Post Job Free
Sign in

Painter Helper Foreman

Location:
Peshawar, Khyber Pakhtunkhwa, Pakistan
Salary:
2000 us
Posted:
March 10, 2023

Contact this candidate

Resume:

November **** Amir Hayat Page * / *

Amir Hayat

Gender: Male Date of birth: 02/02/1976 Nationality: Pakistani E-mail: *************@*****.*** Mobile: +923********* POSITION Civil Foreman

WORK EXPERIENCE

Last 22 years

Position Civil Foreman

Dates 01ST January 2018 – To Till date

Project MEYDAN ONE MALL PROJECT DUBAI, (UAE)

Employer Salini-Impregilo, Contractor, Ital

Responsibility Supervised field crew performing various surveying functions.

Implemented construction staking for buildings and foundations. Position Civil Foreman

Dates 09th September 2014 – 30th September 2017

Project RED LINE NORTH UNDERGROUND METRO PROJECT DOHA, (QATAR) Employer Salini-Impregilo, Contractor, Italy

Responsibility & 6.17ø Meter excavation of tunnel with 4 Tunnel Boring Machines Profile Length of tunnel excavation approximately: 23 km

Tunnel guiding system VMT and Gyro Survey

Number of Stations: 7

Number of Cross Passage: 20

Number of Emergency exit: 3

23 Km concrete tunnel invert

Position Civil Foreman

Dates 28 th January 2010 – 31st May 2013

Project STRATEGIC TUNNEL ENHNCEMENT PROGRAMME PROJECT (U.A.E) Employer Salini-Impregilo, Contractor, Italy

Responsibility 26 Km, 7 ø Meter excavation of Sewerage tunnel with 5 Tunnel Boring Machines using the latest tunnel guiding system VMT and Gyro survey.

10 Nos Vertical shafts excavation having depth 50 Meters to 90 Meters.

26 Km concrete tunnel lining 5 Meters to 5.5 Meters dia.

Surface monitoring of roads, bridges etc. above the tunnel alignment. Position Civil Foreman

Dates 15 th July 2005 – 30 th September 2008

Project KARAHNJUIKAR HYDROELECTRIC PROJECT, (ICELAND) Employer Salini-Impregilo, Contractor, Italy

Responsibility Project includes 50 KM Tunnel with Tunnel Boring Machines (3 No), with successful Breakthrough and 10 Km Traditional Drilling / Blasting.

The Dam with 10 Million m of Fill, Spillway, Face Slab Intake Structures and Bottom outlet.

Diversion Tunnels T1 and T2.

Using Tunnel Guidance System (ZED261) for TBM,

TMS Leica for Measurements of Profiles Setting outs. July 2017 Raja Hasrat Ali Page 2 / 2

GPS 500 for performing different survey tasks

Processing of Data on the computer using Different Survey / Engineering Software’s and PC Instrument interface

Position Civil Foreman

Dates 20 th May 1996 – 30 th August 2003

Project GAZI BAROTHA HYDROELECTRIC PLANT PROJECT (PAKISTAN) Employer a JV of Impregilo SPA, Ed-Zublin, Nazir & Company &Sadullah Khan & Brothers. Responsibility Developed and used system to Control Concrete Lining,

Filter and trimming Machines (Line and Grade) using latest instruments, EDUCATION AND TRAINING

Surveying Diploma - (Two Years)

(Session 2012 - 2013)

Modern institute of technology Islamabad, Pakistan Secondary School Certificate

(Session -1995)

Board of intermediate and secondary Education Lahore, Pakistan Familiar with most of Engineering / Surveying Software's, Latest Surveying Instruments, GPS



Contact this candidate