Post Job Free

Resume

Sign in

Project Manager Site Engineer

Location:
Orlando, FL
Salary:
4.000
Posted:
February 20, 2023

Contact this candidate

Resume:

Nevzat ERCANLI

Gsm:+1-407-***-****

e-mail:advgbl@r.postjobfree.com

Address:**** ******** **.*******,*******

Birth Date 1966

Marital Status : Married (1996)

Graduation : Yıldız Teknik Unv. / Istanbul

Department : Civil Engineering

Graduation Date 1987

Foreign Language : English

Military Service : Completed, 1989

Experiences:

2008 December-2021 December: CAN Engineering and Architecture Ltd. Co, Turkey, Libya, Tunisia, Iraq Project Manager &Coordinator

• New Tripoli Airport Project Precast Beam Production,(10.000 Beams in 10 Months)

• Renewing and New Construction Oil Service Stations all Around the Libya for Al-Rahila oil Service Company, Libya

• New Enfidha International Airport, Souse/ Tunisia, Prefabricate Manufacturing Works Precast Wall Facade, Channel Production and Installation.

• Hotel Project 11 Floor, 7.920m2(4 star) Erbil-Iraq 2006 August-2008 December; mra Construction Co, Libya/Benghazi Project Manager

• Libya-Benghazi Supplying and Installing Main Sewage Line Project, DN200 to DN1600 GRP and UPVC Gravity Lines 34.000 meter, DN1000&DN1600 Pressure Line, 12.000 meter,

DN500, DN1000&DN1600 Micro Tunneling Pressure Line, 4.000 meter 2005 July-2006 July; STFA Construction Co, Libya-Jufra Region / Hoon City Project Manager

• 700 Houses Unit,

• Hoon City Infra Works (Sewage 97 km + Water Network System 97 km)

• 9000 m3 Water Tank +Pump Station

• Sewage Treatment Plant +Remote Pump Station

• Service Buildings; Municipality, Culture Center, Super Market, Souk,4 Schools

(High, Kinder Garden and Primary).

2004 Agust-2005 July: Dema-Adil Ozkul JV Afghanistan-Kabul / Bagram Project Manager

• Runway +Fighter Apron Construction

Ammunition Supply Point Construction

2002-2004 Agust: Can Engineering–Architecture–Construction and Tourism Investment Ltd. Co. Project Manager,

• Perpa Trade Center B Block Marble Floor Work 14,500 m

• Modification and Full Decoration of 25 Noter in Perpa Trade Center

• Decoration of Monosan A.Ş. General Management Building,

• Additional Storey and Steel Roof Construction of Uğurlu İplik Istanbul 1680 m

• Perpa Trade Center Meeting Room Light Works 1400 m

• Evkur Electric Warehouse Construction and Asphalt Covering,

• Ataköy, 2 Penthouse Construction and Decoration, 1997-2002 Management of Perpa Trade Center A Block Turkey-Istanbul, Technical Manager

2500 Shops

• Coordination, organization and control of Sewer – Heat – Potable Water Systems – Security – Cleaning – Garden Maintenance and Decoration – General Construction and Isolation works.

• 20.000 m Steel Roof Construction

• 36.000 m. Pavement Maintenance

• 24.000 m. Road Maintenance

• Construction and Management of 4500-Capacity Parking Lot

• Maintenance and Management of 6 Loading Lifts

• Maintenance and Management of 12 Lifts

• Building and Management of 25,000 Kw Generators.

• Building and Management of Sport Complex for 300 people 1996-1997 Evyap Soap Factory Turkiye-Istanbul

Site Manager

• Building of Reinforced Concrete and Steel Warehouse of 40,000 m 1994-1996 STFA Construction Co. Pakistan, Indus Highway Construction 196.00 Km. Construction Chief

• 980 Pieces Structure Works ( Under and Over Passes, Bridges, Culverts )

• 40,000 m Drainage line construction

• 600,000 m Rip-Rap Construction

• 2000 m Mini Pile Installation

• 240 Pre-cast Beam construction and Assembling

• 196.00 Km Earthwork

• 196.00 Km Asphalt Covering

1989-1994 IGL – STFA – JV Istanbul, Kinali-Sakarya Motorway Km: 10+000 – Km: 96+000 Department (Section Chief) Engineer

• Structure Works ( Under and Over Passes, Bridges, Culverts )

• Drainage;

30,000 m Drainage and Collector Construction

2,700 m Horizontal Collector Construction

60,000 m Open Channel Construction

16,000 m Mid-way and U-Channel Fitting

• Structure Derivation Construction,

• Structure Protection Stone Cover Construction,

• Arrangement of Parking Lots (8 pcs)

• Construction of Elongation and Isolation Joints of Bridges and Viaducts.

• Application of Fittings of Cracks in Asphalt

• 1.250.000m3 Earthwork

• 950.000 Ton Asphalt Covering,

1987-1989 IGL – STFA – JV Istanbul, Kinali-Sakarya Motorway Km: 10+000 – Km: 96+000 Site Engineer

• Pre-cast pre-stressed Beam Production and Installation, L =14.00 m – L = 37.00 m h = 1.20 m – h = 2.00 m 1930 pcs.

• Management of Pipe Factory ( 100 ~ 1400, Production of concrete pipe w/o reinforcement ~200,000 pcs)

• Installation of Site and Buildings (Office Buildings, Dormitory, Concrete Plant, Cracking- Sieving Plant, Plant-mix etc.)



Contact this candidate