Academic Credentials

B-Tech Degree in Electrical and

Electronics Engineering –2013

- Cochin University of

science & Technology.

- Grade: First Class

.

License & Training

- Engineering & Consulting

officers accrediting

committee Registered

Engineer-Reg No:24034

- QCDD, General

Directorate of Civil defense

Approved Engineer

- Certificate Training in

AUTOCAD -Certification in

- Strategic leadership and

Management from Marian

international institute of

management.

Profile

Graduate Electrical Engineer with 8 years of experience in the Building/Infrastructure Construction Industry and Operation & Maintenance. Delivered Engineering and Management skills for the Metro, residential, stadium and Qatar armed forces projects with timely/early achievement of assigned goals, lead teams efficiently and utilized resources to meet targets. Looking forward to taking up new assignments with wider responsibilities in more challenging environment towards the progress of an organization. Professional Summary

• Comprehensive experience in Engineering, Execution, Project Monitoring & Controlling, Estimation, Testing & Commissioning and Project handing over.

• Having exposure with quality system, vendor evaluation, technical evaluation, Coordinating with clients and consultants.

• Experience in operation & Maintenance of 110/11KV substation.

• Experienced with quality control activities involved in installation and commissioning of various Electrical systems.

Experience

June 2020-Present

Electrical Project Engineer, Rational Trading & Contracting WLL Projects:

• Qatar Emiri Signal corps new camp project Sailiya

• Modification works at Khalifa International Stadium for FIFA 2022 Requirements.

Responsibilities

• Analyzing technical drawings, interpreting specifications, preparing/reviewing shop drawings, and determining the electrical requirements and quantity take-off.

• Provide work schedule and technical assistance and monitor proper implementation of work at site.

• Coordinate and undertake the interpretation and review of system drawings to identify any difference to contract BOQ and rise enquires against the bill of materials, drawings, and specifications.

• Preparation of cost Estimation and Variation order for the change of scope in a given project.

• Preparation of inquiries and analysis, evaluation, preparing a comparison of quotes received, and negotiation on the lead time, cost

& quality of products for the selection of materials, supplier/ vendor required for the execution of the project & procurement within the estimation, specification, and client requirement. Key Skills

- Project Management

- Leading a Team

- Excellent oral & written

communication

- Organized & Determined

Personal Details

Gender : Male

Date of birth : 14-12-1991

Nationality : Indian

Marital Status : Married

Document Details

QID Number: 291********

Visa Status: Transferable

NOC: Available

Passport No: U0234087

Passport expiry: 03-10-2030

Languages Known

English

Hindi

Arabic

Malayalam

• Preparation of Material request, Purchase order and Letter of intent

(LOI) etc. for the procurement of Materials required.

• Define and maintain documented category and supplier strategies using market and competitive data.

• Liaise with suppliers on delivery schedule to ensure on-time deliveries

• Preparation of method of statement, ITP, Material submittals inspection requests, MIR, RFI, NCR Close out and project handing over documents like O&M Manual, Training manual, As Built etc.

• Monitor and record daily, weekly, and monthly activities until the full completion of project

• Supervise and installation of all electrical systems at site such as LV & ELV (Fire alarm, PAVA, Master Clock, ACS and SMA TV) and ensure all works are carried out in accordance with the approved construction drawings, contract documents, project specifications and all applicable legal standards.

• Conduct testing and commissioning of the equipment/ system installed.

• Attending regular meetings (on work progress, coordination, design, etc.) with Main Contractor and Consultant to discuss key issues related to the project and take effective corrective actions.

• Prepare tender cost summaries including equipment, materials and labor calculations for final approval as per company’s pricing format.

• Scrutinize the whole tender package, attend pre-tender site meetings site visits, keep record of all the addendums, tender bulletins and add the changes accordingly in the quotations.

• Evaluation & Preparation of site running account bill (RA Bill) & Submit to Main Contractor for monthly payment.

Aug 2019-April 2020

Electrical Engineer, JPAC JV (CONSPEL and J&P JV)

Projects: Education City Stadium

May 2018 -May 2019

Electrical Engineer, ALYSJ JV

Project: Qatar Integrated Rail, Gold Line Under Ground Responsibilities

• Supervise and Execution of all kinds of electrical installations at the site.

• Closely monitor site activities to ensure the quality of works is in compliance with client requirements, good construction practice and compliance with shop drawing.

• Prepare inspection requests, Method statements, ITP, test reports and test packs for testing & commissioning activities at site.

• To conduct inspection of all ongoing activities for electrical installation and to conduct inspection for all electrical materials delivered.

• Perform pre commissioning tests for energizing and coordinate with vendors for commissioning of MCC, SMDB, VRF System, AHU, Motor starter panel and Smoke fans.

• Perform Stand-Alone Test (SAT) or startup test and system integration tests for all kinds of HVAC equipment like FCU, CRAC, AHU, FANS and PUMPS.

• Coordinate& Supervise sub contractor’s work for conformance to specifications and to meet the progress of work within the time frame.

• Review and brief understanding of the construction documents, shop drawings, material submittal, catalogues standards and equipment manuals.

• Prepare daily progress reports, reporting to senior engineers and attend progress meeting.

• Responsible for LOTO, issuance of isolation certificates and energization.

• Arranging all the clearance approval, permissions etc. as may require time to time from any of the authorities during the execution of project

• Assist / coordinate the preparation of the final handing over documents such as QC/QA documents, testing and commissioning reports etc.

• Coordinate with vendors/suppliers for installation and T &C of ELV system such as FAS, PAVA, BMS, ACS, etc.

Aug 2016 -March 2018

Electrical Engineer, KENTZ QATAR WLL

Project: Sidra Medical and research Centre and Hospital Responsibilities

• Responsible for effective resource management and project schedule.

• Monitoring the electrical works for conformance with the provisions of the contract documents and procedure manual.

• Ensuring work is executed in accordance with the contract specification, design approved drawings.

• Arranging the necessary drawings and technical details, safety permissions and work permit for the construction team.

• Responsible for Installation, Testing and Commissioning of all Electrical related works.

Computer Proficiency

MS office All packs

MS Excel

Auto CAD 2D

MS Power Point

Windows

Acconex

September 2014 -June 2016

Electrical Site Engineer, Mercury Mena Electro Mechanical Project: Barwa Al Baraha Labor Accommodation Phase 2 Responsibilities

• Responsible for preparation of all Engineering works related to the Execution of Electrical installations (Lighting, small power, Transformers, MV Panels, LV panels, Package Units, Electrical Water and Fire Pumps & Panels)

• Reading design specifications and technical drawings, researching suitable solutions as per standards liaising with the design team.

• Prepare of Work Execution documents like Method statement, Material Submissions, Shop Drawings and reports, liaising with client, contractor & sub-contractors

• Attending Engineering & Installation meetings on site, proposing modifications and Coordinating technicians and craftspeople.

• Managing the Installation processes at site with site engineers, Ensuring Installations are done as per the Design requirement s and shop drawings

• Supporting and involvement in the Testing & Commissioning works of LV system, HVAC systems, Fire Alarm and Fire Fighting systems. June 2013 -January 2014

Assistant Electrical Engineer, Kerala State Electricity Board, India. Project: Operation and Maintenance of 110 KV Substation

• To ensure continuous power supply to consumer and monitor the substation for any faults and discrepancies. Operation and maintenance of 110kv/11kv substation as per the maintenance plan. Declaration

I hereby declare that the above furnished details are correct and true to the best of my knowledge and belief.