Madan M. Kamboj Page * **/**/****

Madan M.Kamboj

#** ******* ********* **.

Kenner, LA 70065

504-***-****

advlid@r.postjobfree.com

Qualifications

● More than 40 years of experience managing general civil projects, drainage, utilities, highways &

bridges, buildings, water and sewer treatment plants, parking garages; project design, construction and

project monitoring.

● Team management experience supervising, a group of engineers, technicians, cad operators and inspectors on major design and construction projects with multi million dollar budgets.

● Introduced and implemented Teflon-Stainless steel bearing and strip seal joints, which was a first in Louisiana at N.O. Airport six lane enplaning bridge structures.

● Designed and construction of 3,000 car garage with post-tensioned spiral ingress and egress ramps with 95 ft. diameter, which was first in South East United States in 1985.

EDUCATION:

Master's Degree M.S.C.E. 1978: Structures/ Soil mechanics, GPA 3.7, Tulane University.

B.S.C.E. 1967: Civil Engineering, Punjab Engineering College, affiliated with Punjab University.

TRAINING:

Design of Multi-Level Parking Garages, University Of Wisconsin: one week course, 09/1983.

AASHTO: LRFD Design Course, Louisiana Research center, Baton Rouge, LA, one week course 02/1995.

Hydraulic Design of Highway Culverts, Auburn University Research center, Birmingham, Alabama: one week course, August 2001. Soil Stabilization with Un-hydrated lime and Study Of C.B.R. Improvements with time, Central Road Research Institute: Six week course.

AWARDS:

Honorable Mention, for Design of 3000 car garage, at New Orleans 1

Madan M. Kamboj Page 2 12/27/2007

International Airport by International Municipal Parking Congress.

LICENSES/CERTIFICATES:

LA Board of Registration of P.E.& L.S. - 1978, License No. 16196 N.C.E.E., Clemson in South Carolina, Record No.23571. OTHER INFORMATION:

ACI Louisiana Chapter: Vice President, Secretary & Treasurer 1986-1990, A.C.I.; National member since 1984; A.S.C.E. member since 1978; Louisiana Engineering Society member since 1982. Work Experience :

9/01/2013 to Present : Design & Construction Monitoring with New Orleans Area architects and Engineering firms on various commercial, industrial, multi family housing and educational institutional projects.

09/25/2006 to 08/30/2013: Senior Project Manager with Julien Engineering & Consulting a prominent New Orleans firm. Design & construction management of C.J.Peete Housing Project

$183 Million - 460 Units,Imperial, Tchoupitoulas & Ogden Multi-Family development, Total 150 units each.

Walnut Square development in E. New Orleans, LA., 220 Units. Dillard University, Stern & Rosenwald Hall Improvements. 04/15/2004 to 09/15/2006: Senior Project Manager, Delon Hampton

& Assoc., Atlanta GA.

Design of intake structures for Clear Creek & Tanyard C.S.O. projects. Design of 6.5 mile four lanes of US-1 /US-4 in Toombs County GA. Project management and design of UV treatment upgrade for Big Creek Waste Plant for Fulton County.

04/09/2003 to 10/09/2004: Project Manager/ Senior Civil Engineer, N-Y Associates Consulting Engineers, Metairie, LA 70002.

Planned E.I.S. documents for $135 million, Florida Avenue bridge crossing over InterCoastal Waterway, in New Orleans LA. The main span for the crossing is 450 ft with side spans of 275 ft. each, the clearance over the channel is 156 ft. vertical and 350 ft. horizontal. Multi-directional interchanges at Alvar Street/ Poland Ave., Caffin Avenue and Tupelo Street.The roadway continues in to St Bernard Parish and ties at-grade to Paris Road (LA 47).

My responsibilities include line and grade studies, public input for E.I.S. document, plan profile of various alternates, cost estimation, utility relocations, right-of-way studies, traffic, noise impacts, and maritime traffic studies for movable and fixed span bridge structures. A portion of preliminary plans was done and project will move to Final Plans after the award of Coast Guard permit.

2

Madan M. Kamboj Page 3 12/27/2007

06/15/2001 to 11/15/2003: Senior Project Manager,

B & E Jackson Engineers, Atlanta, GA.

Planning and preliminary design for rerouting I-285 with twin tunnel structures under proposed New Runway V and related Taxiway 10-28 at Hartsfield Airport. Planning and preliminary design for I-285 from Riverdale Road (GA 139) to Lake Mirror Road, detailed construction sequence, traffic detours, and construction estimation. Project Const Cost: $ 160 million. Consolidated Rental Car facility planning, preliminary design for people movers, parking garages and maintenance facilities for all rental carriers at Hartsfield airport.

Concourse E planning and preliminary design for land side at-grade and elevated access at the airport, improvements to Airport Blvd. Roadways, ramps and retaining wall structures, geometry and profiles, drainage and utility relocations. Project Const. Cost: $ 182 million.

09/15/1999 to 09/20/2000: Supervising Engineer/Project Manager: Burk Klienpeter Inc. Consulting Engineers, New Orleans. Worked twice for this employer during above periods and again from 4/09/1994 to 06/15/1996.

Description of duties and worked accomplished is combined in the following paragraphs.

Design of sewer and water treatment projects including clarifiers, contact chambers, secondary treatment chambers, sludge digesters, silting basins for N.O. Sewer and Water Board and Jefferson and St.Bernard Parishes.

Design of industrial building for cargo containers at Chalmette Storage complex at Old Kaiser Plant site

Design and supervision over engineering-interns, technicians and cad operators for I-10 and I-610 multi-directional Interchange for LA DOT., design involved column and pile bent substructures, prestressed girders, steel plate girders, roadway slabs, approach slabs and retaining walls. Project Const. Cost: $ 32 million.

06/15/1997 to 09/10/1999: Civil & Structure department head: Richard C. Lambert Consulting Engineers, Mandeville LA. Construction Management for Coca-Cola Complex in Jefferson Parish; General civil, utility relocation and drainage design; Construction management for Woodlawn Avenue & West Metairie Avenue in Jefferson Parish.

Arterial street roadway, geometry & drainage design for Mounes 3

Madan M. Kamboj Page 4 12/27/2007

Ave; Extension and Transcontinental Drive in Jefferson Parish. Structural design, utility relocation for Claiborne Avenue US 90) for underground drainage flumes, multi-cells up to 28 ft. x 15 ft deep. Const. Cost: $32 million.

06/09/1990 to 04/10/1994: Project Manager/Supervising Engineer: David Volkert Consulting Engineers, Metairie LA. Lead a team of engineers, technicians, cad-operators, and construction inspectors for the following projects. East-West taxiway 6,800 ft and 75 ft wide, for New Orleans International Airport; Sewer Treatment Plant for Lorton, Virginia, Const. Cost: $32 million. Design of 800 car, five level, Parking Garage for Ed-Simms hotel in Mobile, Alabama. Design of US-51 overpass structure & approach roadway in Hammond, for LA D.O.T. Design of 12.5 mile four lanes of US-61, for M.DOT Natchez Mississippi.

References: Furnished on Request.