continued…
Mohammadreza Gholipour
Objective: Instrument Control engineer
Education: BS in Electronic Engineering,
Duration Course: 1984 to 1988
Houston, TX 77057 346-***-****
************************@*****.***
Senior Instrument & Control Engineer
Accomplished INSTRUMENTATION / CONTROL Engineer with more than 28 years of experience in engineering of oil & gas, petrochemical in INSTRUMENTATION / CONTROL development with adherence to standards.
Expertise in INSTRUMENTATION / CONTROL engineering in oil, gas and petrochemical. Familiar with most technologies and licenses. Knowledgeable in utility and offsite units such as: water & waste water treatment, steam
& power generation, fuel gas & fuel oil, tank farm, air separation unit, instrument air & plant air & nitrogen production unit, Pipeline, Leak detection system and so on. Excellence in the Prepare electrical and control drawings with specifications as herein mentioned,
Note:
In all mentioned projects that are controlled by the DCS system, only Siemens with PCS7 (OS) iwas available in Iran In diversity projects such as oil & gas, Industrial and Energy, Professional Experience
Company name: KIAN MADAN,
Location: KERMAN SARCHESHME, Iran, Dec 2020 Dec 2022 Project: DAREZAR CONCENTRATOR COPPER PROJECT (EPC Project) Position: Instrumentation / Control Senior Engineer The project is comprised to Crusher, Stock pile, Grinding, Thickener and Overland areas. LOGIPROC company is responsible to supply control system and also review (Endorsed) the Instrumentation / Control documents which should be prepared by KIAN MADAN.
The Responsibilities was:
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Preparation of purchase engineering documents such as Material requisition documents and Technical Bid Evaluation Reports for Control system, field instruments, Bulk Material and so on,
prepare detail specifications for Process Control System (PCS) Emergency Shut-down Systems (ESD), Safe Guarding System, tank gauging system, and (F&G) Detection systems.
Held of meeting with vendors for clarification of presented offers,
Participant in SIL and Hazop meeting.
Participant in FAT & SAT.
Inspection on the Purchased and manufactured equipment
Participant in Instrumentation / Control cold / hot Commissioning in field, Company name: SAMT VA SOO,
Location: BUSHAHR, Iran, Dec 2018 Dec 2020
Project: BUSHEHR PETROCHEMICAL COMPLEX (PMC project) Position: Instrumentation / Control Senior Engineer The project is consisted to Utility and Offsite Units, HDPE, Olefins and MEG (Mono/De/Three Ethylene Glycol) SUPCON Company was responsible to supply the DCS (SUPCON ECS-700) and ESD (SUPCON TCS-900) in whole Mohammadreza Gholipour Page 2
of plant. Lead engineer was obligated to review the INSTRUMENTATION / CONTROL Documents which had been generated by JAHAN PARS (Utility and Offsite Units), SAZEH (Olefins) and CHEGALESH (MEG) Companies Instrumentation / Control teams.
Provides input to the development of engineering budget and schedule to meet requirements.
Occasional travel to client/project sites
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Leak detection system
Responsible for leading the Instrumentation / Control engineering design work on assigned projects
P&IDs
Instrumentation Index
Control Architecture Diagram
Control Narrative
Scada Systems
Communication Diagram
Wiring Diagrams
Instrumentation and Controls plans
Attending and leading client meetings
Review / Comments on other discipline prepared documents / drawing to implement in Instrumentation / Control documents,
Preparation of I&C documents / Drawings such as data sheets, layouts, logic diagrams, loop diagrams were in my responsibility in offsite area as well.
Participant in FAT & SAT of DCS.
Company name: SAEED SANAT MARUN, Oct 2014 Dec 2018 Location: Ahwaz, Iran
Project: Desalting plant development (Marun I to VI (EPC Project) Position: Instrumentation / Control Senior Engineer, Existing desalting plants of various MARUN sites to increase the desalting capacity of some plant and renovating and improvement of waste water facilities of some others. The project was included of new facilities in each site consisted to “Renovating existing desalting packages on Marun I, IV and V by adding new desalter. The Responsibilities was:
Preparation of all I&C documents / drawings such as lists, layout, data sheets, Material requisition, wiring, Architecture, Diagrams and so on.
Review / Comments of other discipline prepared documents / drawing to implement in Instrumentation / Control documents,
Held of meeting with vendors for clarification of presented offers,
Review and Development of PIDs drawings in participation of process teams,
Participant in SIL and Hazop meeting.
Responsible for leading the Instrumentation / Control engineering design work on assigned projects
P&IDs
Instrumentation Index
Control Architecture Diagram
Control Narrative
Scada Systems
Communication Diagram
Mohammadreza Gholipour Page 3
Wiring Diagrams
Instrumentation and Controls plans
Attending and leading client meetings
Senior technical resource may serve as technical advisor for team
Provides specialized technical input to studies and design for staff's specific area of expertise.
Develops study and design procedures to facilitate high quality cost effective work by others.
Participates in interdisciplinary review of project deliverables.
Participant in FAT & SAT of DCS.
Company name: PAMIDCO,
Location: TEHRAN, Iran, Jan 2010 Nov 2014
Project: GOLEGOHAR Pelletizing Plant unit II, GOHARZAMIN, KHORASAN Pelletizing plant CHADORMALLO Steel making plant, HOT DRI CHARGING, Concentrate Completion Plant (Polycom). (EPC, EP, E Projects)
Position: Instrumentation / Control Senior Engineer PAMIDCO is one of the important companies in the field of mining and steel making projects. INSTRUMENTATION
/ CONTROL Senior engineer of the mentioned projects, The Responsibilities was:
Develops construction cost estimates and estimates of technical efforts for projects.
Uses expertise in all steps of completing discipline component of PS&E package.
Performs quality control review of design calculations or drawings.
Prepares technical specification sections.
Provides input to the development of engineering budget and schedule to meet requirements.
Occasional travel to client/project sites
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Preparation of purchase engineering documents such as Material requisition documents and Technical Bid Evaluation Reports for Control system, field instruments, Bulk Material and so on,
prepare detail specifications for Process Control System (DCS PCS7) and Emergency Shut-down Systems
(ESD HIMA), Safe Guarding System and Fire and Gas (F&G) Detection systems.
Provide detail specification for tank gauging system,
Held of meeting with vendors for clarification of presented offers,
Review / Comments of other discipline prepared documents / drawing to implement Instrumentation / Control
Review and Development of PIDs drawings in participation of process teams,
Participant in SIL and Hazop meeting.
Participant in FAT & SAT of DCS.
Inspection on the Purchased and manufactured equipment, Company name: OIL DESIGN & CONSTRUCTION COMPANY Nov 2006 Jan 2010 Location: Tehran, Iran
Project: Tehran Refinery products upgrading Including :KHDS/GHDS, POWER PLANT, HYDROJEN, AMIN, LPG and UTILITY, ESFAHAN REFINERY UPGRADING & REINSTRUMENTATION PROJECT, (E Project)
Position: Instrumentation / Control Senior Engineer Mohammadreza Gholipour Page 4
The project was consisted to KHDS/GHDS, POWER PLANT, HYDROJEN, AMIN, LPG and UTILITY Units. Lead engineer was obligated to endorse the INSTRUMENTATION / CONTROL Documents which had been generated by outsource INSTRUMENTATION / CONTROL teams. The lead engineer was responsible to project manager to present all required documents for INSTRUMENTATION / CONTROL purchase engineering, erection activities and commissioning. Responsibilities was:
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Endorsement of basic documents / drawings which were prepared by others,
Preparation of all I&C documents / drawings such as Control Architecture Diagram, wiring diagrams, logic diagrams, cable list / route and so on with consider to the review of other disciplines activities,
Participates in interdisciplinary review of project deliverables.
Develops construction cost estimates and estimates of technical efforts for projects.Uses expertise in all steps of completing discipline component of package.
Performs quality control review of design calculations or drawings.
DCS, ESD, F&G Design for offshore platform,
Provides input to the development of engineering budget and schedule to meet requirements.
Occasional travel to client/project sites
Participant in FAT with respect to the “FAT procedure” document. Company name: SADRE SANAT Feb 2003 Nov 2006
Location: ILAM, Iran
Project: ILAM Petrochemical Complex Project Plant, (EP Project) Position: Instrumentation / Control Senior Engineer The project was consisted to HDPE, POWER PLANT AND UTILIT/OFF SITE PLANT Units. Lead engineer was obligated to review the INSTRUMENTATION / CONTROL Documents which had been generated by MITSUI (MES) Company INSTRUMENTATION / CONTROL teams. Since the POWER PLANT AND UTILIT/OFF SITE PLANT Units engineering have been prepared by other company, In addition to the accomplished review on the engineering in HDPE plant, the lead engineer was responsible to endorse all required documents for INSTRUMENTATION / CONTROL detal and purchase engineering, erection activities and commissioning documents in POWER PLANT AND UTILIT/OFF SITE PLANT Units as well.
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Endorsement of basic documents / drawings which were prepared by MITSUI Company (Japanese company),
Review / Comments of other discipline prepared documents / drawing to implement in Instrumentation / Control documents,
Held of meeting with vendors for clarification of presented offers,
Review and Development of PIDs drawings in participation of process teams,
Participant in SIL and Hazop meeting.
Company name: NAMVARAN Consultant Co. Jul 1996 Feb 2003 Location: Tehran, Iran
Project: Mobin petrochemical (utility & offsite), Razi petrochemical (Scada system), Pazanan and kupal gas recycle, GOL E GOHAR iron ore, Tabriz Gas Conversion Power Plant, AGHAJARI GAS INJECTION PROJECT,( E, EP, EPC, EPCC, EPCCF Projects) Mohammadreza Gholipour Page 5
Position: Instrumentation / Control Senior Engineer
Generate of Instrumentation / Control documents such as, General Specification documents (instruments, Control Systems, Instruments Bulk materials, Control room, Inspection Test Plan and so on). Calculation Sizing of valves, Instruments Data sheets, Cable list, field instrument / Electrical interface wiring diagrams, Installation detail drawings (Hook up), loop and Logic diagrams, Field instruments cable route/ Layout, Instrument bulk Material take off, Procedures (FAT, SAT) with consider to the project scope of work and supply,
Preparation of purchase engineering documents such as Material requisition documents and Technical Bid Evaluation Reports for Control system, field instruments, Bulk Material and so on,
prepare detail specifications for Process Control System (DCS PCS7) and Emergency Shut-down Systems
(ESD HIMA), Safe Guarding System and Fire and Gas (F&G) Detection systems.
Provide detail specification for tank gauging system,
Held of meeting with vendors for clarification of presented offers,
Review / Comments of other discipline prepared documents / drawing to implement Instrumentation / Control
Review and Development of PIDs drawings in participation of process teams,
Participant in SIL and Hazop meeting.
Participant in FAT & SAT.
Company name: Industrial & Engineering Kavian, Feb 1988 Jul 1996 Location: Ahwaz, Iran
Project: Production of pipe, sheet steel, (ECC Project) Position: Instrumentation / Control Senior Engineer The responsibility was:
Engineering of Demineralize Water Treatment Plant Montazar Gaem power plant Project,
Design, purchase engineering, Erection and Commissioning of Instrument and Control devices for production lines,
Education / Other information
A: B.Sc. in Instrument & Control Engineering, Jan 1988 Sistan & Baluchestan University, Iran
B: To pass successfully practical training course and receive certificate of Siemens in German (Erlungen).
In the Siemens AG:
Simatic C 1 and C2 static switching system
Simatic C3 static switching system
Simatic S3 l and S32,S5 programmable control system
Simadyn C control system
C: Participation in the FAT team work for Hardware and software of gas turbine control system (Mark VI) nuvo pignon co. in Italy.
D: To pass successfully practical training course and receive certificate In France.
In the Cerberus guinard
Fire detection system
In the HCF company:
Computer room air conditioning (Roof-top type air conditioning units)
In the CEGELEC company :
Mohammadreza Gholipour Page 6
Static VAR compensator (DIGITAL control)
TPS Equipment
VVVF Equipment
Protection and safely feature against radioactive
To receive certificates concern to works with Siemens crew In Ahwaz, E. Apart from the experience mentioned in this resume, there are also valuable experiences related to the engineering of mining, water treatment / polishing, steel making and power plant for ten years, which are not mentioned in this CV.