Fidel M. Esquivel
Mobile Number: +63-917-***-****
Email Address: **************@*******.***
SUMMARY OF SKILLS Over 34 years of extensive and combined work experience with the project management consultants (PMC); engineering, procurement and construction (EPC); and general contractors; An operations professional with strong and competent know-how on site management; Manage and interact on interface issues involving with different disciplines, contractors and/or authorities; Administrative competence, management and supervisory skills in handling the multi-national workforces; Appropriate on quality inspection and broad understanding with the HSE standard rules and practice; Proficient in oral and written communication skills; Computer literate in microsoft office.
PERSONAL INFORMATION Birth Date: 15 June 1964
Nationality: Filipino
Residence Address: Block 8 Lot 21 West Beverly Hills, Langkaan I
Dasmarinas City, Cavite – Philippines
PREFERRED JOB Project Construction Manager, Section Manager, Construction Superintendent
Capacity: Project Management Consultant (PMC)
WORK EXPERIENCE I. Foundation Engineer (EPC) Mar. 2022 to Oct. 2022
Siemens Gamesa Renewable Energy (SGRE)
Project: 160MW Balaoi and Caunayan Wind Farm
Ilocos Norte – Philippines
Overseeing foundation works that includes bored piling, anchor bolts cage setting, reinforcing bars, form works and concreting procedures. Certify that all quality control measures are followed in accordance with the approved design and specifications. Report any non-conformance activities and/or observation and monitor the corresponding corrective actions. Attend the client meetings and pre-work toolbox meetings as required. Responsible for the quality assurance of the construction of the wind turbine foundations. Ensure the compliance with all quality requirements from customer contract and SGRE management. Ensure that detailed quality control process and procedures for fulfilling customers quality requirements are being followed. Inspect and certify the completed foundations and hardstands to the client (Balance of Plant) are compliant and acceptable. Able to accept the WTG foundation correctly in accordance with the Good Wind Industry Practice for the mechanical installation.
Concurrently prepare and submit weekly progress update and weekly quality report.
II. Construction Manager (EPC) Mar. 2020 to May 2021
ERS Energy Sdn Bhd
Project: 63MWp GIGASOL3 Solar Power Plant
Zambales – Philippines
Manages and coordinates all on-site construction activities and enforces compliance with contract requirements; Reviews and finalizes the master schedule prior to submission and approval; Implements the project construction execution plan; Provides technical leadership to the team; Has general knowledge of all disciplines of construction and able to stand in for each lead discipline; Monitors and reports on construction productivity and schedule performance; Manages the compliance of the works in accordance with design, budget, quality and schedule; Monitors all extra work authorization, back charges, supplier and subcontractor progress/final payment requests; Ensures the compliance of the site with HSE standard rules and practices; Reviews and finalizes the technical progress updates and reports; Manages the close out of all punch list items and documentations.
III. Civil Section Manager (PMC) Sep. 2017 – Aug. 2019
AECOM Philippines, Inc.
Project: Republic Cement Plant Upgrade
Bulacan and Iligan City – Philippines
Engaged in the overall civil and structural works site management of the project; Builds and maintains a good team spirit within the project team, client and contractors; Manages the interface issues with other disciplines and authorities; Manages and coordinates issues on design, constructability, long-lead materials, engineering, inter-contractor coordination, safety (HSE), etc.; Manages and reviews the construction schedule with advance progress planning for implementation; Manages the compliance of the works in accordance with design, budget, quality and schedule; Manages the submission of all technical progress and status reports; Ensures compliance of the site with HSE standard rules and practices; Chairs regular site coordination meetings; Manages the updated issuance of technical information, drawings, and details; Manages and reviews of site documentations such as concession requests, field design changes, technical queries, variation orders, site instructions, method statements, etc.; Ensures and monitors the availability of the contractors’ resources and logistics; Manages the close out of all punch list items and documentations.
IV. Project Construction Manager (PMC) Apr. 2016 – Sep. 2017
Prompt Managers and Construction Services, Inc.
Project: Urdaneta SM City Mall / Clark Quest Hotel Renovation
North Luzon – Philippines
Manages and coordinates all on-site construction activities and enforces compliance with contract requirements; Provides technical leadership to the team; Manages the interface issues with all disciplines and authorities; Manages and coordinates issues on design, constructability, long-lead materials, engineering, inter-contractor coordination, safety (HSE), etc.; Reviews the construction schedule for implementation and manages the advance progress planning; Manages the compliance of the works in accordance with design, budget, quality and schedule; On time submission of all technical progress and status reports; Ensures compliance of the site with HSE standard rules and practices; Chairs regular site coordination meetings; Manages the updated issuance of technical information, drawings, and details; Manages the site documentations such as concession requests, field design changes, technical queries, variation orders, site instructions, method statements, etc.; Ensures and monitors the availability of the contractors’ resources and logistics.
V. Deputy Civil Manager (EPC) Dec. 2014 – Dec. 2015
Fives FCB
Project: Republic Cement Plant Horomill Grinding
Bulacan – Philippines
Engaged in the overall civil works/site management of the project; Provides technical leadership to the team; Manages interface issues with other disciplines and authorities; Guiding the contractors concerning the contractual/construction matters; Reviews the construction schedule for implementation; Manages the compliance of the works in accordance with design, budget, quality and schedule; Manages advance progress planning and program; Manages submission of all technical progress and status reports; Ensures compliance of the site with HSE standard rules and practices; Chairs regular site coordination meetings; Manages updated issuance of technical information and details; Manages site documentations such as concession requests, field design changes, technical queries, variation orders, site instructions, method statements, etc.
VI. Construction Supervisor (EPC) Mar. 2011 – Jun. 2013
Fives Solios – PSA 2000 c/o SPIE OGS
Project: Aluminum Smelting Plant
Ras Al Khair – Saudi Arabia
Engaged in the overall site supervision, inspection, coordination and monitoring of the civil and structural works of the project; Keep familiar with consistent interpretation of the plans and specifications; Ensures the compliance of the works with design, budget, quality and schedule; Detailed planning, interfacing and coordination of construction activities;
Analyzes construction schedule and look-ahead program for effective implementation;
Ensures the availability of resources and logistics; Resolves technical problems and difficulties encountered during construction phase; Consistent coordination with other disciplines to avoid conflicts on installation process; Awareness of HSE standard rules and practices; Prepare and submit progress updates and reports; Participates with the Project Completion System (ProCoSys) inspection to identify punch list items for immediate rectification; Red markings on as-built drawing.
Other Duties Rendered (mechanical works supervision):
oErection of gas collector and booster fan ducting (inlet & outlet)
oFilter bags, cages, and blow pipes installation in the filter modules.
oInsulation works, etc.
VII. Civil Superintendent (EPC) Aug. 2010 – Mar. 2011
Kentz Engineers and Constructors
Project: LNG Central Processing Facility
Al Uqlah – Yemen
Engaged in the overall civil works/site management of the project; Provides technical leadership to the team; Manages interface issues with other disciplines and authorities; Guiding the contractors concerning the contractual/construction matters; Reviews the construction schedule with advance progress planning for implementation; Manages the compliance of the works in accordance with design, budget, quality and schedule; Ensures the availability of contractor’s resources and logistics; Initiates the submission of all technical progress and status reports; Ensures the updated issuance of technical information and details; Monitor and coordinates the site documentations such as concession requests, field design changes, technical queries, variation orders, site instructions, method statements, etc.; Ensures the compliance of the site with HSE standard rules and practices.
VIII. Civil / Structural Supervisor (EPC) Jun. 2008 – Jun. 2010
Fives Solios c/o SPIE OGS
Project: Aluminum Smelting Plant
Mesaieed Industrial City – Qatar
Engaged in the overall site supervision, inspection, coordination and monitoring of the civil and structural works of the project; Keep familiar with consistent interpretation of the plans and specifications; Ensures the compliance of the works with design, budget, quality and schedule; Detailed planning, interfacing and coordination of construction activities; Analyzes construction schedule and look-ahead program for effective implementation; Ensures the availability of resources and logistics; Resolves technical problems and difficulties encountered during construction phase; Consistent coordination with other disciplines to avoid conflicts on installation process; Awareness on HSE standard rules and practices; Prepare and submit the progress updates and reports.
IX. Project Construction Manager (PMC) Feb. 2008 – Jun. 2008
JA Construction Management, Inc.
Project: ETON Centris IT Building (12-storey)
Manila – Philippines
X. Civil Supervisor (EPC) Jan. 2007 – Jan. 2008
Chiyoda-Technip Joint Venture (CTJV)
Project: QG II LNG Plant Expansion (QGX)
Ras Laffan – Qatar
XI. Civil Supervisor (EPC) Dec. 2005 – Nov.2006
Japan Gas Company (JGC)
Project: Dolphin Energy LNG Plant Facility
Ras Laffan – Qatar
XII. Senior Director – SAVP Mar. 2004 – Dec.2005
AMA Computer College (International School)
Project: School Campus Building
Manila H.O. – Philippines and Bahrain campuses
XIII. General Manager (Proprietor) Aug. 2001 – Mar.2004
FM Esquivel Construction
Project: S & R Price Membership Shopping Center (3 branches)
Residential units and Office fit out
Manila – Philippines
XIV. Project Construction Manager (PMC) Jan. 1995 – Dec. 2000
Jose Aliling and Associates
Project: Shang Tower (38-storey), AMA Tower (37-storey), CitiBank Tower (32-storey), B.S. Aquino Center (4-storey), Military Housing (5-cluster of 5-storey buildings)
Manila – Philippines
XV. Project Engineer (contractor) Sep. 1993 – Oct. 1994
Capricorn Construction Co.
Project: Micronesia Mall Structural Repair, Residential-Apartment units
Guam, M.I. (USA Territory)
XVI. Building Works Engineer (PMT) Oct. 1990 – Oct. 1992
Shangri-La Properties, Inc.
Project: EDSA Shangri-La Mall (6-storey) & EDSA Shangri-La Hotel (22-storey)
Manila – Philippines
XVII. Junior Engineer Aug. 1986 – Sep.1990
Philippine National Construction Corporation
Project: Fleet Exchange Mall & U.S. Military Point Wharf (at US Naval Base)
UEPH Building, Cope Thunder Building & POL-Ops Facility (at US
Clark Air Base)
US Naval Base / US Clark Air Base Facilities – Philippines
PROFESSIONAL ORGANIZATIONS Member, Philippine Institute of Civil Engineers (PICE)
Member, Water Environment Association of the Philippines, Inc. (WEAP)
Member, Philippine Association of Building Administrators (PABA)
EDUCATION Bachelor of Science in Civil Engineering
Araullo University, Cabanatuan City – Philippines
March 1986
TRAINING/SEMINAR’S ATTENDED
1.Basic First Aid / Heart Saver CPR & AED
Sponsored by: Fives Group / Almana General Hospital
Al Khobar, KSA
2.Work Safely At Heights
Sponsored by: Marine and Offshore Global Pty. Ltd.
State of Qatar
3.Managerial Effectiveness Training
Sponsored by: AMA Education System
Quezon City, Philippines
4.Project and Construction Management
Sponsored by: Jose Aliling and Associates
Quezon City, Philippines
5.Wastewater Treatment Process Design and Equipment Selection
Sponsored by: Water Environment Association of the Philippines
Quezon City, Philippines
6.Structural Concrete Repair
Sponsored by: Master Builders Technologies
Guam, M.I. (USA Territory)
7.Contractor Quality Control / Contractor Inspection System
Sponsored by: ROICC-USN, Southwest Pacific
US Naval Facility, Subic Bay, Olongapo City
Philippines
REFERENCES (available upon request)