Post Job Free
Sign in

Construction Foreman Pipeline

Location:
Conestoga, PA, 17516
Posted:
April 01, 2023

Contact this candidate

Resume:

Edward Campbell

Highly motivated construction foreman with a focus in utility construction,

that is looking to bring value by utilizing the extensive 25 years of experience. 295 Shenks Ferry Rd

Conestoga, PA 17516

570-***-****

************@*****.***

EXPERIENCE

Fehlinger Construction Group, Shavertown PA— Foreman 2009 - PRESENT

Lead many teams and projects including pipeline construction, painting crews, coating teams, backfilling jobs, hydro testing jobs, and vacuum testing.

Hamersly Enterprise, Coopersburg PA — Foreman

2005 - 2009

In charge of installation of sewer, water, and storm pipelines. This includes but not limited to team management, part and equipment purchasing, black top replacement, concrete pouring, pipeline ditch design, and multi site management.

Pioneer Construction, Honesdale PA — Foreman

1999 - 2005

Lead the installation of the water pipeline . This includes but not limited to installation of water main and services, and purchased parts to complete the job on time.

EDUCATION

Lake-Lehman High School, Lehman PA — High School

Diploma

1979 - 1983

SKILLS

● OSHA 30 hr Certified

● Certified in confined

space operations

● First Aid/CPR trained

● Hydro testing up to

8000 psi

● Air testing sewer lines

● Vacuum testing

manholes

● Mandrill sewer lines

● Mandrill high

pressure gas lines

● Camera inspections

CCTV

● Denso coating

certified

● Installation of sewer

and water lines

● Sandblasting, prime,

and paint utility lines

● Water tapping lines

up to 24”

● Certified in

observation of

excavating and

backfilling

● Certified in protection

of coating when

backfilling

● Certified to conduct

pressure testing

● Certified in inspecting

pipe coating with

holiday detector

● Certified in damage

prevention for

blasting near pipeline

● Certified to conduct

PROJECTS

Kingsley 24” gas pipeline installation — 2019

This project was for Williams Gas. The project consisted of 3 miles of 24” pipes, laid in a 8’ deep ditch. I led the team of 4 people and completed the project before the original deadline.

Grantville 24” sewer pipeline installation — 2007

This project was for Deery Sewer Authority . The project consisted of 5 miles of 24” pipes, laid in a gravity ditch ranging from 5’ deep to 12’ deep. I led the team of 10 people and completed the project before the original deadline.

Archbald 15” water pipeline installation — 2004

This project was for PA American Water . The project consisted of 3 miles of 15” pipes, laid in a 7’ deep ditch with 6” of stone laid beneath the pipeline. . I led the team of 8 people and completed the project before the original deadline.

pressure testing to

substantiate

MAOP/MOP

● Certified damage

prevention during

excavation by or on

behalf of operator

● Certified for pressure

testing non liquid

medium greater than

100psi

● Certified to pressure

test for liquid

medium

● Certified to

perform/inspect

pressure tests



Contact this candidate