Post Job Free
Sign in

Construction Manager Power Plant

Location:
Texas
Posted:
February 14, 2023

Contact this candidate

Resume:

William Boyd Latham

Hooks, TX *****

H - 903-***-****

C - 903-***-****

Profile: Construction professional with over 25 plus years of highly skilled hands-on expertise in many aspects of the civil industry, heavy highway and Superintendent over 2 laydown areas outside work area, material receiving, pipe, such as pipe, steel, rebar, electrical supplies, panels for solar field. Supervising and Installation of solar field. Successful and verifiable accomplishments of a variety of projects while building and developing partnerships, creating positive rapport with engineers, local and state officials, and clients, as well as, working with supervisors and employees and maintaining costs of projects. Proficient in design, home building, power plants, Warehouse for electrical contractors and miscellaneous general materials and laydown area inside beside work area of cracker unit. Heavy highway and civil projects, problem solving, material purchasing, and staff development.

Skills and * Construction Planning & Scheduling * Organizing & Time Management Areas of * Civil Q C (Dirt-Rebar-Forms- Concrete) * Placement of Anchor Bolts Expertise: * Materials Management * Certified OSHA 10 & 30 Safety

* Subcontractor Management and CPR Trained

* Team Building and Leadership * 2 yrs. college Auto CAD Draftsman

* Mechanic QC (Grout placement on * NCCER Plus Carpenter equipment and support columns) * TWIC Card Exp. August 28, 2021

* Computer experience includes:

- Word Perfect - Microsoft Excel

- Microsoft Word - Microsoft 365

- Adobe Acrobat PDF - Warehouse Management Software Professional LiveAction GEI

Employed 2972 Lackin Ave., Suite B, Clovis, CA 93612 Experience: August 2020 – March 2022

Job Scope: Superintendent over roads, laydown sites, civil work, materials receiving

(ex: rock for roads and laydown area), leveling field`s for the installation of solar field panels and surveying. Supervision of 12-20 men crew, overseeing the installation of post-tork tubes, panels and wiring through completion, schedule management, management of all SWPP area ponds, silk fences, required documentation and reports, timesheets, material costs, equipment orders and rental returns, and cleaning job completion site.

Bo Mac Contractor

Beaumont, TX (Total Ethane Cracker Project)

Feb. 2018 – June 2020

Responsible for the overall lay down yard, supervisor over 12 person crew, procurement of ordering, receiving, materials, forms anchor bolts and building materials, sending material to job site, scheduling 3 tractor trailers moving in and out of lay down yard and Bo Mac warehouse software. Reading blue prints to send in anchor bolts, forms, lumber, plywood, rebar and all other materials. Shipping out all materials back to rental companies. My top priority was to work in a safe manner and keep all materials moving in and out of the unit in a timely manner.

Pulices Construction Inc.

288 Hwy, Houston, TX

Superintendent Bridge Work

Oct. 2017 – Jan. 2018

Superintendent of new toll road, on 288 Hwy from Toll 8, 9 miles south to FM 58. Set up job for new construction of toll road, 11 bridges, worked with Texas DOT and suppliers to keep job on schedule and within budget. Working in the highway medium for safety of all employees was my top priority.

Resume of William Boyd Latham Page 2

May 2017 – Self Employed

Residential construction including new homes, remodeling and cabinetry work, pouring concrete slabs, driveways, sidewalks and small shop buildings. SCR Civil Construction

Richmond, TX

Superintendent Bridge Work

March – April 2017

Supervision of 9 men and lead man. Bridge repairs, mow strips, upgrades on I-35 North. Worked with Texas DOT inspectors, worked with suppliers to keep job on schedule and within budget. Safety was the number one priority, while working next to traffic at speeds of up to 75 mph.

Self Employed

Oct. 2016 - Feb. 2017

Residential construction. Responsibilities includes all aspects of construction including design, concrete form work and placement, metal building erection, material coordination and procurement, managing contractors and finish work. Cajun Constructors, Inc.,

Marathon Project, Texas City, TX

General Forman (Concrete Coordinator)

Aug. – Oct. 2016

Superintendent over foreman and 30 employees. Responsibilities include reading blueprints, scheduling and supervising employees on setting forms, placement of concrete, change orders and procurement. Backfilling of dirt work with rigid specifications from Marathon. Completion of the job ahead of schedule. Turner Industries Group

BASF Project, Freeport, TX

General Foreman Civil

Nov. 2015 - April 2016

Responsibilities include all civil duties, reading blueprints, supervising employees on setting forms, placement of concrete.

Turner Industries Group

Celeanese Fareway Project (Methanol Project), Houston, TX Area Project General Forman Mechanic, Civil Grout Coordinator Dec. 2014 – Aug. 2015

General Foreman

Responsibilities include: Setting up grout pours reading blueprints, scheduling and supervising employees on setting forms, placement of grout, change orders and procurement. Supervision of labors for water placement for the whole unit (job). Clean up unit and keeping dumpsters and all trash emptied of all crafts (we are a support craft). Cajun Constructors, Inc.

Celeanese Fareway Project (Methanol Project), Houston, TX Area Project Superintendent (Civil Dirt Concrete Coordinator) Feb. – Oct. 2014

Superintendent over general foreman, four foremen and 150 employees. Responsibilities include reading blueprints, scheduling and supervising employees on setting forms, placement of concrete, change orders and procurement. Backfilling of dirt work with rigid specifications from Celeanese. Final placement of area paving and completion of the job. Resume of William Boyd Latham Page 3

CH2MHill, Toll 49, Segment 3,

Tyler, TX

Construction Manager

Jan. 2013 – Oct. 4, 2013

Bridge Superintendent (December 2012)

Completed and opened 10.6 miles of road ahead of schedule (March 28, 2013) Completed and signed off for repair work from Net Mar (Oct. 4, 2013) Constructed nine (9) bridges for toll 49, segment 3 in Tyler, Texas. Coordinated activities of subcontractors and company personnel for successful project completion. Responsibilities include materials coordination and procurement, reading blueprints, supervising concrete form setting and placement, structural scheduling, maintaining change orders for TDOT, general construction and employment management of crews. Special note:

Three historical accomplishments for the company not subbed out include:

(self-perform CH2MHill)

1150 bridge - first concrete deck poured by company employees

Set 95 girders in nine (9) days by company employees

Prairie Creek bridge 1640 ft. deck pour, longest bridge poured and completed by company employees

Shaw Group

Fulton, AR

General Foreman/Superintendent

Feb. 2008 - July 2011

Coordinating crews of carpenters in construction of the, J.W. Turk Power Plant. Responsibilities include supervising building foundation forms, concrete form setting and placement, installation of 12 miles of fencing and gates around the project site, installation of drainage pipes and man holes, material coordination and procurement, reading blue prints, utility installation and general carpentry. L & L Shop Buildings

Owner/Superintendent/Building Designer, 2002 - 2008 Self-employed owner of a company that designs and constructs metal buildings. Responsibilities include blue print designer, materials procurement and delivery, concrete form setting and placement, welding, building construction and managing crew members. Diamond K Construction Company

Mount Pleasant, TX

Superintendent

Dec. 2002 – Nov. 2003

Manage and supervise crews and subcontractors for commercial construction. Responsibilities include concrete form setting and placement for additions to three new schools, new gymnasium, football and baseball fields, remodeling field house, general construction, material coordination and procurement and general carpentry. Worked on I-30 Bridge at FM 1252 taking down and rebuilding, and started and finished on time and within budget.

Latham’s Construction Company

Owner/Superintendent, May 2003 – Dec. 2008

Owner and manager of a commercial and residential construction company. Responsibilities include all aspects of construction including design, concrete form setting and placement, building erection, material coordination and procurement and managing employees.

Resume of William Boyd Latham Page 4

Latham’s Drafting & Home Designs

Owner/Superintendent, July 2001 - May 2002

Owner and manager of a drafting and home design company. Responsibilities include designing blueprints and building residential construction including material procurement and coordination, managing contractors and general construction. NEPCO (SNC Lavlin)

El Dorado, AR

Assistant Civil Superintendent

April 9, 2001 - May 2002

Managed and supervised crews for construction of a cooling tower structure and natural gas fired power plant (8 units). Responsibilities include blueprint interpretation, supervising bolt layout, general carpentry and concrete placement. B. E. & K Construction Co.

Birmingham, AL

Supervisor

Dec. 2000 - March 2001

Managed and supervised crews in remodeling paper line for Weyerhaeuser Co., Valliant, Oklahoma. Responsibilities include blueprint interpretation, form setting, core drilling and rebuilding paper machine head boxes.

H.B. Zachary Construction Co. at International Paper Co. Texarkana, TX

Supervisor, Oct. - Dec. 2000

Supervised crews in automation of shipping and receiving line. Responsibilities include blueprint interpretation, form setting, bolt layout, general carpentry and maintenance of paper machine equipment.

H.B. Zachary Construction Co.

Mount Enterprise, TX

Supervisor,

Jan. - Aug. 2000

Supervised crews on building a 45KW gas oil burner electrical power plant. Responsibilities include blueprint interpretation, bolt layout and general carpentry. EDUCATION: 1974 graduate of Hooks High School, completed 2 years welding in Vocational Ag

Texarkana Community College, Texarkana, Texas, Sept. 1994

Computer Aided Drafting (CAD) I, II and Graphic Design Engineering

College Algebra I

Texarkana Community College, Texarkana, Texas, Sept. 1996

Drafting III, IV

College Algebra II

Auto CAD 14 & Lite 97 Drafting Systems, Self-trained B E & K classes:

Supervisor I

Pipe fitter I

Civil Blueprint Reading

Onsite training on Victor Torch; and Hilt Dx System Operation NEPCO classes:

Sexual Harassment Training

Quality Control Management;

Resume of William Boyd Latham Page 5

Shaw Construction classes:

Sexual Harassment Training

10 and 30 hrs. OSHA Safety Class

Supervisor Core Foreman’s 1 & 2

Safe Start 1 & 2

Environmental Class 1 & 2

Fire Watch

Confined Space Training

Excavation Certified

Fall Protection Training

Hot work and Fire Extinguisher User Training

Scaffolding User Training

Accident and Investigation Class

Shield Card Training

PERSONAL Robert Patcheck Jim Hill Robert Akins

REFERENCES: Construction Manager 903-***-**** 903-***-**** Durango, CO

720-***-****

******.********@*****.***

Scott Carthal Jack Harris

903-***-**** Superintendent

Live Action

678-***-****



Contact this candidate