project)
The QYI-2 project to increase the refining capacity to 650 KBPSD from 540 KBPSD (Brownfield project)
o (Unit: Crude-I & II, Merox)
Roles & Responsibility:
• Scope of work involves detail engineering of the pumps, Exchangers, and Vessel.
• Involved in preparation of equipment layout, piping layout, checking and issuing isometric drawings.
• Planning, scheduling the work in close interaction with operation and maintenance team to decide the nature of work.
• Allocating activities to designers and supervising. Isometric extraction and preparation of nozzle orientation.
Personal details:
• Date of Birth: 11th April 1980
• Nationality: Indian
• E-mail ID: **************@*****.***
• Languages: English, Hindi, Marathi
• Marital Status: Married
I undersigned, certifies that the information given by me is true and correct to the best of my knowledge and belief.
Yours faithfully
Pravin Lamkhade