A highly motivated and dynamic Civil engineer with 17 years of experience in construction, quality control and implementation of ISO 9001-2015. Well experienced in construction implementation, quality control inspections of Road and Infrastructure, oil and Gas,Reservoir, pumping station, Substation, Sewage treatment plant, high-rise buildings, Malls, Marine, and ports in compliance with government codes. I am looking for a position of Sr. QA/QC Engineer Civil in an organization where my experience and knowledge can be used to the best. Bachelor of Engineering @ visveswaraiah Technological University Belgum Karnataka in July-2005

PROFESSIONALEXPERIENCE

• Civil Engineer (B.E) with over 17 years of cross-cultural and rich experience in Quality Assurance, Quality Control, well known Construction organizations in Middle East.

• Worked as Sr QA/QC Engineer civil in Shafa Al Nada Building Construction LLC Somaliland South Africa.(Feb-2019-Nov-2022)

• Worked as Sr QA/QC Engineer civil in HBK CONTRACTING WLL Doha Qatar (2010-2018).

• Worked as Sr QA/QC Engineer in AL FARA’A Group of companies in UAE (2009-2010).

• Worked as Lead QA/QC Engineer in AZMEEL Group of companies in KSA (2007-2009).

• Having 15 years’ Experience in Gulf Countries as Lead QA/QC Engineer.

• Possess extensive experience in conducting Quality Control Tests on construction materials of buildings, Road and Infrastructure, concrete, rebar, hallow block, sand, water, Emulsion paint, Epoxy coating, sub grade, sub base, Asphalt, aggregate, interlock, kerb stone, traffic marking, street light pole with luminaries. Traffic sings board etc.

• Expertise in managing the entire activities pertaining to Testing and Commissioning of Plants (port, Substation, Reservoir, sewage treatment plant, pumping station), Mall, High-rise building while maintaining and coordinating close out of the system punch lists.

• Overall in-charge and responsible for the smooth flow of the projects with in Quality, Cost, and Time.

• Successfully completed ISO 9001-2008 Lead Auditor Course in Doha Qatar.

• Attended ISO9001-2015 awareness Training in Doha Qatar.

• Internal audit Training succefully completed in Dec,2009 UAE

• Quality in Construction Feb,2010 UAE

• National workshop on performance of Concrete in coastal Region PCCR-04March2004

• National workshop on Water Reuse and Recycling for sustainability(WRRS-04) ORGANISATIONALEXPERIENCE

Feb-2019-Nov-2022 : Shafa Al Nada Building Construction Project cost : 101,732,729.39USD

WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

2

Feb2016–Sep2018 : HBK Contracting (WLL) DOHA QATAR Clients : DP World UAE

Supervision Consultant : CGR (Cullen Grummet & Roe) Design consultant (Marine) : EXE (Portugal) and MAPES

(Korea) Position : Sr QA/QC ENGINEER CIVIL

Project : Port of Berbera Terminal Work Somaliland South Africa. Road and Infrastructure: this project having Internal Road, container yard, sub grade, sub base and CBM above CBM Paving Block, sewer line with deep utilities, storm line with deep utilities, potable water line, Electrical duct, house connection etc. Building area: Substation, Amentias Building, pre gate, substation, sewage treatment plant, Mosque, work shop building etc.

Marine: Erection of cantitravel with 2 nos of crane), Dredging work, Scour Protection, Revetment and causeway, piling work with steel tubular (dia 1.8 m meter), 33 mtr length, sheet piling,400 meter, Quay wall, vibro-compaction, Installation of ties rod. Reclamation of dredging material, Precast for pile front crane rail beam, pile plug, Installation of fender base, Lagoon etc. Duties and Responsibilities:

• Monitor all quality related activities on the project

• Develop and gain approval of the Project Quality Plan, Method statement, ITP, Quality procedure.

• Prepare & gain approval of Material submittals

• Chair meeting with Consultant and client.

• Provide the training for unskilled people and new activity

• Develop the procedure for work Inspection, material submittal, document control etc.

• Supervise the site activity with QC Engineer, Construction Manager.

• Monitor the disposition of all issued non-conformance reports.

• Issue Internal NCR.

• Replying all Corresponded regarding MEP, QA/QC, Material, issue.

• Participate in Audits where the Lead Auditor require as competent QC audit team member Project cost : 600 MillionQR

Clients : Ashghal (PWA)

Consultant : Hyder Middle East

ProjectManagement : Parson

Position : Sr QA/QC ENGINEER CIVIL

Project : Road & Infrastructure @ Banihajer

and Mall of Qatar

The major elements are 60 Km of road works and

Pipe line ( and Internal Road) with Interchanges grade separated Junction, deep Utilities such as Surface Drainage Works, TSE Line, sewage water work, house connection, Electrical Works, Street lighting works, Q-Tel, QAF, ITS Ducts. Protection of Existing Utilities, and Landscaping (Within Interchange). Micro tunneling work also supervised as Sr QA/QC Engineer Civil.

Duties and Responsibilities:

WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

3

June2012–Jan-2016 HBK Contracting (WLL)DOHAQATAR

• Monitor all quality related activities on the project

• Develop and gain approval of the Project Quality Plan, Method statement, ITP, Quality procedure.

• Prepare & gain approval of Material submittals

• Perform all internal and external audits on behalf of the company's management

• Verify contractor quality requirements are specified to vendors and contractor documentation Submittals

• Attend client quality management meetings preparation and control of project quality system management documentation prior to project commencement

• Review quality inspection personnel qualifications and training requirements

• Monitor the disposition of all issued non-conformance reports.

• Monitor the progress and effectiveness of the project quality management system recommend and implement improvements when required.

• Coordinate all QA/QC activities with the site QC Engineer

• Coordinate all quality related correspondence with the customer’s representatives.

• Controls all achieve documentation upon the completion of the project.

• The reviewing of site purchase orders to ensure that the applicable requirements are met

• The control of onsite and offsite vendor inspections.

• Review supplier material certificates

• Take part in supplier audit and surveillances

• Coordinate with the companies’ discipline engineers for the resolution of technical discrepancies

• Coordinate with management for quality improvements

• Checking quality of concrete while batching, pouring and after pouring.

• Responsible for all operations at batching plant & Asphalt plant and QA/QC site lab. Project cost : 500 Million

Clients : Lusail Real Estate Developers

Consultant :Dorsch

Project Management : Parson

Position : Sr QA/QC ENGINEER CIVIL

Project : Lusail CP06C Infrastructure Doha Qatar

This project having reservoirs with pumping station, 66/11 KV substation, irrigation water tank with pumping station, storm Water tank with pumping station, storm water pumping station and Tele communication building and deep utilities with pipe line. Duties and Responsibilities:

• Responsible for managing and performing the daily QC responsibilities to ensure the projects constructed in accordance with the established minimum standards & Review of the entire documentation and physical. Inspection phase of the work flow process and working with other in-house personnel (e.g.: Project Managers, Supervisors, etc.) and external personnel to produce a quality building.

WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

4

Apr2011–June2012 : HBKContracting

• This role will ensure that subcontractor construction activities are complete compliance with company, client, and industry standards.

• To develop and gain approval of the Project Quality Plan, Method statement, ITP.

• weekly QC meetings with the superintendent and provide written minutes as described in project specific contract documents.

• Provide written daily QC reports that reinforce activities that are being constructed in conformance with each specific project's established standard and constructively confronts non-conformances to produce the desired outcome in a timely manner.

• Verify and document that all materials received for the project are in conformance with the approved submittal, are handled and stored appropriately and are acceptable for use in the project.

• Conduct pre construction meetings with new and existing subcontractors and the superintendent at least two days prior to the start of each new phase of the work to discuss issues that affect quality. Document these meetings in the daily QC report and Preparatory Phase reports.

• Final inspections, certificates of occupancy and acceptance of the works and various phases thereof.

• Assemble and forward project closeout documents that include O&M manuals, as-built and warranties.

• Stop work if necessary, to resolve matters that affect safety, quality and/or inhibit the logical progress of work.

• Checking quality of the materials ordered by procurement and stores dept. Project : 600 millionQR

clients : Al-Ganim

Consultant : KEO International

Position : Sr QA/QCENGINEER

Project : Ayan Tower (High Rise Building)

High rise 52 story five-star hotel project having 52 floor and two Basement, and car parking. Duties and Responsibilities:

• Implementation of Project Quality Plan (PQP), Quality System procedures, Quality Control Plan (QCP), Inspection and Test Plans (ITP) in accordance with the applicable quality system standards and or Contractual specification requirements.

• Ensure all inspections done as per Inspection and Test Plan/Contract.

• Ensure proper interaction and coordination with consultant, third party laboratory and site team

• Planning duties within the QA/QC staff and related work schedules.

• Identifying and developing QA/QC personnel certification requirements and continuing education/training need

• Taking full responsibility for hold-point releases once all QMS functions have been completed and the equipment is ready to go into the next work stage.

• Monitoring Non-conformance’s and closing out by corrective / preventive actions Status.

• To develop and improve the existing Quality Control Standards and processes in Facilities WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

5

Sep2010–Apr2011 : HBK Contracting (WLL)DOHAQATAR

Engineering Department by means implementing Standards, Procedures, Guidelines and Templates (Inspection Records) to ensure a consistent approach to inspection.

• Establish and maintain a QC Inspection Equipment Calibration Register.

• Assist the Project Execution Group with QC activities, i.e. review of contractors Inspection& Test Plans, assign QC personnel to contractor facilities, etc.

• Participate in Audits where the Lead Auditor requires competent QC audit team member. Project cost : 500Million

Clients :ASHGHAL

Consultant :STANLY

Position : Sr QA/QCENGINEER

Project : DOHA NORTH SWEAGE TREATMENTPLANT(STP)

Major civil concrete Foundation/structure with extensive underground service with the all civil work like Bio-rector tank, clarifier tank, Storm water tank, filter water storage tank, ultra violet & ultra-filter Buildings, Ground Medium Filter tank, Thermal drying plant, etc. are supervised as Sr QA/QC ENGINEER.

Duties and Responsibilities:

• Ensure all inspections done as per Inspection and Test Plan/Contract.

• Ensure proper interaction and coordination with consultant, third party laboratory and site team.

• Planning duties within the QA/QC staff and related work schedules.

• Identifying and developing QA/QC personnel certification requirements and continuing education/training needs.

• Providing leadership, mentorship, and direction of all QA/QC personnel.

• Taking full responsibility for hold-point releases once all QMS functions have been completed and the equipment is ready to go into the next work stage.

• Monitoring Non-conformance’s and closing out by corrective / preventive actions Status.

• Establish and maintain a QC Inspection Equipment Calibration Register.

• Assist the Project Execution Group with QC activities, i.e. review of contractors Inspection & Test Plans, assign QC personnel to contractor facilities,etc.

• Present reports, data and recommendations to the Head of Quality on the Quality Control activities.

• Participate in Audits where the Lead Auditor requires competent QC audit team member.

• Manage and coordinate all quality activities on site, including assignment of quality personnel to particular activities / work areas onsite.

• Assist in the preparation of quality documentation, including the review of construction documents for compliance with project quality requirements.

• Maintain the site facility for filing quality records, and, maintain document registers in connection with quality records.

• Monitor the effectiveness corrective and preventive actions under taken to address occurrences on-conformance.

• Undertake periodic audits of the project quality management system, including suppliers and WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

6

subcontractors, and report findings to the Regional Quality Manager and the Project Manager.

• Liaise with and maintain close contact with the Client’s quality representative regarding quality matters on site and/or as affecting the work.

OCT 2009 - SEP 2010 : Al-Fara’a Engineering & General ContractingLLC) Abu Dhabi United StateEmirates.

Projectcost : 1.5 BillionAED

Clients : AL-FRIDA IVESTMENTCOMPANYUAE

Consultant : KHATIB&ALAMI

Position : Sr.QA/QCENGINEER

Project : Al-Ain Mall & Resort Projects

In these Projects all finishes work like, paint, tiles, Marble, Plastering GRC, GRG, GRP, Fitting of Mashrabiya ceiling, clay Bricks, false ceiling, Façade window, Aluminum framing, Glass handrail, wooden hand rail, Basement: floor coating, traffic Marks, Escalator lobby, inside and Out Side all finishes work carry by me as Sr QA/QC ENGINEER

Duties and Responsibilities:

• Ensure all inspections done as per Inspection and Test Plan/Contract.

• Ensure proper interaction and coordination with consultant, third party laboratory and site team.

• Coordinate with quality inspections with all the site sub-contractors and vendors.

• Coordinate all receipt inspections Distribute relevant QA/QC.

• Verify that the quality related site activities are in accordance with the Applicable codes and standards.

• Participate in the site internal and external site audits.

• Assure all technical documents relative to site quality control are current.

• Monitoring Non-conformance’s and closing out by corrective / preventive actions Status. Nov2007-April-2009 : Azmeel contracting construction co. AL-JUBAILKSA. Project cost : 378 SR Million

Client : Jubail energy service co. (OIL AND GAS PLANT) Consultant : DANIELI (Italian group)

Position : Lead QA/QC ENGINEER

Project : Construction of Seamless Pipe Plant (JESCO) In plant area for Soil improvement, Bored pile, CFA piles stone column, group of pile cap, pedestal and erection of steel column, Wear house. Lot of technological foundation like (furnace foundation, mandrel foundation, fine quality mill foundation, sizing mill foundation. Cooling Bed foundation, Industrial Waste water tank, Electrical Sub Station, Compressed air plant, Cliriflocullator tank. Electrical cabin Railway track, Pump room, pipe rack, Erection of pipes, construction of chimney.

Duties and Responsibilities:

• Prepare Inspection Test Plans/check sheets and approval from the consultant

• Implement Quality System procedures, Quality Control Plan (QCP), Inspection and Test Plans (ITP) in accordance with the applicable quality system standards andor WASEEM ALAM

Email: adv9rx@r.postjobfree.com,

PHONE: +974-********

7

May2007-Nov2007: Azmeel contracting construction co Al Jubail KSA AUGUST 2005 toAPRIL2007 : Ittina properties Pvt LTD.BANGALORE

• Contractual specification requirements.

• Ensure all inspections done as per Inspection and Test Plan/Contract.

• Assist the QA/QC Manager in his activities and daily running of the department operations

• Ensure proper interaction and coordination with consultant, third party laboratory and site team

• Carry out regular surveillance inspection for all activities on site and that of sub-contractors.

• Monitoring Non-conformance’s and closing out by corrective / preventive Actions.

• Plan and carry internal audit in accordance with the documented procedure and the Project cost : 200 SR Million, Bechtel Accommodation Client : Royal commission Jubail

Consultant : Bechtel

Designation : QA/QC ENGINEER CIVIL

Project : Bechtel accommodation, this project having two story Precast apartment, all are having Integrated slab type foundation, as QA/QC Engineer under Supervision my work is Erection of precast panel, painting, laying of ceramic tiles, Marble, fixing of Door frame,

This project having 1000 fate 36 Apartments, Ground floor to third Floor Including swimming pool, Sauna bath, steam Room, Club House, Change room, Landscaping Road work etc.

• NATIONALITY :Indian

• LANGUAGESKNOWN : English, Urdu, Hindi Arabic

• PARMANENTADDRESS : Village Semri,post office sathi,Distric west champaran Bihar

• Marital status :Married

• Qatar Driving license :yes

• Visa : Transferable

I certify that above information is true to the best of my Knowledge and believe kindly consider my resume and provide me an opportunity to serve in your esteemed organization for which act of kindness I shall be ever grateful to sir. Looking forward to hear from you at the earliest. PERSONALDETAILS

February

December

December



Contact this candidate