CURRICULAM VITAE
Name : Syed Nivas Syed Ibrahim
Mobile : +966-*********
E-Mail : **********@*****.***
SCE NO : 58275
Iqama : Transferable
Position Applied SENIOR ELECTRICAL ENGINEER
Carrier Objectives:
Professional Engineer with 17 plus years of experience in Construction and Infrastructure development.
Professional Summary.
Managing projects including all construction, infrastructures, Quality control and assurance, drawings and submittal reviews, planning, design, estimation, finalization of techno-commercial aspects and implementing quality standards.
Maintaining effective coordination with Clients, Core Team & Contractors for screening studies, site selection, and concept and feasibility assessments.
Devising and implementing processes in line with organizational standards and client specifications such as quality predictive metrics.
Maintain specific BIM software template files to assure standards. Review Revit 3D/BIM 360 Models from contractors and provide mark-ups/tracker as required
Early design review, validation and constructability coordination analysis and Preparing Clash reports
Verifying compliance for all local authority compliance and code compliance.
Adhering to International Quality Standards and auditing processes to ensure compliance.
Easy to adopt changing environment and can ability to work under pressure to meet the deadline with easy and efficiency.
Implement and ensures personnel safety by following the project and company health and safety guidelines and policies.
Education:
Bachelor of Engineering in Electrical and Electronics Engineering from M.Kumarasamy College of Engineering (Anna University), Karur, Tamil Nadu, India. 2002-2006 Position : Electrical Engineer Duration: Oct 2022 to Till Now Employer : Atkins Global
1) The Red Sea Development Project (Umlujj)
Engineering and supervision consultancy services in the commissioning of SUDC Plant, SUTH Plant, Temporary Electrical Power Support Systems, Data Centre Project and the Utilities of the Coastal Village Housing Project
• Reviewing drawing submittals from all phases of design to the as-built stage
• Reviewing material and supplier profile submittals to assist the client in making the most efficient,
sustainable choices
Collaborate with other design disciplines, including civil, structural, and architectural teams, to ensure project success.
Provide technical leadership on projects, ensuring that designs are innovative, efficient, and meet the highest standards of quality.
Maintain specific BIM software template files to assure standards. Review Revit 3D Models from contractors and provide mark-ups/tracker as required
Early design review, validation and constructability coordination analysis and Preparing Clash reports
Verifying compliance for all local authority compliance and code compliance.
Ensure compliance with all relevant codes, regulations, and standards
Approving workmanship while commenting on necessary improvement measures
Project managing the implementation of technical solutions.
Performing site surveillance to advise on feasibility of different installation approaches.
Generating site observation reports to project recommendations upon identification of potential and existing execution discrepancies
Indicating snags on job completion and assisting the contractors with cost and time effective de- snagging
Witnessing testing and commissioning of the systems, performed by the vendors and certified third-party organizations
Time efficient response to the correspondences occurring through the client’s recommended platform (ACONEX)
Maintaining a healthy work environment taking care of the project HSESS requirements Position : Sr. Electrical Engineer Duration: March 2022 to Oct 2022 Employer : HESCO
Projects : Hasan Island Umlujj
Reviews of shop drawings related and ensure its compliance with designs, contract requirement and properly coordinated with other discipline.
Analyzing Material submittal for approval in accordance with all requirements of project technical specification.
Review equipment selection including, transformers, switchgear, distribution panel boards, cabling and termination units for power and lighting loads, Data & Telephone System, Closed Circuit Television, Fire Alarm & Fire Protection, Public Address System, Access Control System, Master Clock System, Distributed Antenna System and BIM.
Confident in viewing contractors work Installation method statement and Inspection testing Plan.
QA/QC Procedures to Ensures that all the works done are in accordance with the approved electrical drawings, contract documents, project specifications, and all applicable standards whether local, national, or international standards.
Supervisions Technically, Monitoring, Inspections (IRs, MIRs, SONs, NCRs) as per specification standards and approved shop drawing of Electrical and Low Current system
Review all procedures of testing and commissioning performed by the Contractor.
Issuing SWI’s (site work instruction) and NCR’s (Non-Conformity Report) for any discrepancy in quality of installations.
Attend weekly meetings as directed by Project Director
Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed off by Contractor’s QA/QC Manager.
Visit the site every day and observed wrong execute the work at site by contractor to take the picture and make it site observation Notice (SON). Position : Sr.Electrical / ELV Engineer Duration: March 2021 to November 2021 Employer : Essar Project Png Ltd
Projects : MADANG AIRPORT – AIRCRAFT PAVEMENT UPGRADING, NEW TERMINAL BUILDING
& ASSOCIATED WORKS AT MADANG AIRPORT, MADANG PROVINCE The scope of work included:-
Design, Installation, Testing and Commission of all Electrical and Low Current system activities such as BIM 360, Power House, transformer, Power Distribution Board, Lighting Control Panel, Data & Telephone System, Closed Circuit Television, Fire Alarm & Fire Protection, Public Address System, Access Control System, Master Clock System, CUPPS and CUSS, Airport information display system, Baggage Handling System, signage, Passenger Boarding bridge, Distributed Antenna System, Trunk mobile radio system, HVAC, Smoke Management System, Pressurized stair Case, BMS Irrigation System, Landscaping, Water Treatment Plant, Sewage Treatment Plan. Roles and Responsibilities:
Co-ordinate with designer for Preparation of Design Drawing and Specification and Bill of Material as ANZSIC standard
Obtaining approvals of drawings / material submittals from concerned authority /consultant.
Preparation of comparison statement along with technical & commercial evaluation and onward submission to Client.
Preparation of method statement for related equipment store and installation, testing and commissioning.
Co-ordinate with Procurement department for the Suppliers and vendors documents to get approval from the client.
Raising RFIs (Request for Information) in coordination with drafting and Project Manager.
Management all subcontractors and following up implementations Verification of materials received at site.
Raising Purchase Requisitions as per specification / drawings.
Arrangement of material for use on site for smooth continuation of work.
Attend regular coordination / progress meetings with client.
Maintain specific BIM software template files to assure standards. Preparing Revit 3D Models from designer.
Early design review, validation and constructability coordination analysis and Preparing Clash reports
Verifying compliance for all local authority compliance and code compliance.
Monitor installation of all electrical Systems According to the latest revision of Shop Drawings.
Arrange/Schedule inspection of works by the Consultant at site upon raising of RFI and MIR.
Maintaining proper records of testing & commissioning of individual systems for onward submission.
Preparation & submission of monthly subcontract certificates.
Ensure compliance to handing over snags.
Preparation & submission of O&M manuals and As Built drawings to consultant for approval.
Responsible for the timelines for Quality Control, there by adhering to deadlines.
Inspecting the preliminary work with Site Engineer and Sub Contractor Engineer to identify and avoid QC challenges.
Position : Electrical/ELV Engineer Duration: Feb 2018 to Feb 2021 Employer : Egis India Engineering Consulting Pvt Ltd Projects : New Integrated Terminal Building Pune Airport, Pune. An estimated cost of Rs 382.97 Crores USD 5.5 Million Responsibilities:
Reviews of shop drawings related and ensure its compliance with designs, contract requirement and properly coordinated with other discipline.
Analyzing Material submittal for approval in accordance with all requirements of project technical specification.
Review equipment selection including, BIM 360 Clash reports, transformers, switchgear, distribution panel boards, cabling and termination units for power and lighting loads, Data & Telephone System, Closed Circuit Television, Fire Alarm & Fire Protection, Public Address System, Access Control System, Master Clock System, Distributed Antenna System, Trunk mobile radio system, Smoke Management System, Pressurized stair Case, BMS CUPPS and CUSS, Airport information display system, Baggage Handling System, signage, Passenger Boarding bridge.
Maintain specific BIM software template files to assure standards. Review Revit 3D Models from contractors and provide mark-ups/tracker as required
Early design review, validation and constructability coordination analysis and Preparing Clash reports
Verifying compliance for all local authority compliance and code compliance.
QA/QC Procedures to Ensures that all the works done are in accordance with the approved electrical drawings, contract documents, project specifications, and all applicable standards whether local, national, or international standards.
Supervisions Technically, Monitoring, Inspections (IRs, MIRs, SONs, NCRs) as per specification standards and approved shop drawing of Electrical and Low Current system
Review all procedures of testing and commissioning performed by the Contractor.
Evaluating & Approving Electrical inspector work for day-by-day inspecting of material delivered onsite/stockyard according to MIR (Material inspection request) provided by the contractor in compliance to the approved material by the designer/client.
Review & approving Electrical inspector works for day-to-day inspecting of Electrical work according to IR (inspection request) provided by contractor.
Issuing SWI’s (site work instruction) and NCR’s (Non-Conformity Report) for any discrepancy in quality of installations.
Attend weekly meetings as directed by Project Manager.
Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed off by Contractor’s QA/QC Manager.
Visit the site every day and observed wrong execute the work at site by contractor to take the picture and make it site observation Notice (SON). Position : Electrical Engineer Duration: March 2011 to November 2017 Employer : DAR AL RIYADH CONSULTANT
1) Projects : King Abdullah Financial District Project (KAFD-PPA30-Zone 3) Duration: April 2014 to November 2017
(The project Parcel-5.05, Composed of an Offices (Basement-1, 2,3,4,5, & G+38Floors) & Apartments
(Basement-1, 2, 3, 4 & G.F to 24 Floors), Parcel-5.03, Composed of Offices (Basement-1, 2,3,4,5, & G+14Floors) & Apartments (Basement-1, 2,3,4,5 & G.F to 26 Floors). 2) Projects : MOI integrated strategic project (ISP) – KAP0 Duration: March 2011 to March 2014)
(Area Command of Border Guard (Najran Area 2110),District Police Directorate (Najran Area 1010), Governorate building category A-3 (Makkah Area 3030),Drug enforcement administration (Makkah area 1150),Civil defence center (Makkah area 2070),Central defence section (Makkah area 2060),Highway patrol dispatch center (Makkah area1100),Security patrol dispatch center (Makkah area1100A),External police department (Makkah area 1080) Responsibilities:
Reviews of shop drawings related and ensure its compliance with designs, contract requirement and properly coordinated with other discipline.
Analyzing Material submittal for approval in accordance with all requirements of project technical specification.
Review equipment selection including, BIM 360 class transformers, switchgear, distribution panel boards, cabling and termination units for power and lighting loads, Data & Telephone System, Closed Circuit Television, Fire Alarm & Fire Protection, Public Address System, Access Control System, Master Clock System, Distributed Antenna System, Trunk mobile radio system, Smoke Management System, Pressurized staircase, BMS Confident in viewing contractors work method statement and material submittals.
QA/QC Procedures to Ensures that all the works done are in accordance with the approved electrical drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
Supervisions Technically, Monitoring, Inspections (IRs, MIRs, SONs, NCRs) as per specification standards and approved shop drawing of Electrical and Low Current system
Review all procedures of testing and commissioning performed by the Contractor.
Review and evaluate contractor’s monthly progress through all our Site Area
Evaluating & Approving Electrical inspector work for day-by-day inspecting of material delivered onsite/stockyard according to MIR (Material inspection request) provided by the contractor in compliance to the approved material by the designer/client.
Review & approving Electrical inspector works for day-to-day inspecting of Electrical work according to IR (inspection request) provided by contractor.
Issuing SWI’s (site work instruction) and NCR’s (Non-Conformity Report) for any discrepancy in quality of installations.
Ensure quality of work complies with contract requirements, good practice and only approved materials are used.
Make sure that all site inspections are carried out as per intervention points marked in the approved Inspection and Test Plan.
Attend weekly meetings as directed by Project Manager.
Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed off by Contractor’s QA/QC Manager.
Visit the site every day and observed wrong execute the work at site by contractor to take the picture and make it site observation Notice (SON).
Prepares site Progress reports weekly and report to our senior engineer.
Review old shop drawing and As-built drawing provided by contractor and make necessary changes...
Position : Electrical Engineer Duration: Aug 2009 to Feb 2011 Employer : Al-Najdain East for Contracting
Projects : Al-Qasr T-10 and T-11 Commercial and Apartment Building The scope of work included:-
The scope of work included all Electrical and Low Current activities such as Power House, transformer, Lighting System and Power Distribution Board, Lighting Control Panel, Fire Alarm System, MATV system, CCTV system Data/Telephone system, Access Control system, Public address System, Roles and Responsibilities:
Preparation of Project Study Report as per standard format.
Preparation of Material Log.
Obtaining approvals of drawings / material submittals from concerned authority /consultant.
Preparation of comparison statement along with technical & commercial evaluation and onward submission to HOD.
Raising RFIs (Request for Information) in coordination with drafting and Project Manager.
Review of Method Statements / ITPs for the project.
Management all subcontractors and following up implementations Verification of materials received at site.
Raising Purchase Requisitions as per specification / drawings.
Arrangement of material for use on site for smooth continuation of work.
Attend regular coordination / progress meetings.
Timely preparation of variations
Monitor installation of all electrical Systems According to the latest revision of Shop Drawings.
Arrange/Schedule inspection of works by the Consultant at site upon raising of RFI and MIR.
Maintaining proper records of testing & commissioning of individual systems for onward submission.
Preparation & submission of monthly subcontract certificates.
Ensure compliance to handing over snags.
Preparation & submission of O&M manuals.
To hand over the marked up drawings as per site conditions to the drawing department.
Preparing and Submission of As Built drawings to consultant for approval.
Ensure healthy working condition between supervisors and workers. Position : Electrical Engineer Duration: Sep 2008 to May 2009 Employer : Siemens Dimatic Middle East LLC
Projects : Dubai Airport Terminal 3
Roles and Responsibilities:
Making program Siemens 300 serious Modules, SCADA, and HMI.
Maintenances Siemens PLC, SCADA, HMI, Servo Motor, Variable Frequency Drives, Inverter, PID Controller, Encoder, Relay, Sensors and Circuit Breakers.
Electrical Supervision of Testing and Commissioning.
Preparation of work history sheets according to site condition, type of work and materials involved.
Daily work schedule and instructions given to Site Electrical Supervisor.
Updates SAP with actual Manpower for each work request executed by the Reliability Supervisor and Technicians.
Preparing of reports and sending recommendations to Reliability Senior Engineer Project.
Punch List Clearing and Line Checking.
Maintaining Manpower Shift duties.
Preparation of Bill of Materials.
Involved in the Work of Quality Assurance/Quality Control Engineering.
Maintaining of Safety and Quality aspects.
Position : Design Site Engineer Duration: June 2007 to Aug 2008 Employer : Dowa High Temp Furnace Ltd, (India)
Roles and Responsibilities:
In the field of industrial Automation which includes programming, testing, Commissioning, and servicing responsibilities.
Hardware configuration and programming of PLC systems: Siemens S6-series, Mitsubishi PLC and LG PLC(XG5000 SERIES,MASTER K120 SRIES)
Programming of SCADA systems: (MOVICON, I conics and Spec view- Honeywell) and Wide practical experience with communication protocols MODBUS SERIAL, MODBUS TCP/IP, Profibus and Ethernet.
Hardware configuration and programming of HMI systems REDLION (G304, G306, G308, G310) and Proface HMI.
Preparation of I/O List, Flow Chart, Sequence of operation, Project schedule, Ladder Logic and panel testing
Preparation of Project Report and Documentation.
Designing Electrical diagram with using AutoCAD.
Drives Programming and Various Braking Method.
Support for PC hardware and software. Knowledge of operating systems: Windows NT/2000/XP, Windows95/98 & Vista
Maintaining of Safety and Quality aspects.
Position : Assistant Electrical Engineer Duration: June 2006 to May 2007 Employer : Sand Fits Unit II
Projects : New Industrial foundry
Roles and Responsibilities:
Installing and Testing systems are Earthing system, Lightning system, Lighting system, Power outlets, Main Distribution Panel (MDP), Emergency Main Distribution Panel (EMDP) and Sub-Panel Boards.
Installation and testing of 3 numbers 11KV/440V substation compressing of 1000KVA Transformer substations.
Installation and testing of 3 number Vacuum Circuit breaker, and 2 number of Air Circuit breaker.
Installation and testing of MV cable and Low voltage cable in entire plant.
Planning and execution of scheduled Preparation like maintenance programs scheduled preparation, Erection team preparation, Commissioning team preparation, Material purchases list preparation.
Responsibility included but not limited to the overall Electrical and Electronics maintenances of the plant 66/11KV Transformers and substation, Interlocking system, motor from 0.1 hp to 400hp, Eddy Current and VFD (Variable Frequency Drivers), induction motors, Diesel generator, Relays etc…
Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirement and reviewing radiographic films.
Supervision and Implementation of maintenances and Erection.
Responsible for the maintenances PLC and HMI.
Maintaining Manpower Shift Duties.
Preparation of Bill of Materials.
Maintaining of Safety and Quality aspects.
Software skills:
AutoCAD
Personal Details:
Date of Birth : 04. July. 1984
Sex : Male
Marital Status : Married
Nationality : Indian
Language Known : Arabic, English, Hindi & Tamil
Declaration
I hereby undertake that all the details furnished above are true to my knowledge Syed Nivas Syed Ibrahim
Applicant