MALAKAS GARCIA
Al ahsa Salmiya * Camp hufof Saudi Arabia
+966********* adv940@r.postjobfree.com
Malakasgarcia
OBJECTIVE
To enhance my professional skills, capabilities and knowledge in an organization which recognizes the value of hard work and trusts me with responsibilities and challenges. EXPERIENCE
Piping Foreman
24 Jan. 2022 - Up to present
ARCC
Project, hawiyah uneyzah gas storage phase 1, phase 2 Aramco Samsung Proj. Duties and Responsibilities
Responsible for supervision of fabrication and installation of piping items as per drawings and. Clients specifications.
Responsible for Material required and follow up with it. Responsible for planned progress schedule without compromising quality and safety.
• lay out and fabricate of spool as per isometric drawing
• fit up and cutting of spool Fittings and valve installation
•compute of take off material as per drawing
Pipefitter A / Leadman
Feb. 20,2021 - May 15,2021
Kalayaan Engineering
Project Clark Green Frontier buildng Philippines
Duties and Responsibilities
Installation of mechanical chiller, ACU, and fabricate piping connection to chiller.support welding of pipe and hydrotesting line.
Pipe Fitter
April 01, 2019 - June 02, 2019
JGC Philippines
Project : CBNC NICKEL PLANT
Riotuba Palawan Phil.
Duties and Responsibilities
shutdown activities, removing old pipes
installation of bolt, valves gasket.
assemble and fabricate support
fit up and welding support plate,layout erection of new pipe Utilize valve keys and wrenches to regulate liquids, steam and other gaseous substances from pipes
Oversee the repair and replacement of damaged or worn out pipe components
Use hand or power tools to drill holes in structures such as wall decks to allow for pipe passage
Select pipe types, sizes and quantity required for a pipefitting project
Install and configure automatic pipe control systems. Foreman Piping
Feb.17,2018 - March 30,2019
ECT Co.
Project high rise philippines
Duties and Responsibilities
Carry out daily monitoring at workshop and site progress in order to achieve the planned schedule.
Prepare necessary documents as and when required for all additional work requirements and projects.
Evaluates and resolve any discrepancies and problems arising from projects. Installation of piping and lay out of
Pipe spool connecting to jockey pump, fabrication of support brazes, branches. Hydrotesting of line, and punch clearing, fabrication of riser pipe victaulic. Foreman Mechanical Piping
01Nov.2015 - 17June 2017
EXPERTISE CO.
Project :Turn Around Shutdown Sabic
Jubail Saudi Arabia
Duties and Responsibilities
Responsible for supervision of fabrication and installation of piping items as per drawings and Clients specifications
Responsible for Material required and follow up with it Responsible for planned progress schedule without compromising quality and safety Co-ordinates with internal and external parties and monitoring till completion of jobs. Responsible for safety related to workplace & Workers.
PMC PIPING SUPERVISOR
08 July 2014 - 31Dec. 2014
JGC
Project : Onshore Ras Gas Qatar
Preparing as built Isometric as per site condition. Preparing Isometric by referring General Arrangement drawing. Piping fabrication of various sizes of pipes and material class. Routine inspection of progress of work.
Fabrication and installation of A/G and U/G piping works at different areas. Coordinating work assignments with subordinates and superiors. PIPING FOREMAN
08 Oct. 2012 - 31 March 2014
SAMSUNG ENGINEERING
Project : SHA GAS UAE ABUDABI
Schedule and coordinate the work of a team of pipefitters, welders, and helpers Read and interpret blueprints, drawings, and specifications to determine layout, sequence of operations, and material requirements
Mark reference lines, cut openings for pipes in walls and floors, and lay out flooring supports. PIPING FOREMAN
15 July 2010 - 14 July 2012
DAEWOO E&C
Project: ALGERIA FERTILIZER PLANT
AFRICA
Monitoring progress and distribution of daily tasks, necessary tools and materials needed, with particular emphasis on compliance with specific safety rules and quality standards, ensuring the necessary logistics for each team work.
Checking the piping field installation to ensure that quality of materials used and workmanship are according to drawing specification.
PIPE FITTER
21Sept. 1999 - 13 Oct. 2008
MMG
Project: JUBAIL SABIC SAUDI ARABIA
FOLLOW THE SAFETY RULES AND REGULATION OF THE COMPANY. CHECK THE DRAWING BEFORE FIT-UP REGARDING SPECIFICATION / DIMENTION. LAY-OUT, CUTTING, GRINDING, FIT-UP ALMOST ALL CLASSES & SIZES OF PIPES FOR TURBINE, BOILER, EXCHANGERS FILTERS & PUPMS PIPING LINES.
KNOWLEDGE TO READ AND INTERPRET THE DRAWING BOTH PIPING AND STRUCTURAL. BLINDING AND DEBLINDING WORKS.
ABLITY TO WORK ON HIGH ELEVETION.
IRON WORKER
11 Sept 199 -
ALLTECH CO.
Project: PETRON MIXYLENE UNIT
PETRON PHILIPPINES
Read and understand blueprints and project layout
Measure and cut metal parts to exact specifications Install or fabricate metal pieces into columns, girders, or other structural frameworks Repair or replace existing steel parts of buildings and other structures Pipe Fitter
22 April 1996 - 28 Oct. 1998
EEI CORP.
Project : CCRU EXPANSION
PETRON BATAAN REFINERY
PHILIPPINES
FOLLOW THE SAFETY RULES AND REGULATION OF THE COMPANY. PERFORM GOOD HOUSE KEEPING.
CHECK THE DRAWING BEFORE FIT-UP REGARDING SPECIFICATION / DIMENTION. LAY-OUT, CUTTING, GRINDING, FIT-UP ALMOST ALL CLASSES & SIZES OF PIPES FOR TURBINE, BOILER, EXCHANGERS FILTERS & PUPMS PIPING LINES.
FABRICATION OF PIPE SUPPORTS & PLATFORMS.
KNOWLEDGE IN ERRECTION IN STRUCTURAL JOBS.
KNOWLEDGE TO READ AND INTERPRET THE DRAWING BOTH PIPING AND STRUCTURAL. KNOWLEDGE IN WELDING CARBON STEEL PIPE.
EDUCATION
MALAKAS GARCIA
Course / Degree School / University Grade / Score Year Secondary Limay High School 1986-1991
SKILLS
Pipefitter, Structural Fitter, Mechanical fitter, Pipe fabricator Commissioning team leader PROJECTS
Oil & Gas Project
In-depth knowledge & Experience in Refinery, Power Plant & Petrochemical Strength of technical know –how in Piping & Structural Erection Considerable years of experience in Oil & Gas Pipeline projects
Strong Knowledge in international codes & standards Able to monitor and lead a group & assignments entrusted 10 years experience in piping mechanical works.
ACHIEVEMENTS & AWARDS
PTW TRAINING WORKING AT HEIGHT TRAINING BASIC ( IRATA) Rope Access CCONFINE SPACE TRAINING BONDSTRAND RTR PIPE ASSEMBLY
LANGUAGES
English Tagalog
PERSONAL DETAILS
Date of Birth : 11/15/73
Marital Status : Widowed
Nationality : Filipino
Religion : Born Again Christian
Passport : P4674939B
Gender : Male
REFERENCE
Aguedo Cunanan - "Daewoo E&C"
HR Admin Daewoo
adv940@r.postjobfree.com
Jeorge Nono - "MMG"
Project Supervisor