Mohammad Shahbaz Scaffolding & Formwork Designer
Mobile: +971-********* E-mail: *************@*****.*** Dubai-UAE Dear Sir/ Madam,
I’m pleased to apply for the position of Scaffolding & Formwork and Project Engineer in your prestigious organization. I have more than 7 years of experience in the formwork field with various reputed organizations that will help me to contribute in an effective way to the growth of your organization parallelly developing my career skills in the field of scaffolding and formwork.
Working as a Scaffolding Technical Engineer, I was recognized by management several times for my details and pressure handling attitude. I strongly feel that keeping me updated with respect to the latest formwork industry trends and best practices. I was appreciated by my manager for demonstrating strong skills in:
Co-ordinate and supervise formwork and scaffolding works, giving clear instruction to the site team to ensure the quality and compliance of erection.
skills on Back propping by actual connection with the DIN codes.
Providing calculations on wind load as per the format given by consultant.
Working with Team members to finish assignments on the deadlines set. Herewith I have attached my professional resume which will provide you with the further details about my skills, Experience and qualifications. I’m looking forward to discuss with you further on how I can contribute to the goals of your organization. Kindly contact me via email at: *************@*****.***
.
Sincerely,
Mohammad Shahbaz
MOHAMMAD SHAHBAZ
Mohammad Shahbaz Scaffolding & Formwork Designer
MOHAMMAD SHAHBAZ
SCAFFOLDING TECHNICAL ENGINEER
CIVIL ENGINEER – UNIQUE ATTOCK SCAFFOLDING
Mobile: +971-********* E-mail: *************@*****.*** Profile Summary:
Reliable Formwork builder with more than 7 years of experience in Formwork and Scaffolding field.
Experience in handling formwork & scaffolding in difficult areas.
Hand on experience with working with client directly to get the right kind of formwork & scaff. in place.
Specializes in Formwork & scaffolding for Towers, Bridges, Building & Villas.
Capable of ensuring safety by following to international safety by-laws. Education Qualification:
Technical Skills:
- Structural analysis and design software : Stadd pro
- Drawing software : Auto cadd
- Estimation costing : Quantity survey
- Office software : MS Office, MS Excel, MS Power point Year Institute Division
2015
B.TECH. (Civil Engineering) from,
AHCET affiliated Jawaharlal Nehru
technological University, Hyderabad,
India
1st
2011
Board of Intermediate from M.B.H
college, Bihar, India
2nd
2008
Board of Secondary education from
Azad high school, Ranchi, India
2nd
Mohammad Shahbaz Scaffolding & Formwork Designer
Professional Experience:
I. Duration: March 2022 – Present
Company: Unique Attock Scaffolding, Dubai UAE.
Designation: Senior Scaffolding Technical Engineer. Key Duties:
- Design of Scaffolding & Formwork for all projects and submission to client review and approval.
- Prepare AutoCAD drawings and provides static calculation using BS Code.
- Visit all sites time to time as required to solve technical issues.
- Meeting with clients to explain methods of design to take approval.
- Calculate the cost of erection and dismantling of scaffolding as per system.
- Advise supervisor to do some important changes as per site difficulties to work as per drawing.
- Maintaining all standard drawings & designed drawings of Scaffolding & formwork.
- Coordinate with supplier for Scaffolding & formwork material delivery, hiring / de-hiring.
- Ensure perfectly organized storage.
- Provide adequate instruction to the site team for scaffolding & formwork material handling and its proper use.
- Monitor utilization of scaffolding & formwork and ensure highest efficiency is achieved.
- Repair and rehabilitation of scaffolding & formwork assets on timely manner when required.
- Monitor the cost and revenue periodically and ensure good revenue is achieved on scaffolding & formwork assets.
- Projects handled:
Projects Types of Scaffolding System
Dubai Waste Management center
(DWE)
Tower, Birdcage, Buttress and Hanging
Scaffolding
Cup-lock & Tube
fitting System
Midfield Terminal Building
(MTB)
Tower, Birdcage, Buttress and Cantilever
Scaffolding
Cup-lock System
Dubai creek Harbour
-Iron Makers Steel (IMS)
Tower Scaffolding Cup-lock System
Shah Gas Development
Liftable scaffolding tower Cup-lock System
The Fields Townhouse at Meydan Tower Scaffolding Cup-lock System Emirates Commercial Tower Tower, Birdcage, Buttress and Cantilever Scaffolding
Cup-lock System
Dubai Mall_Villas 360
Contracting
Tower, Birdcage, Buttress and Cantilever
Scaffolding
Cup-lock System
Jafza One Hotel Conversion to A
Shell & Core Offices
Tower Scaffolding Cup-lock System
Mandarin Oriental Jumeirah Cantilever & Hanging Scaffolding Cup-lock & Tube fitting System
Etihad Rail Access Staircase Scaffolding Cup-lock System Mohammad Shahbaz Scaffolding & Formwork Designer
II. Duration: March 2018 – Feb 2022
Company: Besix, Six Construct, Dubai UAE
Designation: Senior Methods Engineer (Scaffolding, Formwork Design Engineer & Site Inspection Engineer) Key Duties:
- Prepare formwork and scaffolding shop drawings using the following System: PERI, RMD, SGB, DOKA and SATECO.
- Conduct scaffolding inspection on the site, ensure erect scaffolds are safe and complied as per approved shop drawings before the concrete pouring.
- Prepare bill of materials for scaffolding. Material list for Formwork site assembly and formwork panel fabrication.
- Prepare Method statement that show step by step phasing with visual sketches. And Risk assessment to define potential hazards to have a safe execution of works.
- Prepare calculation note for Slab scaffolding support and column/wall formwork design.
- Collect the information needed from site to draw the sketches that will be given to the draughtsman for drawing preparation.
- Review architectural and structural drawing and produce a complete formwork and scaffolding solution.
- Co-ordinate and supervise formwork and scaffolding works, giving clear instruction to the site team to ensure the quality and compliance of erection.
- Supervises the Methods' draughtsman.
- Prepare RFI prepare that every detail of structure is clear to avoid mistakes and revision of works.
- Review and prepare proposal for the following:
Projects handled:
Al Shindagha main bridge Access scaffolding for deck support with SGB system & piers formwork support with PERI girder system
The Royal Atlantis resort & residences Drawing & Calculation for wall with Top50 & Trio, Calculation of Elevator access scaffolding, Suspended access scaffolding, Stone cladding access scaffolding, Tunnel slab scaffolding & Cantilever access scaffolding with SGB System
SRWO plant in Jebel Ali power station Drawing & Calculation note for Columns, Slab & Access scaffolding layout.
Dubai uptown tower (81 Storey) Prepare columns formwork & Cal. Note with Peri vario GT24 girder, Access scaffolding by placing with crane for prepare rebar of columns, scaffolding load test for cup-lock standard, scaffolding layout for opening support.
Deep tunnel storm water system– Main
Tunnel
Access scaffolding layout with SGB.
Event infrastructure– Dubai Precast transfer beam scaffolding support Belhasa six construct LLC- Extension
of head office
Excavation planning & support to existing building foundation, Columns and Wall formwork support with PERI system & Slab support
Dubai Waste Management center
(DWE)
Buffer tank wall, Core wall, Staircase access & Lift table soffit, Columns, Formwork, Slab support scaffolding with PERI, Vario GT24 Girder, Climbing, SGB Cuplock, Sateco, Condor, Top50. Guggenheim Abu Dhabi Museum Planning to Logistic & Crane installation, Fencing, Existing demolition wall.
Mohammad Shahbaz Scaffolding & Formwork Designer
III. Duration: March 2016 – Feb 2018
Company: Manar Al Omran Formworks & Scaffolding UAE Designation: Formwork, Scaffolding Design Engineer & Site Inspection Engineer. Key Duties:
- Design of different types of metallic shuttering concerning different items of construction such as columns, walls, slabs, Bridges … according to BS, ACI and DIN codes.
- Generate formwork design structural analysis with the corresponding calculations for the fresh concrete pressure, against deflection, shear, and bending/flexure at all critical points/areas and externally to check for overall structural stability using STADD PRO.
- Designed Auto climbing system
- Perform coordination with all technical activities of the projects, plans, schedules, conducts, and monitors work for compliance to applicable codes, accepted engineering practices.
- Meeting with clients for clarification of relative offers submitted.
- Quantity surveying & pricing of the different systems used.
- Supervision on working jobsites and finding alternative solutions on the spot.
- Work alongside team of Engineers to ensure all stages of project are executed at the highest of standards, adhering to tight deadlines for multiple projects at a time.
- Operations & Logistics support as well as materials requirement studies. Project handled:
Orien building contracting, Paper mill -Abu Dhabi.
Al hazami building contracting, Aster hospital(formwork & scaffolding)-Dubai.
Al turath al arabi contracting, Nassima tower (slab support for dismantling & recast with basement,mezzanine, ground floor, back proping)-Dubai.
Omis contracting, Rahmania Shoping Mall-Sharjah
Al sharqan contracting, al nabaa building-Dubai.
Al Fara General Construction - (Steel waler System)
Al Sahel Mazaya Building (Steel waler System).
Delta contracing,buildibg (G+33) Dubai.
East cost contracting, Building(G+7)-Fujairah.
Apollo construction, School Building(G+1)-Fujairah.
Emirates contracting, Al dhaheri Building(G+16)-Abu Dhabi.
Fasco contracting, Building(G+5P+20)- al majaz sharjah.
Dubai down construction, Building (B+G+4P+31) Al tayer building- Wadi safa 5 Dubai.
Nazz contracting, (Done 3 building)-Abu Dhabi.
IV. Duration: January 2015 to February 2016
Company: Nashar Building Contracting, India
Mohammad Shahbaz Scaffolding & Formwork Designer
Designation: Site Engineer
Key Duties:
- Achieving construction activities like excavation, foundation, PCC, casting concrete, masonry of brick work, plastering and tiles fixing, painting up to completion.
- Inspection of form works before concreting, rebar and spacing.
- Conduct daily surveillance and civil works inspection in accordance to approved plans and standards.
- Inspection of concrete as per Indian standards and specifications.
- Checking and monitoring all incoming materials utilization as per client’s standard.
- Checking of elevations as per approved plans.
Project handled:
Construction of G+5 Building.
Key Duties:
- Preparation of estimates for initial budget proposals for the cost of the project.
- Preparation of bill of quantities (BOQ).
- Prepare site plan and retaining wall heights.
- Preparing and checking the wall alignment so that the structure does not encroach on any easements.
- Specify retaining walls appropriate to project conditions
- Inspection of form works before concreting, rebar and spacing.
- Ensure that the type of retaining walls specified are appropriate for the site condition. Project handled:
Construction of Retaining wall (30ft height).
Professional Development:
- 2016 Represented Manar Al Omran in The Big-5 Exhibition, Dubai. (Nov 2016)-Dubai
- 2014 ‘Analysis and Design of Multi storied Residential Building’ Using Stadd Pro, MS EXCEL AND AUTOCAD
- 2014 Diploma in QUANTITY SURVEY(EXCEL), From Pioneer institute-India.
- 2013 Diploma in STADD Pro, From Canter Cadd institute-India.
- 2013 Diploma in AUTO CADD from Canter Cadd institute-India. Personal Details:
Date of Birth : 12
th
May 1993
Nationality : Indian
Languages Know : English, Hindi, and Urdu
Passport Number : M5932716
Driving License : Available (UAE)
Society of Engineers : Available Member
Visa Status : Employment