R K D E S I G N R E S U M E S Page *
Greg D. Turner
Project Job Captain / Construction Administration
C: 623-***-**** H: 623-***-****
Greg Turner has 24 plus years of experience in the Architectural Profession as a Cad Operator and Project Job Captain it includes positions with SmithGroup in Phoenix, Az. Conoyer-Hedrick/DFD, Stafford-King Associates in Sacramento, Ca., US Federal Courthouse Building with Langdon-Wilson Architects, and most recent, The Sheraton Hotel downtown Phx, AZ w/ RSP Architects.
Responsibilities consist of producing construction documents and construction administration.
Representative Projects & Firms:
Turner Design Group LLC – Self Employed
Currently working on TI for Ladies of Grace Beauty Salon; Villicano Property Group Holmes, production of Architectural Construction Documents - elevations, site plans sections, wall sections, and details that pertain to specific project sites. Owner: 06-22- 2022 – Present
BRR Architects
Responsibilities were to provide TI for (southwest) Wal-Mart Fulfillment Centers; Duties include: TI production of Architectural Construction Documents - elevations, site plans sections, wall sections, and project punch list, and details that pertain to specific project site.
Scott Brown 05-31 -21 – 04-22
Winslow Plus Partners
112 North Central Ave
Phoenix, Arizona 85004
Kali Winslow 02-28-20 - (05-21)
John Mahoney Architect
801 E. Elliot Rd.
Tempe, Arizona 85054
John Mahoney 480-***-**** 08-28-15 to 10-26-19
Background
• University of Arizona
Student / Scholarship Athlete
• 1980 - 1985
• Anthem College School of
Architecture, Phoenix, Az.
• Architecture– Cad 1987 -
1989
• Professional Football
Experience with Houston
Oilers and USFL’s Arizona
Outlaws in 1985-1987
• Auto Cad Experience of
21 years. Most recent
programs: Currently running
Arch Desktop 2014.
• Promis Software City of
Phoenix Submittals / RFI’s
Sheraton Hotel Project, Perini
Construction.
• US Patent for an Over-the-
Cleat Ankle Sports Brace
U.S. Patent # 5,822,887
• Member: Northern Arizona
Council of Governments
N.A.C.O.G. Head Start
Program
R K D E S I G N R E S U M E S Page 2
Previous Employers:
Walters and Wolf
889 N. Colorado St.
Gilbert, Az.
Structural Curtain Wall System Designs
Dustin Gaglione 480-***-**** 05-12-13 to 08-15
RK Design and Professional Services
P.O Box 883
Waddell, Arizona 85355
Project Coordinator / Cad Draftsman
Tenant Improvements * New Residential
Robert Knighten 602-***-**** 03-10 (Present)
Pathangay Architects
Project Job Captain / Project Architect May 2008 –Nov. 2010 Project Job Captain, duties include: and production of Architectural Construction Documents - elevations, site plans sections, wall sections, and details that pertain to specific project sites. Reference: Navine Pathangay, 602-***-****
Project Highlights:
• Metropolitan Sports Complex, Glendale, Arizona
• Sri Maha Ganapathi Temple, Phoenix, Arizona
• Comerica Bank Scottsdale, Arizona
• Midwestern College Gymnasium Chicago, Illinois
R K D E S I G N R E S U M E S Page 3
RSP Architects
Project Job Captain March 2005 – March 2008
Project Job Captain, duties include: Construction Administration and production of Architectural Construction Documents - elevations, site plans sections, wall sections, and details that pertain to specific project sites
Project Highlights:
• Downtown Phoenix Sheraton Hotel
• Wells Fargo Bank (San Bernardino, Ca)
• ASU (East) Poly Science Building
• Bank of America (Tempe East)
• Desert Ridge Corporate Center – Retail Building
Reference: Joe Tyndal 480-***-****
Leo A Daly Architects, Phoenix, Arizona
Sr. Draftsman -2002 to 2005
Responsibilities: Coordinating details, building sections, plotting responsibilities, and wall sections.
Reference: Viet Dam 480-***-****
Project Highlights:
• Ft. McDowell Hotel / Casino Bee Line Highway
• Civic Plaza Convention Center, Downtown Phoenix, AZ.
•
Conoyer-Hedrick/DFD Architecture Phoenix, AZ
Senior Draftsman 1998-2002
Responsibilities: To prepare construction documents sheets; this includes all drawings that need to be referenced to the specific site. Highlighted Projects: Esplanade Condominiums, Portales Condominiums, and Zacor Corporate Center. SmithGroup, Phoenix, Arizona
Senior Draftsman 1996-1998
Responsible for construction documents sheets; this includes Details, Site Details and all other drawings that pertain to the specific site. Highlighted Projects: Brick Yard on Mill, Safeway Corporate Center, and Phelps Dodge Center.
Reference:
Jim Eulling, 602-***-****
R K D E S I G N R E S U M E S Page 4
GBMA Architects, Phoenix, Arizona
Project Manager 2002 to present on contract basics Project Manager, responsible for, coordinating all consultants that pertain to the specific project site. This includes all drawings that need to be referenced to the proposal needs. Responsibilities: To manage the Greenway Estates
Condominiums in North Phoenix, US Federal Courthouse Building and (YET) Youth Education Town, master site planning sponsored by the NFL National Football League. Reference: Emanuel Aguirre, 602-***-****
Dalco Construction Incorporated Phoenix, AZ.
Project Coordinator 2002-2003
Project Manager, responsible for all design build projects and construction documents for: JJ Rowley Center Laurel, MD and The K Street Office Buildings in Washington DC, Responsibilities: To coordinate construction documents with all engineering consultants in tow.
Reference: Paul Smith: 240-***-****
Additional Projects
• Phoenix Airport
Phoenix, AZ.
• Winslow Hospital
Winslow, AZ.
• IBM Offices Phoenix, AZ.
• Lincoln High School,
Sacramento, CA.
• Northern Arizona Auditorium
Flagstaff, AZ.
• Fillmore Center
San Francisco, CA.
• Sheraton Hotel Tallest in
Phoenix, Az.
• SHG Southwest Inc, Phoenix,
AZ.
• Kingman Hospital, Conoyer
Hedrick Architects