Edward Campbell
Highly motivated construction foreman with a focus in utility construction,
that is looking to bring value by utilizing the extensive 25 years of experience. 295 Shenks Ferry Rd
Conestoga, PA 17516
************@*****.***
EXPERIENCE
Fehlinger Construction Group, Shavertown PA— Foreman 2009 - PRESENT
Lead many teams and projects including pipeline construction, painting crews, coating teams, backfilling jobs, hydro testing jobs, and vacuum testing.
Hamersly Enterprise, Coopersburg PA — Foreman
2005 - 2009
In charge of installation of sewer, water, and storm pipelines. This includes but not limited to team management, part and equipment purchasing, black top replacement, concrete pouring, pipeline ditch design, and multi site management.
Pioneer Construction, Honesdale PA — Foreman
1999 - 2005
Lead the installation of the water pipeline . This includes but not limited to installation of water main and services, and purchased parts to complete the job on time.
EDUCATION
Lake-Lehman High School, Lehman PA — High School
Diploma
1979 - 1983
SKILLS
● OSHA 30 hr Certified
● Certified in confined
space operations
● First Aid/CPR trained
● Hydro testing up to
8000 psi
● Air testing sewer lines
● Vacuum testing
manholes
● Mandrill sewer lines
● Mandrill high
pressure gas lines
● Camera inspections
CCTV
● Denso coating
certified
● Installation of sewer
and water lines
● Sandblasting, prime,
and paint utility lines
● Water tapping lines
up to 24”
● Certified in
observation of
excavating and
backfilling
● Certified in protection
of coating when
backfilling
● Certified to conduct
pressure testing
● Certified in inspecting
pipe coating with
holiday detector
● Certified in damage
prevention for
blasting near pipeline
● Certified to conduct
PROJECTS
Kingsley 24” gas pipeline installation — 2019
This project was for Williams Gas. The project consisted of 3 miles of 24” pipes, laid in a 8’ deep ditch. I led the team of 4 people and completed the project before the original deadline.
Grantville 24” sewer pipeline installation — 2007
This project was for Deery Sewer Authority . The project consisted of 5 miles of 24” pipes, laid in a gravity ditch ranging from 5’ deep to 12’ deep. I led the team of 10 people and completed the project before the original deadline.
Archbald 15” water pipeline installation — 2004
This project was for PA American Water . The project consisted of 3 miles of 15” pipes, laid in a 7’ deep ditch with 6” of stone laid beneath the pipeline. . I led the team of 8 people and completed the project before the original deadline.
pressure testing to
substantiate
MAOP/MOP
● Certified damage
prevention during
excavation by or on
behalf of operator
● Certified for pressure
testing non liquid
medium greater than
100psi
● Certified to pressure
test for liquid
medium
● Certified to
perform/inspect
pressure tests