RESUME FOR ASHRAFF ESSOP HOOSEN
Email: ****************@*****.***
Location: Amanzimtoti, Durban, KwaZulu Natal Contact Number: +27-76-359-**** / +27-63-639-****
OBJECTIVE
An experienced and dedicated Quality Manager who has successfully managed several Multi-Discipline projects within the Petrochemical and Gas sector. The ability to manage people and personalities within various types of organisations. A highly motivated individual that thrives on skills development and acquiring further knowledge in the various facets of construction and engineering that is very hands on. Seeking to add value within your business.
ACADEMIC QUALIFICATIONS
Course Description
Qualification
Year
NQF Level 4 – Business Management
Certification
2013
South Africa Welding Institute –
Welding and Fabrication Quality Inspector
Certification
2014
Quality Management Systems - ISO 9001 (SABS)
Certification
2011
API 653
Exam Outstanding
SKILLSET
Microsoft Office (Package)
Materials & Handling
Welder Procedure Qualifications
Welding Procedure Summary (Welding Processes)
Internal & External Auditing
Vendor Assessments & auditing
ISO 3834-2 - Quality Requirements for Fusion Welding of Metallic Materials
ISO 9001 - Quality Management Systems
ASME 2, 5, 8, 9; API 1104, 570, 571, 650, 653; SANS 347, SANS 1200, SATCC, AWS, EN etc.
SANS 347 – Categorization and conformity assessment criteria for all pressure equipment.
Data Book/System Packs/Work Packs
Document Control Systems
Customer Satisfaction
Piping Systems
Mechanical – Petrochemical, Paper Mill, Mining etc.
Structural Steel
Above Ground Storage Tanks
Non-Conformity of Products
Customer Satisfaction
Manufacturing of Fast-Moving Goods
Report Writing
Piling
Soil Cement Stabilization
Concrete Works
EXPERIENCE
NCI Engineers and Consultants, Petromoc, Cabo del Gado, Pemba
Project Site Agent
April 2022 to March 2023
Value : 16 Million Dollars
Project Pemba Fuel Terminal Upgrade
Project management consultant for Petromoc managing all contractors, inspections, and acceptance of works from fabrication to ready for commissioning.
Review and approval of all contractor’s documentation according to Client specification, code and relevant standards.
Manage all contractors onsite during the construction process, inspections and sign offs and design.
This project includes 2 x API 650 Tanks
Jet Piping – Fabrication, Installation and Testing
Diesel Piping - Fabrication, Installation and Testing
Unleaded Piping - Fabrication, Installation and Testing
Civil Works – Layer works, piling, concrete works, bases, architectural and roads.
Structural Works – Tank staircase and wind girder, Loading arms, Inspection gantry.
Mechanical Works – 4 x Pumps, valves
Instrumentation
Electrical
Review of all Non-Destructive Reports
Witness of Troxler and DCP testing
Commissioning of all systems.
Fire and Foam Water tanks and piping
PROFIBRE PRODUCTS, New Germany,
Pinetown
Quality Supervisor
February 2021 - Current
Manufacture Products for :
BELL Equipment Mine Dump Trucks
Alstom Gibella – Prassa : All train seats and control panels
MAN Buses
Amarok OEM Parts
Siemans
BELL Small Parts
Manufacture Profibre Stealth Caravan
Key Duties:
Responsible for Co-ordination of 5 QC Inspectors & SHE Administrator across all value streams
Liaise with all customers to ensure good client relationship
Conduct regular client visits
Internal audits as per audit plan on all value streams
Conduct external audits on all vendors
Conduct recurring quality meetings via Microsoft teams – Agenda NCR’s & Quality Issues
Responsible for conducting investigations with production management to establish root cause of client non conformances and close out.
Responsible for document/drawing management
Responsible for the upkeep of the company’s integrated management system and ISO 9001 2015 certification
PDCA, Perieto Analysis, Corrective Actions, ISHIKAWA and 8D reports
Responsible of STEALTH Caravan And BELL Warranty Claims
Responsible for Daily, Weekly and Monthly Reports
Improve & implement current Works Instructions, Inspection and Test Plans & Standard Operating Procedures to ensure efficiency, eliminates risk and ensure a better quality product
Responsible Welding Co-ordinator for all welding at Profibre
My duties are not limited to the above as daily I have many unexpected challenges that arise that Requires your focus and attention. Challenges that require immediate close out to ensure customer Satisfaction and also improvement to our in process inspection and production process. The business is Fast pace and requires delivery to our clients each week that requires being meticulous and to be able to
Be confident and make analytical and accurate decisions.
MELS Construction Lda. Beira,
Mozambique
Project Quality Manager
July 2018- December 2019
Value : 11 Million Dollars
Project – Mediterranean Shipping Company (MSC) – 12 000m2 Tobacco Warehouse Storage Facility.
Earthworks, Concrete, Structural Steel, Mechanical, Piping, Electrical and Architectural Key Duties:
Coordinate and manage all subcontractors onsite.
Coordination and Implementation of project weekly/monthly meetings.
Generate and submit monthly progress reports to client on overall progress for all disciplines.
Review and Approval of all subcontractor quality deliverables.
Coordinating of all inspections and ensuring timeous progressive approvals.
Management of defect registers.
Ensuring Site diary is completed and signed off.
Maintaining Non Conformance Register.
Auditing of all subcontractors/vendors
Submitting of all Field Engineering/Technical Queries
Ensuring all work is performed and completed as per client specification, code and standard.
Signing of all Subcontractor Data Books as per approved disciplines.
Coordinating site based inspections to client for final inspection and handover.
Coordinating final Mechanical, Practical, Electrical Completion sign off for Final Handover.
Management of copying and scanning the entire site based data books for handover.
Key Achievements:
Successfully completed this project despite a huge setback of 3 months due to Cyclone IDAI in March 2019. The Warehouse structure was at 80% completion an 50% of this was destroyed in the cyclone. The structural steel had to be fabricated in Dubai and be shipped. Damage to site was not limited to this but to concrete panels, earthworks (stabilised layers) and architectural, regardless of the cyclone the project was successfully handed over to an overjoyed and happy client within time.
NCI Engineers & Consultants
Quality Management
2009-2010
Consultant
Various Project Tenders
Compilation of Project Specific documentation
Review/Approve Subcontractor quality deliverables.
Respond to subcontractor queries and site instructions.
Fabricon Pipe and Labour Hire
Quality Inspector
October 2015 – Oct 2016
Engen IVB - Island View Durban S.A: New Multi Product Pipeline (NMPP) Engen IVB – Island View Durban S.A: Back of Berth (BOB)
Engen IVB – Island View Durban S.A: Tank Modifications Key Duties:
Materials Identification and verification.
Liaise with third party inspection for all statutory inspections and sign off.
Conduct fit up inspection for release for welding.
Coordinate all non-destructive examinations as per client requirement’s.
Ensure all work complete is as per approved construction drawings.
Liaise with client and attend weekly client production meetings.
Compile and review of all data packs.
Compilation of all hydro test packs.
Release for hydro testing with client and third part representative.
Final handover and acceptance to client.
Generate all “as built drawings”.
Key Achievement:
Back of Berth Project handed over on time to client.
Group Five Oil and Gas
Head Office QA/QC Coordinator and Site Project
Manager
April 2009 – November 2015
Head Office Coordinator Key Duties:
Prove support to the Group Quality Manager.
Coordinate and oversee quality information for both quality management system (QMS) and and project related.
Coordinate and conduct internal audits to ensure requirements to quality management systems (QMS) as per ISO 9001 and Site specific/based ISO 3838-2.
Maintain all site-based tracking sheets (Work packs/Test packs)
Represent Quality during periodic client progress meetings.
Maintenance and upkeep of the ISO 9001/ISO 3834-2 Standard.
Ensuring the integrated quality management systems is up to date with all latest revised/updated documents, this includes electrical and instrumentation.
Maintaining all head office/site registers, NCR’s, concessions, customer complaints, audits, etc.
Supervise and assist document control and archiving at head office.
Maintaining site support for all maintenance contacts and projects.
Generating quality packages for the estimating department for tender submission.
Developing all project specific quality deliverables for submission and approval prior to project start up.
Above storage tanks (Construction & Maintenance) – Inspection and developing of all relevant tank construction documentation, forms for inspection purposes.
Reviewing of all subcontractor documentation.
Compile monthly/quarterly reports.
Compile management review reports.
Group Five Oil and Gas
Quality Manager
Feb 2014 – Oct 2015
Construction of Transnet TM1 NMPP Group Five Trotech Joint Venture Tanks (Erection of 8 X API 650 Above Ground Storage Tanks)
Group Five Oil and Gas
Quality Manager
Nov 2013 – Jan 2013
Engen Back of Berth (BOB)
Group Five Oil and Gas
Quality Manager
July 2013 – Nov 2013
Petro SA Shutdown – Mosselbay
Group Five Oil and Gas
Quality Coordinator H/O
2013
Engen – NMPP Feeder Line Project Phase 2 Piping
Group Five Oil and Gas
Quality Coordinator H/O
2013
Engen – NMPP Feeder Line Project Phase 1 Piping
Group Five Oil and
Gas
Quality Coordinator
2013
Transnet Terminal 1 & Terminal 2
NMPP Pipe Lines
Group Five Oil and Gas
Quality Coordinator
2011 – 2012
SASOL Alrode - Design, Fabrication and Erection of 6 x Fuel Storage Tanks
Chevron Shutdown – Cape Town
TOTAL SA Polokwane – Construction of new 1000cm3 Petrol Tank
TOTAL SA Origstadt – Construction of new 1000cm3 Petrol Tank
Kentz (Pty) Ltd.
Quality
1998 -2007
Various Shutdowns at Sasol, Engen, and Sapref Refineries
Various Projects Moma Sands, Mozambique/ BCL Mines Botswana/Mondi Kraft, Richards Bay/ Huletts Aluminum (Pietermaritzburg) S6 Cold Mill & Hot Mill/ Jordan Bromine Limited, Dead Sea Jordan (UAE), Sasol 1 Poly Plant Midlands Site.
References :
Dalian Naidoo – Profibre Quality Manager – 083-***-****
Wynand Senekal – CEO Mels Construction Lda. (Mozambique) - +258-**-***-**** Deon Lazeras – Projects Director NCI Engineers – 084-***-**** / +258-**-***-****
Carl Manto – Fabricon Pipe & Labour Construction Manager – 073-***-****
Cade Morgan – FabriconPipe and Labour Alternate/Project Director – 083-****-*** Elvis Pillay – Likusas/Kentz/Group Five Quality Manager – 083-***-****